ULNRC-05994, Review of Safety Evaluation with Open Items

From kanterella
Jump to navigation Jump to search
Review of Safety Evaluation with Open Items
ML13156A351
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/05/2013
From: Kanuckel L
Ameren Missouri, Union Electric Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML131560446 List:
References
ULNRC-05994
Download: ML13156A351 (4)


Text

~~

'WAmeren MISSOURI Callaway Plant June 05, 2013 ULNRC-05994 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:

10 CFR 2.101 10 CFR 2.109(b) 10 CFR 50.4 10 CFR 50.30 10 CFR 51.53(c) 10 CFR 54 DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF -30 REVIEW OF SAFETY EVALUATION WITH OPEN ITEMS

References:

1) ULNRC-05830 dated December 15, 2011
2) Safety Evaluation Report with Open Items Related to the License Renewal of Callaway Plant, Unit 1 (TAC No. ME7708), dated April 23,2013.

By the Reference 1 letter, Union Electric Company (Ameren Missouri) submitted a license renewal application (LRA) for Callaway Plant Unit 1. Reference 2 dated April23, 2013 transmitted the Safety Evaluation Report (SER) with Open Items Related to the License Renewal of Callaway Plant, Unit 1.

As requested in Reference 2, we have reviewed the SER for accuracy and are providing comments (refer to Enclosure 1-Technical Comments and Enclosure 2-Editorial Comments) for your consideration.

It should be noted that there are no changes to commitments contained within this response.

PO Box 620 Fulton, MO 65251 AmerenMissouri.com

ULNRC-05994 June 05, 2013 Page 2 If you have any questions with regard to this matter, please contact me at (573) 823-9286 or Ms. Sarah Kovaleski at (314) 225-1134.

Sincerely,

~Y Les H. Kanuckel Director Engineering Design DS/SGK/nls

Enclosures:

1) Technical Comments Regarding the Safety Evaluation Report (SER) with Open Items Related to the License Renewal of Callaway Plant, Unit 1
2) Editorial Comments Regarding the Safety Evaluation Report (SER) with Open Items Related to the License Renewal of Callaway Plant, Unit 1

ULNRC-05994 June 05, 2013 Page 3 cc:

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Mr. Arthur T. Howell Regional Administrator U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Samuel Cuadrado De Jesus Project Branch 1 Division of License Renewal Office ofNuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11F1 Washington, DC 20555 Mr. Fred Lyon Project Manager, Callaway Plant Office ofNuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8B 1 Washington, DC 20555-2738 Mr. Gregory A. Pick U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511

ULNRC-05994 June 05,2013 Page4 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Tech Spec ULNRC Distribution:

A. C. Heflin F. M. Diya C. 0. Reasoner III B. L. Cox L. H. Graessle J. S. Geyer S. A. Maglio R. Holmes-Bobo NSRB Secretary L. H. Kanuckel M. A McLachlan G. S. Kremer S. G. Kovaleski T. B. Elwood G. G. Yates E. Blocher (STARS PAM COB)

STARS Regulatory Affairs Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP)

Missouri Public Service Commission Ms. Leanne Tippett Mosby (DNR)