TAC:51699
From kanterella
Jump to navigation
Jump to search
Request for: Open | |
Initiation
Questions Answers Results
Other: 05000298/LER-1983-011-01, /01T-0:on 830710,welds CSA-BJ-5 & 6 Found Leaking During Grinding of Weld Crowns.Caused by Intergranular Stress Corrosion Cracking.Welds to Be Repaired by Weld Overlay Methods.Piping Will Be Replaced, 05000368/LER-1982-020-03, /03L-0:on 820529,during Power Escalation,Battery Bank 2D01 Voltage Dropped to 121-volts Dc.Caused by Primary Voltage Supply to Inverters 2Y-11,2Y-13 & 2Y-25 Switching to Battery Bank 2D01, A830019, Forwards Info Re Intergranular Stress Corrosion Cracking Observed in Core Spray & Reactor Water Cleanup Sys,Per 830822 Request.Weld Overlay Repairs Meet Safety Margins of App X to Section IX of ASME Code, ML20024D981, ML20027B539, ML20080D807, ML20080D823 | |
| From | |
MONTHYEARIR 05000312/19820161982-05-0505 May 1982
[table view]IE Insp Rept 50-312/82-16 on 820401-0502.No Noncompliance Noted.Major Areas Inspected:Operational Safety verification,long-term Shutdown Activities,Maint & Surveillance Observations & Followup on Regional Requests 05000368/LER-1982-020-03, /03L-0:on 820529,during Power Escalation,Battery Bank 2D01 Voltage Dropped to 121-volts Dc.Caused by Primary Voltage Supply to Inverters 2Y-11,2Y-13 & 2Y-25 Switching to Battery Bank 2D011982-06-25025 June 1982 /03L-0:on 820529,during Power Escalation,Battery Bank 2D01 Voltage Dropped to 121-volts Dc.Caused by Primary Voltage Supply to Inverters 2Y-11,2Y-13 & 2Y-25 Switching to Battery Bank 2D01 ML20027B5391982-09-13013 September 1982 Forwards Requested Info Re Auxiliary Feedwater Stabilized Internal Header.Includes B&W Info Re Commitment to Prepare Design Rept for Modified Steam Generator & Auxiliary Feedwater Piping Sys 05000298/LER-1983-011-01, /01T-0:on 830710,welds CSA-BJ-5 & 6 Found Leaking During Grinding of Weld Crowns.Caused by Intergranular Stress Corrosion Cracking.Welds to Be Repaired by Weld Overlay Methods.Piping Will Be Replaced1983-07-20020 July 1983 /01T-0:on 830710,welds CSA-BJ-5 & 6 Found Leaking During Grinding of Weld Crowns.Caused by Intergranular Stress Corrosion Cracking.Welds to Be Repaired by Weld Overlay Methods.Piping Will Be Replaced ML20024D9811983-07-28028 July 1983 Advises That Responsibility for Evaluating Proposed Actions Re IE Bulletin 83-02 Concerning Recirculation Sys Pipe Cracks Transferred to Div of Licensing A830019, Forwards Info Re Intergranular Stress Corrosion Cracking Observed in Core Spray & Reactor Water Cleanup Sys,Per 830822 Request.Weld Overlay Repairs Meet Safety Margins of App X to Section IX of ASME Code1983-08-23023 August 1983 Forwards Info Re Intergranular Stress Corrosion Cracking Observed in Core Spray & Reactor Water Cleanup Sys,Per 830822 Request.Weld Overlay Repairs Meet Safety Margins of App X to Section IX of ASME Code ML20080D8231983-08-25025 August 1983 Revised Tech Specs Re Limiting Conditions for Operation & Surveillance Requirements of Coolant Leakage During Cycle 9 Operation ML20080D8071983-08-25025 August 1983 Forwards Revised Tech Specs Re Limiting Conditions for Operation & Surveillance Requirements of Coolant Leakage, During Cycle 9 Operation,Per 830824 Request 1983-07-20 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:51699&oldid=4630707"