.4 Amergen.
An Exelon Company Clinton Power Station R. R.3, Box 228 Clinton, IL 61727 1 OCFR50.36 U-603712 January 12, 2005 U. S. Nuclear Regulatory Commission ATTN: Documniiet Contifrol Desk 6 D e-Washington, D.C. 20555-0001 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461
Subject:
December 2004 Monthly Operating Report Please find in the Attachment the Monthly Operating Report for Clinton Power Station, Unit 1, for the period ending December 31, 2004.
Respectfully, W.S. iff Regulatory Assurance Manager Clinton Power Station JLP/bif_
Attachment cc:
Regional Administrator - NRC Region IlIl NRC Senior Resident Inspector - Clinton Power Station Illinois Emergency Management Agency - Division of Nuclear Safety
OPERATING DATA REPORT Attachment to U-603712 DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIC 50-461 Clinton 1 January 11,2005 P.K. Ryan 217-937-2201 December 2004
- 1.
Design Electrical Rating
- 2. Maximum Dependable Capacity (MWe-Net) 1,062.00 1,022.00 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 8,135.65 105,554.20
- 4. Number of Hours Generator On-line 744.00 7,912.61 103,137.34
- 5.
Reserve Shutdown Hours 0.00 0.00 4.00
-6.Net'Electrical Energy Geherated (MWHrs) 782,457.00 -- 8,000,416.78 --92,524,303.48 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason 1 Down 2 Comments
SUMMARY
- There were no forced losses in December. Planned losses were associated with scheduled surveillance testing.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
I Challenges to Main Steam Safety Relief Valves: None I
Page 1 of 1