Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Scram Due to Main Power Transformer B Phase Disconnect Switch Failure". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML101740217  + (Scoping and Screening Audit Report for the Palo Verde Nuclear Generating Station, Units 1, 2, and 3, License Renewal Application (TACs ME0254, ME0255, and ME0256))
  • ML110270026  + (Scoping and Screening Audit Summary Regarding the Seabrook Station License Renewal Application (TAC Number ME4028))
  • ML102100544  + (Scoping and Screening Audit Summary Regarding Hope Creek Generating Station License Renewal Application)
  • ML102280211  + (Scoping and Screening Audit Summary Regarding the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application)
  • ML083300107  + (Scoping and Screening Audit Summary Regarding the Prairie Island Nuclear Generating Plant, Units 1 and 2, License Renewal Application)
  • ML083540648  + (Scoping and Screening Methodolgy Audit Trip Report for Indian Point, Units 2 and 3)
  • ML12178A475  + (Scoping and Screening Methodology Audit Report Regarding the Callaway Plant, Unit 1, License Renewal Application)
  • ML12165A387  + (Scoping and Screening Methodology Audit Report Regarding the Grand Gulf Nuclear Station, Unit 1, License Renewal Application)
  • ML11342A205  + (Scoping and Screening Methodology Audit Report Regarding the Limerick Generating Station, Units 1 and 2)
  • ML15104A782  + (Scoping and Screening Methodology Audit Report Regarding LaSalle County Station, Units 1 and 2)
  • ML13119A135  + (Scoping and Screening Methodology Audit Report Regarding the Sequoyah Nuclear Plant, Units 1 and 2)
  • ML16299A282  + (Scoping and Screening Methodology Audit Report Regarding Waterford Steam Electric Station, Unit 3 License Renewal Application Review)
  • ML14050A304  + (Scoping and Screening Methodology Audit Report Regarding the Byron Station, and Braidwood Station, Units 1 and 2, LRA)
  • ML101530226  + (Scoping and Screening RAIs)
  • ML18127A877  + (Scoping- Fact Sheet - English)
  • ML24163A147  + (Scott Hicks, FWS-Palisades-NOI to Conduct Scoping Process and Prepare an EA-EPID No. L-2024-LNE-0003-Docket No.50-0255)
  • ML19247C094  + (Scott Morris Response to Donna Gilmore Ref. Used Fuel Retrievability - NRC Guidance Document)
  • ML111930291  + (Scott Murray Letter Re; NRC Visit to GEH -- Vallecitos Nuclear Center -- July 13, 2011)
  • ML041330422  + (Scppa 2002-2003 - Annual Report)
  • 05000260/LER-1981-035-01, Scram Discharge Instrument Vol Tank Level Switch 2-LS-85-45F Failed to Operate Per IE Bulletin 80-14 During Maint Outage.Caused by Inoperable Level Switch SL-305-EI-X.Switch Replaced  + (Scram Discharge Instrument Vol Tank Level Switch 2-LS-85-45F Failed to Operate Per IE Bulletin 80-14 During Maint Outage.Caused by Inoperable Level Switch SL-305-EI-X.Switch Replaced)
  • ML19276J668  + (Scram Discharge Vents & Drains)
  • ML20266C875  + (Scram Discharge Volume Drain Modifications Sections.Actual Drawing Number 13095.19-EP-1B-2)
  • 05000352/LER-2002-003, Scram Due to Actuation of Main Thrust Bearing Wear Detector  + (Scram Due to Actuation of Main Thrust Bearing Wear Detector)
  • 05000237/LER-2001-005, Scram Due to Increased First Stage Turbine Pressure  + (Scram Due to Increased First Stage Turbine Pressure)
  • ENS 40752  + (Scram Due to Lowering Steam Generator Level)