ULNRC-05967, 124939/13, Rev. 0, Callaway Energy Center Unit 1 Flooding Hazard Reevaluation Report. Part 2 of 2

From kanterella
(Redirected from ULNRC-05967)
Jump to navigation Jump to search
124939/13, Rev. 0, Callaway Energy Center Unit 1 Flooding Hazard Reevaluation Report. Part 2 of 2
ML13071A317
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/06/2013
From:
Paul C. Rizzo Associates
To:
Office of Nuclear Reactor Regulation
Shared Package
ML130710492 List:
References
ULNRC-05967 124939/13, Rev 0
Download: ML13071A317 (17)


Text

Station #

06934000 Station #

06927240 Station #

06909000 Station #

06934500 Station #

06927200 Station #

06927100 X

X X

X X

X X

^

Boone Callaway Osage Audrain Cole Morgan Cooper Howard Gasconade Moniteau Montgomery Sources: Esri, DeLorme, NAVTEQ, USGS, Intermap, iPC, NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, 2012

£ Figure 1-1 Location Map of Site PREPARED FOR Callaway Flooding Hazard Reevaluation Report KMR 8 NOV 12 Legend

^

Site Centerpoint X

USGS Gauge Stations County Boundaries DRAWN BY CHECKED BY APPROVED BY GIS FILE NUMBER 12-4939-GIS-A009

References:

1) Esri, DeLorme, NAVTEQ, USGS, Intermap, iPC, NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand),TomTom, 2012 at:http://goto.arcgisonline.com/maps/World_Street_Map
2) (Ameren Missouri, 2012), Callaway Energy Center Unit 1, Final Safety Analysis Report (FSAR)

Callaway-SA Section 2.4, Hydrology, Rev.OL-19a, May 2012.

3) (Ameren Missouri, 2009), Callaway Energy Center Unit 2, Final Safety Analysis Report (FSAR), Rev 2, February, 2009.

Coordinate System: NAD 1983 UTM Zone 14N Projection: Transverse Mercator RF: 1:645,000 0

6 12 18 3

Miles Missouri River Missouri River Auxvasse Creek Roads Jefferson City River/Stream JML CJE 1 FEB 13 1 FEB 13

.-m I

0>

I"")

0>

""'" I C\\1

~0:::

-w LLm o::::!!:

<(=>

(.)Z (D (D 0

0 w w

.:: e;

(.) 0:::

w a..

I

(.) a..

<(

z

~>-

o:::ID 0

(0) 00£99-X-0099 N I02,QOO~,.--* -~-~ _

N 101,7~0 N 101, 00.

101,,000

/

\\

~

w

!\\

~

~':--),

Reference:

Ameren Missouri, 2012, "Final Safety Analysis Report (FSAR)

Callaway-SA," Revision OL-19a, May 2012.

N 00,750.

-~ 100.2;50" U.H.S. RETENTION POND N 100,500

.~HO~rO_QO

~ -;;Y(~~~~~::r-50

,~-~~/',

POINT NO.

I 2

3 4

5 7

B B

10 II 100,531 100,600 100,940.3 100,985.4 100.600 99,S15.6 99,814.5 99,593.08 99,814.5 99,174 hiT_

I Tt 837.04X j l PROBABLE MAXIMUM PRECIPITAT-IOt-1 CP.M.P.)

OVERFLOW POINTS WATER AREA*

llEL.*

SURF. El.*

100,1118 100,107.5 99,340.0 99,331.9 99,826 99.685 99,564.5 9!1,5.28 99,475.5 100,117

/.----

    • _c~~

POINTNO.

E 26 27

28.

29 30 31 33 34 35 "

3i 38 3B 40 41 42 99,313 96,612Tii100,145 100,948.4 99,752.6 100,655.3 99,604.6 100,948.4 99,486.2 100,012.1 99,595 100,985.4 99,340 99,973.9 99,028

]:::~~:~

~f~-1 99,926.2 98,524.3 98.200 100,320 97,943.2 99.955.5 100,985.4 100,380 101,011.6 100,050 99,825~3 98,677.B 98,905 98,910 99,313 100,145T0100.456.3 100,843.8 100,340.2 9!1,313 99,750T0100,145 9~,810 lOll, 210 WUER SURF EL.*

S C A L E 400 0

400 FEET FIGURE 2-1 DESIGN SITE LAYOUT AND TOPOGRAPHY PREPARED FOR CALLAWAY ENERGY CENTER FLOODING HAZARD REEVALUATION REPORT

~

Paul C. Rizzo Associates, Inc.

~-~ ~ ENGINEERS/CONSULTANTS/CM

11 22 33 44 55 66 77 88 99 10 10 Source: Esri, i-cubed, USDA, USGS, AEX, GeoEye, Getmapping, Aerogrid, IGN, IGP, and the GIS User Community 91°4625"W 91°4625"W 91°4630"W 91°4630"W 91°4635"W 91°4635"W 91°4640"W 91°4640"W 91°4645"W 91°4645"W 91°4650"W 91°4650"W 91°4655"W 91°4655"W 91°470"W 91°470"W 91°475"W 91°475"W 91°4710"W 91°4710"W 38°4540"N 38°4535"N 38°4530"N 12-4939-GIS-B001 Figure 2-2 Locations of Safety-Related Structures, Systems, and Components Prepared For Coordinate System: NAD 1983 UTM Zone 14N Projection: Transverse Mercator

References:

1.Source: Esri, i-cubed, USDA, USGS, AEX, GeoEye, Getmapping, Aerogrid, IGN, IGP, and the GIS User Community at http://goto.arcgisonline.com/maps/World_Imagery GJO DRAWN BY CHECKED BY APPROVED BY GIS FILE NUMBER Callaway Flooding Hazard Reevaluation Report

2. Ameren Missouri, 2012, "Final Safety Analysis Report (FSAR) Callaway-SA" Rev. OL-19a, 2012 Legend Safety-Related Structures Essential Service Water Intake Piping Essential Service Water Return Piping 0

900 1,800 450 Feet RF: 1:3,000 15 NOV 2012 JML CJE 1 Feb 2013 1 Feb 2013

LEGEND:

L

~

STRUCTURE ROAD

~Js--------

CONTOUR SCALE JOO 0

JOO FEET FIGURE 2-3 AS-BUILT SITE LAYOUT AND TOPOGRAPHY PREPARED FOR CALLAWAY ENERGY CENTER FLOODING HAZARD REEVALUATION REPORT

~

Paul C. Rizzo Associates, Inc.

1-'-.-- ~

ENGINEERS I CONSULTANTS I CM

Use site-specific data to refine PMF for local intense precipitation flooding using HEC-HMS models.

DRAWN BY Stop. Flooding protection to exposed SSCs must be provided.

12-4939-A1 FIGURE 3-1 THE HHA DIAGRAM FOR LOCAL INTENSE PRECIPITATION FLOODING ANALYSIS PREPARED FOR CALLAWAY ENERGY CENTER FLOODING HAZARD REEVALUATION REPORT

~

Paul C. Rizzo Associates, Inc.

~~

-~ ENGINEERS I CONSULTANTS I CM

"V m

I OJ rt)

OJ "V

I C\\1 1.8

~Q:

rq~

1.6

~~

1.4

~ 1.2

.J:

u 1: *-

1

-1:

0 *-

+'

-~ 0.8

c.

~

i'D u

~ 0.6 0

0 Q.

w ~

~

frl Q:

0.4

X: c...

0 ~

0.2 0

0 8

16 24 32 40 48 56 64 Time (hours)

PROBABLE MAXIMUM STORM FOR LOCAL INTENSE PRECIPITATION 72 0

30 60 90 120 150 180 210 240 270 300 330 360 Time (minutes) 6-HOUR LOCAL INTENSE PRECIPITATION HYETOGRAPH FIGURE 3-2 LOCAL INTENSE PRECIPITATION HYETOGRAPHS PREPARED FOR CALLAWAY ENERGY CENTER FLOODING HAZARD REEVALUATION REPORT

~

Paul C. Rizzo Associates, Inc.

~~-~

ENG~S/CONSULTANTS/CM

I EGENP:

~ SUBBASIN 12 SUBBASIN NUMBER

~SUBBASIN c___J DELINEATION

~ 1 0 l&+ 12

~ 1 1 2

&. 1114 (NOT TO SCALE)

FIGURE 3-3 HEC-HMS MODEL FOR THE SITE DRAINAGE ANALYSIS PREPARED FOR CALLAWAY ENERGY CENTER FLOODING HAZARD REEVALUATION REPORT

~

Paul C. Rizzo Associates, Inc.

~~

-~ ENGINBBRS/CONSULTANTS/CM

(10)

(12)

(13)

(17)

(19)

(20)

(21)

(22)

(52)

(24)

(25)

(26)

(30)

(31)

(33)

(34)

(35)

(37)

(41)

(42)

(1093)

(43)

(47)

(48)

(49)

(50)

(51)

(53)

(54)

(55)

(56)

(58)

(1091)

(1092)

(1094)

(1095)

(1098)

(1099)

(1101)

(1102)

(1112)

(1113)

(1114)

(1130)

(1132)

(1133)

(1134)

(1135)

(1136)

(18)

(1131) 832.54 838.22 836.48 838.22 838.22 838.66 840.83 832.88 839.58 838.89 842.55 837.18 840.17 839.18 840.5 840.17 835.14 853.54 843.81 831.19 834.72 847.88 837.9 838.61 839.34 840.03 833.75 840.21 840.21 837.17 837.19 840.17 845.6 840.16 828.02 840.21 827.19 840.14 840.16 826.99 832.23 823.95 840.21 840.16 838.47 839.66 833.76 843.81 835.36 838.7 840.17 11 22 33 44 55 66 77 88 99 10 10 Source: Esri, i-cubed, USDA, USGS, AEX, GeoEye, Getmapping, Aerogrid, IGN, IGP, and the GIS User Community DRAWN BY CHECKED BY APPROVED BY GIS FILE NUMBER Legend Model Catchment Sub-basins Safety-Related Structures, Systems, 1,000 0

1,000 2,000 500 Feet Callaway Flooding Hazard Reevaluation Report Inundation Map of the Reevaluated Design Flood Level Prepared For Coordinate System: NAD 1983 StatePlane Missouri Central FIPS 2402 Feet Projection: Transverse Mercator RF: 1:7,500

References:

1.Source: Esri, i-cubed, USDA, USGS, AEX, GeoEye, Getmapping, Aerogrid, IGN, IGP, and the GIS User Community at http://goto.arcgisonline.com/maps/World_Imagery

2. Ameren Missouri, 2012, "Final Safety Analysis Report (FSAR) Callaway-SA" Rev. OL-19a, 2012 Figure 3-4 GJO 10 Jan 2013 12-4939-GIS-B004 and Components Inundation Area 840.17 Peak Flood Elevation for Subbasins (22)

(52)

(24)

(26)

(30)

(31)

(33)

(34)

(35)

(49)

(50)

(51)

(53)

(55)

(56)

(58)

(1091)

(1092)

(1101)

(1102)

(1130)

(1132)

(1133)

(1134)

(1136)

(1131)

(1093) 839.58 837.18 840.17 839.18 840.5 840.17 835.14 838.61 840.03 833.75 1

837.17 837.19 840.17 840.16 845.60 840.21 838.47 833.76 835.36 838.7 838.89 839.34 839.66 840.21 840.17 840.16 840.16 11 22 33 44 55 66 77 88 99 10 10 omm unity JML CJE 5 Feb 2013 5 Feb 2013

Use site-specific data to refme analysis.

DRAWN BY No CHECKED BY 12-4939-A2 APPROVED BY Stop. Flooding protection to exposed SSCs must be provided.

FIGURE 3-5 THE HHA DIAGRAM FOR RIVER FLOODING ANALYSIS PREPARED FOR CALLAWAY ENERGY CENTER FLOODING HAZARD REEVALUATION REPORT

~

Paul C. Rizzo Associates, Inc.

~~-~

HNG~/CONSULTANTS/CM

Sources: Esri, DeLorme, NAVTEQ, USGS, Intermap, iPC, NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, 2012 Coordinate System: NAD 1983 UTM Zone 14N Projection: Transverse Mercator Watershed Map Callaway Flooding Hazard Reevaluation Report PREPARED FOR:

Legend Site Centerpoint Auxvasse Creek Watershed Auxvasse Creek Watershed 347.2 mi2 0

5 10 15 20 2.5 Miles DRAWN BY KMR 20 Dec 2012 CHECKED BY APPROVED BY GIS FILE NUMBER 12-4939-GIS-A001 Figure 3-6 Roads Streams County Boundary RF: 1:300,000

References:

1. Esri, DeLorme, NAVTEQ, USGS, Intermap, iPC, NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand),TomTom, 2012 at: http://goto.arcgisonline.com/maps/World_Street_Map 2.(USDA, 2008) United States Department of Agriculture (USDA), Natural Resources Conservation Service (NRCS) 12-digit HUC Boundaries, 2008, Auxvasse Creek Watershed Boundary, Website: http://datagateway.nrcs.usda.gov/;

Date Accessed: 15 November 2012 Date Accessed: 1 February, 2013 M

i s

s o

u r

i R

i v

e r

JML CJE 1 FEB 2013 1 FEB 2013

0.8

-0.7

~

1 0.6 u

~ 0.5 s::::

.2 0.4 RJ

.~ 0.3 D. *-

~ 0.2 c.. 0.1 0

DRAWN BY CHECKED BY APPROVED BY 0

4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 Time (hours) 12-4939-A9 PROBABLE MAXIMUM STORM FORAUXVASSECREEKWATERSHED FIGURE 3-7 WATERSHED HYETOGRAPH PREPARED FOR CALLAWAY ENERGY CENTER FLOODING HAZARD REEVALUATION REPORT

~

Paul C. Rizzo Associates, Inc.

1-'-.- ~

ENGINEERS I CONSULTANTS I CM

88 5 88 10

0.

88 2 SB 11 88 25 SB 45 SB 51 88 56 88 61 DRAWN BY 88 24

0. ~ 24~es
828 ~

Junc11on 20 CHECKED BY APPROVED BY

~ SB 57 12-4939-AB LEGEND SB 24 SUBBASIN NUMBER

~ SUBBASIN

+

RIVER REACH

\\f5 JUNCTION t=J RESERVOIR FIGURE 3-8 HEC-HMS MODEL FOR THE WATERSHED DRAINAGE ANALYSIS PREPARED FOR CALLAWAY ENERGY CENTER FLOODING HAZARD REEVALUATION REPORT

~

Paul C. Rizzo Associates, Inc.

~~

-~ ENGINEERS/CONSULTANTS/CM

760 700 860 600 5011 0

z

~~

c

  • CECUnitt Logan Creek XSCutUn" AuXV.UM Rl\\'t!lr
  • XSCutUnet NHDFiowllne

<all other v~tlues>

AuiCYftiM Creek 81ueCteek

- LoganCte~ek MOOCtMk c:::JBaolno

+

~

+

t

~

+

~

~

+

1DOOO 15000 20000 25000 30000 Main CheniMII Dllltai'IQII (II)

AUXVASSE CREEK WATER SURFACE PROFILE (NOT TO SCALE)

HEC-RAS MODEL (NOT TO SCALE) 680 570 580 530 I

T r,-

r

]

40000 680 680 640 820 g510 li 1 W58Q 560 640 600 r

r r r-r r r r r r

I I~

1-I~

1-I-+-

  • -It

~

1-

+

l;J

~

.__ f-1-

1-v~~

lrlr~J\\...1 V" I"N--

.wj t

~ v 1 l

~v-

~

I 1- -

l 0

2000 4000 eooo eooo 10000 Main Cha'lnal D~

{ft)

LOGAN CREEK WATER SURFACE PROFILE (NOT TO SCALE) 12000 r

~

It 11 rrr 1r1r

,-AJ/ i t MUD CREEK WATER SURFACE PROFILE (NOT TO SCALE)

LEGEND

___ HEC-RAS SCENARIO 4 EXISTING CONDITIONS GROUND FIGURE 3-9 HEC-RAS MODEL FOR RIVER FLOODING PREPARED FOR CALLAWAY ENERGY CENTER FLOODING HAZARD REEVALUATION REPORT

~

Paul C. Rizzo Associates, Inc.

~-~ ~

ENG~S/CONSULTANTS/CM

Yes Fail a ll pote-nt1ally critical dams DRAWN BY CHECKED BY APPROVED BY 12-4939-AS Procl!j!d w1th comple-tmg floodmg re-evaluat1on w1thout furthe-r :lam failure-considerations Step. Flooding protection to expose-d SSC's must be provided.

Refine input to use existing condit ions case ( Include transformation, routing through channels, with loss and existing<o-nditions).

FIGURE 3-10 THE HHA DIAGRAM FOR DAM BREAK ANALYSIS PREPARED FOR CALLAWAY ENERGY CENTER FLOODING HAZARD REEVALUATION REPORT

~

Paul C. Rizzo Associates, Inc.

~~

-~ ENGINBBRS/CONSULTANTS/CM

<(

I m

I")

m v

I N

~a::

-w

..._m o::E tj~

z

~>-

o::m 0

Legend:

BUidllgs

.& Dams RiverJSireem Subbasins D

OO'Mlstre~m Sub-~~ns D

Upstream S'Jb-basils topography. Ft High

  • 964096 Low: 511.162 Storage Depth below 810ft. Ft 0.01105 51020 c=J 20to50 O

solo100 1001o300 0

25 N

A FIGURE 3-11 LOCATIONS OF DAMS NEAR THE SITE PREPARED FOR CALLAWAY ENERGY CENTER FLOODING HAZARD REEVALUATION REPORT

~

Paul C. Rizzo Associates, Inc.

~~

-~ ENGINEERS I CONSULTANTS I CM

0...... < I 0')

I"')

0')

I N

(NOT TO SCALE)

FIGURE 3-12 CENTRAL STABLE REGION PREPARED FOR CALLAWAY ENERGY CENTER

Reference:

FLOODING HAZARD REEVALUATION REPORT Ameren Missouri, 2012. "Final Safety Analysis Report

~

Paul C. Rizzo Associates, Inc.

(FSAR) Callaway-SA." Revision OL-19a, May 201 2.

I~

~

ENGINEERS I CONSULTANTS I CM

Use site-specific data to refine analysis DRAWN BY CHECKED BY APPROVED BY 12-4939-AS FIGURE 3-13 THE HHA DIAGRAM FOR COMBINED EVENTS FLOODING ANALYSIS PREPARED FOR CALLAWAY ENERGY CENTER FLOODING HAZARD REEVALUATION REPORT

~

Paul C. Rizzo Associates, Inc.

1-'-- ~

ENGINEERS I CONSULTANTS I CM