TXX-3470, Forwards 820201 Table Providing Change Descriptions for Amend 30
| ML20040F727 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 02/03/1982 |
| From: | John Marshall TEXAS UTILITIES SERVICES, INC. |
| To: | Burwell S Office of Nuclear Reactor Regulation |
| References | |
| TXX-3470, NUDOCS 8202100224 | |
| Download: ML20040F727 (5) | |
Text
r a
TEXAS UTILITIES SERVICES INC.
Log # TXX-3470 2<xn mnu um ai. nsuu.u:xas vr>2 '
File # MMO O * *d N05-0~
February 3,1982 ed So-444 Mr. S. B. Burwell CoM A e4CH E PEM Licensing Project Manager U. S. Nuclear Regulatory Corrmission Office of Nuclear Reactor Regulation Washington, D.C.
20555
Dear Mr. Burwell:
Please find attached a table providing the description of Amendment 30, dated February 1,1982.
If you have any questions or comments, please call.
Sincerely,
1"k!A J. S. Vsrshall RWH/grr Attachment D
g A
e' am.2 m 3 5 mown 2 fSn]fEa*11l ws/g
@s i
Is,I 8202100224 820203 PDR ADOCK 05000445 A
PDR i
7-AMENDMENT 30 DESCRIPTION February 1,1982 SECTION DESCRIPTION OF CHANGE 2.3 Provides editorial correction.
3.6B 3.7N 3.7B Corrected location of seismic detectors.
3.8 Expands the options for required material certifications of structural steel.
T3.9N-9 Deletes the containment spray pump and the spent fuel pit pump from the table showing the Westinghouse supply scope.
3.9B Provides editorial correction.
T3.118-4 6.4 7.3 8.1 Preferred and alternate offsite power sources reversed.
8.2 Preferred and alternate offsite power sources reversed.
J v
e v
p-r w-y
SECTION DESCRIPTION OF CHANGE 8.3 Preferred and alternate offsite power sources reversed.
Updated maximum load values for startup transformers.
Updated standby diesel generator starting and loading sequence (Figure 8.3-3).
T8.3-3 Refer to 8.3 F8.3-1 F8.3-3 F8.3-6 F9.4-8 Provides update.
~
F9.4-11 Provides editorial correction.
F9.4-12 F9.4-15 Provides update.
9.4C Provides reference to F9.4-15.
9.5 Provides editorial correction.
T11.5-3 F13.1-6 Provides CFUR stipulation on technical qualifications (Contention 1).
SECTION DESCRIPTION OF CHANGE i
F15.0-1 Provides editorial correction.
15A T17A-1 Includes QA requirements for impulse tubing supports.
i 0032.8 Deleted BIT information.
Q040.44 Refer to 8.3 Q040.49 Refer to 8.3.
I Updated Class 1E bus voltages.
Deleted discussion on VAR compensation.
4 T040.109-1 Preferred and alternate offsite power sources reversed.
F040.109-1 Preferred and alternate offsite power sources reversed.
Incorporated previous commitment on "S" signal interface.
123.0 Provides editorial correction.
Q212.54 Q212.55 Deletes valves eliminated by BIT removal.
4
._ _._ _.=__.. _._ _- _ __ __
i 1
.SECTION
. DESCRIPTION OF CHANGE i
221.0' Provides Editorial Correction.
a 233.0 i
I 251.0 a
260.0-a 281.0
=
311.0 1
a
)
372.0 490.0 t
i l
491.0 i
EFFECTIVE-PAGE LIST Provides Update.
t t
i i
l i
s i
i l'
i.
h L
4_.
1 1
.-....a...-..
. _ _. =.,.. _.... _ _ _.. - - - _ _ _ _ _,..,, - - _., _..
. - - _ _ _ _. _.,..