ULNRC-04754, September 2002 Monthly Operating Report for Callaway Plant Unit 1

From kanterella
Jump to navigation Jump to search
September 2002 Monthly Operating Report for Callaway Plant Unit 1
ML022960441
Person / Time
Site: Callaway Ameren icon.png
Issue date: 10/11/2002
From: Witt W
AmerenUE
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC-04754
Download: ML022960441 (4)


Text

PO Box 620 Fulton, MO 65251 October 11, 2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 wAmeren Uf ULNRC04754 Ladies & Gentlemen:

DOCKET NUMBER 50-483 UNION ELECTRIC CO.

CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT SEPTEMBER/2002 The enclosed Monthly Operating Report for September/2002 is submitted pursuant to Section 5.6.4 of the Callaway Unit 1 Technical Specifications.

Warren A. Witt Manager, Callaway Plant WAW/JER/slk Enclosure a subsidiary ofAmeren Corporation N

Union Electric Callaway Plant

ULNRC04754 October 11, 2002 Page 2 cc: Mr. Ellis W. Merschoff Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack Donohew (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7El Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102 Mr. Thomas A. Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street N.W.

Washington, DC 20037

'a Enclosure ULNRC04754 October 11, 2002 DOCKET NO.:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

FAX:

50-483 CALLAWAY UNIT I J. E. Ready 573/676-8617 573/676-4202 REPORTING PERIOD:

September/2002

1.

DESIGN ELECTRICAL RATING (MWe-Net): 1171

2.

MAX. DEPEND. CAPACITY (MWe-Net): 1125 THIS MONTH YR TO DATE CUMULATIVE NUMBER OF HOURS REACTOR WAS CRITICAL HOURS GENERATOR ON-LINE REACTOR RESERVE SHUTDOWN HOURS NET ELECTRICAL ENERGY GENERATED (MWH) 720 720 0.0 819,190 6,231 6,185 00 6,992,590 140,194 138,335 0.0 152,150,108 Page 1 of 2

3.
4.
5.

6.

Enclosure ULNRC04754 October 11, 2002 UNIT SHUTDOWNS DOCKET NO.:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

FAX:

50-483 CALLAWAY UNIT 1 J. E. Ready 573/676-8617 573/676-4202 REPORT: September/2002 TYPE F: FORCED NO.

DATE S:SCHEDULED DURATION (HOURS)

METHOD OF SHUTTING DOWN REASON THE REACTOR CORRECTIVE ACTIONS/COMMENTS

SUMMARY

The Callawav Plant did not have a shutdown during the month of September.

REASON A: EQUIPMENT FAILURE (EXPLAIN)

B: MAINT. OR TEST C: REFUELING D: REGULATORY RESTRICTION E: OPERATOR TRAINING / LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER (EXPLAIN)

METHOD 1: MANUAL 2: MANUAL SCRAM 3: AUTOMATIC SCRAM

4. CONTINUATION 5: OTHER (EXPLAIN)

Page 2 of 2