Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20136A453 + (Updated Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Bevond-Desiqn-Basis External Events (Order Number)
- ML20136A454 + (Updated Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Bevond-Desiqn-Basis External Events)
- LR-N16-0194, Updated Owners, Officers, Directors, and Executive Personnel + (Updated Owners, Officers, Directors, and Executive Personnel)
- LR-N14-0182, Updated Owners, Officers, Directors, and Executive Personnel (Oodeps) Form + (Updated Owners, Officers, Directors, and Executive Personnel (Oodeps) Form)
- ML20214F520 + (Updated PNO-I-86-092A:on 861119,offsite Power Supplies Restored.Cause Not Determined.Monthly Full Load Surveillance of Diesel Generators Performed to Remove Carbon Deposits. Investigation Continuing)
- ML20054L521 + (Updated PNO-II-82-072A:on 820628,break Occurred in Outside Radius of Elbow 24-inch Line Which Branches Off 42-inch High Pressure Turbine Exhaust.Apparently Caused by Thinning from Steam Erosion)
- ML20055B586 + (Updated PNO-II-82-077A:on 820707,eddy Current Exam Revealed No Denting in Steam Generator Tubes.Check Valve Pin from Feedwater Regulating Valve Bypass Line Recovered from Secondary Side of Generator)
- ML20055B575 + (Updated PNO-II-82-078A:on 820707,insp of Steam Generator a Revealed That Recently Reinstalled Tube Lane Blocking Device on Secondary Side Was Loose Due to Improper Installation. Steam Generators B & C Devices Found Rigid)
- ML20155K255 + (Updated PNO-II-88-040A:on 880607,leaking Wesf Cs-137 Source at Facility & Radiation Levels Measured Represent 12 Mrem/H. Cause Not Yet Identified.Facility Quarantined & Georgia Tech Physics Professor to Develop Strategy)
- ML20126C709 + (Updated PNO-III-80-045B:licensee Ultrasonic Examination of Core Spray Piping in a & B Loops Located in Drywell Completed.Piping Will Be Replaced W/Low Carbon Steel Pipe)
- ML20040B565 + (Updated PNO-III-82-009A:,ultrasonic Testing Completed on Reactor Water Cleanup Sys & 10 Indications in Drywell Revealed.Piping from Inboard Isolation Valve to Drywell Penetration to Be Replaced)
- ML19332F303 + (Updated PNO-III-89-078A:on 891202,Augmented Insp Team Established to Investigate Spurious Opening of Relief Valve in Train B of RHR Sys & Failure of Valve to Close.Approx 30 to 50 Gallons of Water Released to Auxiliary Bldg)
- ML20211M365 + (Updated PNO-V-87-010A:on 870211,US Testing Co Notified Region V That Film Badges Indicated Two Radiographers Received 3.1 Rem & 2.65 Rem Whole Body Exposures.Extremity Exposures Being Evaluated by State of Az)
- ML20209D513 + (Updated PNO-V-87-030B:on 870421,onsite Phase of AIT Team Special Insp Into 870410 Loss of Suction to RHR Sys While in half-loop Concluded W/Meeting at Site)
- ML20009G341 + (Updated PNS-I-81-016A:intensive Investigation of 810726 Bomb Threat Underway.Polygraph Exams for Some Plant Personnel Considered.Pysical Evidence Being Examined)
- ML20080A876 + (Updated PSAR Figure 16.1-2 Re Quality Stds for ASME Boiler & Pressure Vessel Code & Reg Guide Compliance)
- ML18100A628 + (Updated Page A4-4 of Boric Acid Concentration Reduction Effort Technical Bases & Operational Analysis, Changing Figure Numbers A5-1 & A5-2 to A4-1 & A4-2 at End of First Paragraph)
- ML20032C090 + (Updated Page to NPDES Discharge Monitoring Rept for Aug 1981)
- ML20032C088 + (Updated Page to NPDES Discharge Monitoring Rept for Jul 1981)
- ML20032C082 + (Updated Page to NPDES Discharge Monitoring Rept for June 1981)
- ML20032C078 + (Updated Page to NPDES Discharge Monitoring Rept for May 1981)
- ML19322E889 + (Updated Pages 2-2 & 2-3 of Nuclear Fuel Div QA Program Plan, Revision 5A,reflecting Organizational Changes at Columbia Plant)
- ML19331C946 + (Updated Pages Re Tech Spec Change Request 91 Defining Proposed New Mgt Organization)
- ML19302G428 + (Updated Pages Which Constitute Operating Quality Assurance Manual (Oqam) Revision 34)
- ML19224B474 + (Updated Pages for 790531 Issue of Master Documents:Info Requested by NRC Investigation Team)
- CNL-15-214, Updated Pages for As-Constructed Fire Protection Report + (Updated Pages for As-Constructed Fire Protection Report)
- ML20063G855 + (Updated Pages for Ref 106 of PSAR Section 1.6,CRBRP-3,Vol 2, Hypothetical Core Disruptive Accident Considerations in Crbr:Assessment of Thermal Margin Beyond Design Base)
- ML20042C071 + (Updated Pages for Revision 3,Vol 2 of PSAR for CRBR-3)
- ML20236P867 + (Updated Pages to Catawba Nuclear Station Selected License Commitments Manual)
- NOC-AE-07002183, Updated Pages to Incorporate Battery-Related Technical Specification Changes + (Updated Pages to Incorporate Battery-Related Technical Specification Changes)
- ML072050334 + (Updated Pages to Incorporate Battery-Related Technical Specification Changes)
- PNP 2013-046, Updated Palisades Nuclear Plant Reactor Vessel Fluence Evaluation + (Updated Palisades Nuclear Plant Reactor Vessel Fluence Evaluation)
- ML110060692 + (Updated Palisades Reactor Vessel Pressurized Thermal Shock Evaluation)
- ML20216C418 + (Updated Paper Entitled, Spreadsheet Model for Evaluation of Substatistical Confidence in Nuclear ISI Plans. Rev of 970624 Paper)
- ML20209C566 + (Updated Part 21 Interim Rept to Rept 98-029 Re Locbart Computer Code Error.Caused by Logic Error in Locbart.Locbart Calculations,With Corrected Code Version,Have Been Performed for Number of Typical Large Break LOCA Transients)
- ML20041E290 + (Updated Part 21 Rept 81-05 Re Min Separation Requirements for Certain Components of 4160-volt Switchgear,Initially Reported on 811002.Detailed Analysis Ongoing.Extension of 90 Days Needed to Complete Investigation)
- ML20099F388 + (Updated Part 21 Rept Re Missile Door Calculation Errors. Initially Reported on 840705.Calculations & Designs Reconciled W/Respective Customers.Doors Qualified as Meeting Original Project Design Requirements)
- ML19339C187 + (Updated Part 21 Rept Re Performance of Addl Interference Checking of All Sizes of Vendor Part 2541/modified 2540. Sizes -6,-15 & -120 Assemblies Contain Potential Interference Which May Hinder Function of Unit)
- ML20083A747 + (Updated Part 21 Rept on Status of RCIC Sys Equipment Room Cooler & Automatic Restart of Chillers,Per 830429 & 0630 Ltrs.Safe Shutdown Sys Review Completed on Perry Nuclear Project.Results Provided)
- ML12198A060 + (Updated Performance Assessment for the Low-Level Waste Facility, Radioactive Material License No. R04100)
- ML101890676 + (Updated Permit Info Re Kewaunee LRA FSEIS)
- PLA-6835, Updated Personnel Information + (Updated Personnel Information)
- PLA-6705, Updated Personnel Information + (Updated Personnel Information)
- ML123550039 + (Updated Plans and Schedule for ONS Standby Shutdown Facility Design Review Project)
- NRC-13-0018, Updated Plans for Restoration of the South Reactor Feedpump + (Updated Plans for Restoration of the South Reactor Feedpump)
- ML18130A949 + (Updated Policy Issue Table for Non-Light Water Reactors - May 2018)
- ML16295A148 + (Updated Policy Statement on Training and Qualification of Nuclear Power Plant Personnel--ACRS Comments)
- ML20136A339 + (Updated Post-Shutdown Decommissioning Activities Report and Irradiated Fuel Management Plan)
- ML24157A367 + (Updated Post-Shutdown Decommissioning Activities Report Request for Additional Information Transmittal Letter)
- ML24256A042 + (Updated Post-Shutdown Decommissioning Activities Report, Rev. 6)
- ML20087P652 + (Updated Potential Significant Deficiency Rept SD-47 Re Possibly Underdesigned Seismic Duct Welds.Initially Reported on 831109.Calculations on Required Weld Strength Being Reviewed.Next Rept by 840608)