Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000388/LER-2016-004 + (Unit 2 experienced an electrical transient resulting in a manual SCRAM)
- ML19224B194 + (Unit 2 no-name Outage List,Revision 6)
- ML19224B339 + (Unit 2 out-of-svc Log)
- ML24114A015 + (Unit 2 – Issuance of Amendment No. 279 Regarding Application of Leak-Before-Break Methodology for Auxiliary Reactor Coolant System Piping)
- BYRON 2005-0024, Unit 2, 2004 Annual Environmental Operating Report + (Unit 2, 2004 Annual Environmental Operating Report)
- ML14154A087 + (Unit 2, Acceptance Review Concerning Alternative to Inservice Inspection for Reactor Vessel Flange Leak-Off Lines)
- L-PI-13-075, Unit 2, Amended Inservice Inspection (Isl) Summary Report, for Unit 1 Cycle 27 and Unit 2 Cycle 26 + (Unit 2, Amended Inservice Inspection (Isl) Summary Report, for Unit 1 Cycle 27 and Unit 2 Cycle 26)
- 2CAN020303, Unit 2, Annual Primary Coolant Specific Activity Report for 2002 + (Unit 2, Annual Primary Coolant Specific Activity Report for 2002)
- 0CAN020901, Unit 2, Annual Radioactive Effluent Release Report, January 1 Through December 31, 2008 + (Unit 2, Annual Radioactive Effluent Release Report, January 1 Through December 31, 2008)
- WBL-24-021, Unit 2, Annual Radioactive Effluent Release Report + (Unit 2, Annual Radioactive Effluent Release Report)
- 2CAN021502, Unit 2, Anti-Vibration Bar Positioning and Sludge Evaluation Information Concerning the Spring 2014 Steam Generator Inspections + (Unit 2, Anti-Vibration Bar Positioning and Sludge Evaluation Information Concerning the Spring 2014 Steam Generator Inspections)
- AEP-NRC-2020-09, Unit 2, Application to Revise Technical Specifications to Adopt TSTF-412, Revision 3 Provide Actions for One Steam, Supply to Turbine Driven Afw/Efw Pump Inoperable + (Unit 2, Application to Revise Technical Specifications to Adopt TSTF-412, Revision 3 Provide Actions for One Steam, Supply to Turbine Driven Afw/Efw Pump Inoperable)
- AEP-NRC-2020-10, Unit 2, Application to Revise Technical Specification to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position + (Unit 2, Application to Revise Technical Specification to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position)
- 05000412/LER-2021-002, Unit 2, Automatic Reactor Trip and Automatic Actuation of the Auxiliary Feedwater System + (Unit 2, Automatic Reactor Trip and Automatic Actuation of the Auxiliary Feedwater System)
- AEP-NRC-2020-17, Unit 2, Changes Made to the Cyber Security Plan, Revision 2 + (Unit 2, Changes Made to the Cyber Security Plan, Revision 2)
- ML041180055 + (Unit 2, Combined 2003 Annual Radioactive Effluent Release Report)
- 2CAN020204, Unit 2, Comments Re the Draft NRC Safety Evaluation for the Proposed ANO-2 Power Uprate + (Unit 2, Comments Re the Draft NRC Safety Evaluation for the Proposed ANO-2 Power Uprate)
- NL-09-0252, Unit 2, Comments on NRC Draft Safety Evaluation and Request for Additional Information for Core Shroud Relief Request + (Unit 2, Comments on NRC Draft Safety Evaluation and Request for Additional Information for Core Shroud Relief Request)
- 2CAN050202, Unit 2, Completion of Control Room Habitability Actions for ANO-2 + (Unit 2, Completion of Control Room Habitability Actions for ANO-2)
- NL-04-0698, Unit 2, Cycle 17 Core Operating Limits Report + (Unit 2, Cycle 17 Core Operating Limits Report)
- NL-05-1948, Unit 2, Cycle 18 Core Operating Limits Report + (Unit 2, Cycle 18 Core Operating Limits Report)
- NL-07-0817, Unit 2, Cycle 19 Core Operating Limits Reports + (Unit 2, Cycle 19 Core Operating Limits Reports)
- WBL-20-006, Unit 2, Emergency Plan Implementing Procedure Revision + (Unit 2, Emergency Plan Implementing Procedure Revision)
- NL-07-0892, Unit 2, Extension Request for Completion of Corrective Actions Associated with Generic Letter 2004-02 + (Unit 2, Extension Request for Completion of Corrective Actions Associated with Generic Letter 2004-02)
- ML071840602 + (Unit 2, Extension Request for Completion of Corrective Actions Associated with Generic Letter 2004-02)
- 05000280/LER-2022-001, Unit 2, Failure of Two Intake Canal Level Probes Due to Biofouling + (Unit 2, Failure of Two Intake Canal Level Probes Due to Biofouling)
- 2CAN111202, Unit 2, Flooding Walkdown Report - Response to NRC Request for Information Pursuant to 10CFR50.54(f) Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident + (Unit 2, Flooding Walkdown Report - Response to NRC Request for Information Pursuant to 10CFR50.54(f) Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident)
- NL-11-1131, Unit 2, GNF-Ziron Lead Test Assemblies + (Unit 2, GNF-Ziron Lead Test Assemblies)
- AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask + (Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask)
- AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask + (Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask)
- AEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask + (Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask)
- ML16278A518 + (Unit 2, License Amendment Application; Opportunity to Comment, Request a Hearing, and Petition for Leave to Intervene)
- ML041200298 + (Unit 2, License Amendment Request - Conversion of Current Technical Specifications (CTS) to Improved Technical Specifications (ITS))
- ML051110010 + (Unit 2, License Amendment, Eliminate Requirements to Provide Monthly Operating Reports and Annual Occupational Radiation Exposure Reports)
- 2CAN090402, Unit 2, License Renewal Application Clarifications + (Unit 2, License Renewal Application Clarifications)
- 2CAN070409, Unit 2, License Renewal Application Clarifications + (Unit 2, License Renewal Application Clarifications)
- 2CAN080401, Unit 2, License Renewal Application Clarifications + (Unit 2, License Renewal Application Clarifications)
- 05000366/LER-2005-003, Unit 2, Manual Reactor Scram Inserted in Response to Reactor Water Chemistry Event Caused by a Condenser Tube Leak + (Unit 2, Manual Reactor Scram Inserted in Response to Reactor Water Chemistry Event Caused by a Condenser Tube Leak)
- ML20112K059 + (Unit 2, Metallurgical Defects in Steam Generator Tubes)
- ML091620423 + (Unit 2, N1-13-NDE-024 and N2-13-NDE-025: Acceptance of Requested Licensing Action Relief Request-Reactor Coolant Pressure Boundary Visual Inspection)
- 2CAN110501, Unit 2, NRC Bulletin 2003-01 - Additional Review + (Unit 2, NRC Bulletin 2003-01 - Additional Review)
- NL-07-1628, Unit 2, NRC Request Regarding the Spring 2007 Refueling Outage Reactor Pressure Head Inspection Report + (Unit 2, NRC Request Regarding the Spring 2007 Refueling Outage Reactor Pressure Head Inspection Report)
- ML14364A403 + (Unit 2, Notification of a Triennial Fire Protection Baseline Inspection, U.S. Nuclear Regulatory Commission Inspection Report Nos. 0000280/2015008 and 05000281/2015008)
- NL-07-1001, Unit 2, Pressurizer Surge Nozzle Full Structural Weld Overlay Nondestructive Examination Results - Spring 2007 Outage (2R18) + (Unit 2, Pressurizer Surge Nozzle Full Structural Weld Overlay Nondestructive Examination Results - Spring 2007 Outage (2R18))
- 2CAN020207, Unit 2, Primary Coolant Activity Report for 2001 + (Unit 2, Primary Coolant Activity Report for 2001)
- ML051300172 + (Unit 2, Radioactive Effluent Release Report, January - December 2004)
- LR-N07-0150, Unit 2, Re-Submittal of Inservice Inspection Program Relief Requests S2-I2-RR-B01 and S2-I2-RR-C01 + (Unit 2, Re-Submittal of Inservice Inspection Program Relief Requests S2-I2-RR-B01 and S2-I2-RR-C01)
- NL-09-0415, Unit 2, Re-review of Subject Information Provided with Respect to 10 CFR 2.390 as Requested in NRC Draft SER Letter of February 12, 2009 + (Unit 2, Re-review of Subject Information Provided with Respect to 10 CFR 2.390 as Requested in NRC Draft SER Letter of February 12, 2009)
- 05000368/LER-2014-002, Unit 2, Regarding Automatic Reactor and Main Generator Trip with a Subsequent Emergency Feedwater Actuation and Start of an Emergency Diesel Generator + (Unit 2, Regarding Automatic Reactor and Main Generator Trip with a Subsequent Emergency Feedwater Actuation and Start of an Emergency Diesel Generator)
- 05000368/LER-2014-003, Unit 2, Regarding Axial Shape Index Trip at the End-of-Life During Rapid Plant Shutdown + (Unit 2, Regarding Axial Shape Index Trip at the End-of-Life During Rapid Plant Shutdown)
- 05000311/LER-2015-001, Unit 2, Regarding Condition Prohibited by Technical Specification for One Channel of Overtemperature Delta-T Inoperable + (Unit 2, Regarding Condition Prohibited by Technical Specification for One Channel of Overtemperature Delta-T Inoperable)