Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20237J976 + (Revised Regional Ofc Policy Guides,Including Rev 0 to 1051, Procedures for Allegation & Investigations & Rev 0 to 2235, Matls & Fuel Cycle Insp Repts & Associated Correspondence)
- ML20236X967 + (Revised Regional Procedure 0514A, Plant-Specific Backfit)
- 0CAN091603, Revised Registration of Cask Use + (Revised Registration of Cask Use)
- ML16246A212 + (Revised Regulatory Analysis Guidelines)
- ML18332A053 + (Revised Regulatory Basis - Part 73 Enhanced Security for SNM)
- ND-20-0149, Revised Regulatory Commitment for Mitigative Strategies Description and Plans + (Revised Regulatory Commitment for Mitigative Strategies Description and Plans)
- ML14091A111 + (Revised Regulatory Issue Summary (RIS) 2013-06, Preparation and Scheduling of Operator Licensing Examinations)
- LIC-05-0057, Revised Relaxation Request for First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors + (Revised Relaxation Request for First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors)
- ML20205G521 + (Revised Reliability Procedure Co 30-1, Organizational Structure & Internal Insp Sys of Radiography Program)
- ML20205G531 + (Revised Reliability Procedure Co 30-6, Survey of Incoming & Outgoing Radioactive Sources)
- ML11230A919 + (Revised Relief Request (PRR)-21, Contingency Repair Plan for Reactor Pressure Vessel (RPV) Standby Liquid Control Nozzle Weld, RPV-N14-1)
- ML090490761 + (Revised Relief Request CS-001 for Snubber Examination and Testing for the Fourth Interval Al ISI Program)
- RNP-RA/02-0170, Revised Relief Request No. 18 Regarding Examination of the Reactor Pressure Vessel Head Penetration Canopy Seal Weld Repairs for the Fourth Ten-Year Inservice Inspection Interval + (Revised Relief Request No. 18 Regarding Examination of the Reactor Pressure Vessel Head Penetration Canopy Seal Weld Repairs for the Fourth Ten-Year Inservice Inspection Interval)
- ML13129A298 + (Revised Relief Request No. ANO2-ISI-007, Alternative to Use ASME Code Case N-770-1 Baseline Examination, Fourth 10-Year Inservice Inspection Interval)
- ML16230A508 + (Revised Relief Request No. PRR-007 for the Inservice Testing Program Third10-year Interval (CAC No. Mf7573))
- ML043420337 + (Revised Relief Request Nos. 1A & 10A Regarding the Closeout of the Second 10-Year Inservice Inspection Interval)
- ML020990092 + (Revised Relief Request Nos. 3-12, 3-14, 3-16 & 3-17, Third 10-Year Inservice Inspection Interval Program Plan)
- LIC-03-0083, Revised Relief Request Pertaining to Visual Inspection of Inaccessible Piping and Components + (Revised Relief Request Pertaining to Visual Inspection of Inaccessible Piping and Components)
- ML21253A010 + (Revised Relief Request RR-A39 for the Fourth 10-Year Inservice Inspection Interval)
- 1CAN030804, Revised Relief Request for 10 Year Update to the 120 Month Inservice Testing Interval, Arkansas Nuclear One, Unit 1 + (Revised Relief Request for 10 Year Update to the 120 Month Inservice Testing Interval, Arkansas Nuclear One, Unit 1)
- RS-15-234, Revised Relief Request for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations + (Revised Relief Request for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations)
- LIC-04-0065, Revised Relief Request for Examinations with Less than 100% ASME Code Coverage for the Third 10-Year Interval + (Revised Relief Request for Examinations with Less than 100% ASME Code Coverage for the Third 10-Year Interval)
- NL-04-062, Revised Relief Requests (RR-62 Rev 1 and RR 3-32 Rev 1) Regarding Alternative Repair Methods + (Revised Relief Requests (RR-62 Rev 1 and RR 3-32 Rev 1) Regarding Alternative Repair Methods)
- ML052070639 + (Revised Relief Requests 28, 30, and 31 for 3rd 10-year Pump and Valve Inservice Testing)
- ML032890435 + (Revised Relief Requests ASME Code Update for the Third Ten-Year Interval, Inservice Testing Program, San Onofre Nuclear Generating Station Units 2 and 3)
- CPSES-200300632, Revised Relief Requests B-7, B-8, B-9 Rev. 1 & C-6, Rev. 1 + (Revised Relief Requests B-7, B-8, B-9 Rev. 1 & C-6, Rev. 1)
- ML17305A691 + (Revised Reload Analysis Rept,Unit 2,Cycle 3 Consisting of Changes to Sections 1,2 & 3,Pages 1-1,2-1,3-1,3-2,3-4,3-5 & 5-1)
- ML20235A752 + (Revised Remedial Action Insp Plan (Raip) Umtrap - Clive)
- ML20126L900 + (Revised Remedial Action Insp Plan,Including Rev 1 to RAIP-2, Testing & Insp, Rev 1 to RAIP-4, QA Records Control, Rev 1 to RAIP-5, Control of Measuring & Test Equipment & Rev 1 to RAIP-6, Nonconformance & Corrective Action)
- ML072190495 + (Revised Renewed Facility Operating License Pages to Reflect Issue B.5.b)
- ML18222A468 + (Revised Replacement Energy Costs for Nuclear Power Plants - Final Report)
- ML19312E923 + (Revised Replacement Pages 3-17,3-18,3-27,A-28,3-19 & 3-20 for Demonstration & Conditions for License SNM-778, 781231 Renewal Application)
- ML19312E921 + (Revised Replacement Pages 3-32,3-32a,A-19 & A-20 for Demonstration & Conditions for License SNM-778, 700531)
- ML18095A939 + (Revised Replacement Pages to Facility Inservice Testing Program)
- ML100341223 + (Revised Reply to NOV EA-09-183, Dated January 27, 2010)
- ML060100301 + (Revised Reply to NRC Bulletin 2005-02 Emergency Preparedness and Response Actions for Security-Based Events and Revision of Reply to ICM B.5.d to EA 02-026)
- ML062340437 + (Revised Reply to Notice of Violation)
- ML20056D431 + (Revised Reply to Notice of Violation.Corrective Actions: Completed Form NRC-241 & Paid Fees on 930603.Copy of Completed NRC-241 Encl.W/O Encl)
- U-603827, Revised Reply to Notice of Violation: EA-06-291 + (Revised Reply to Notice of Violation: EA-06-291)
- L-13-098, Revised Reply to Request for Additional Information for the Review of License Renewal Application + (Revised Reply to Request for Additional Information for the Review of License Renewal Application)
- ML13080A077 + (Revised Reply to a Notice of Violation, EA-11-018)
- ONS-2015-015, Revised Reply to a Notice of Violation; EA-14-091 + (Revised Reply to a Notice of Violation; EA-14-091)
- ML20035G126 + (Revised Reponse to Violations Noted in Insp Repts 50-282/92-25 & 50-306/92-25.C/As:guidelines Will Be Developed for Use of Related Experience That Will Be Included in Administrative Controls or Certificate Manual)
- IR 05000445/2021001 + (Revised Report - Comanche Peak Nuclear Plant, Units 1 and 2 - Integrated Inspection Report 05000445/2021001; 05000446/2021001 and Independent Spent Fuel Storage Inspection 07200074/2021001)
- IR 05000445/2020001 + (Revised Report - Comanche Peak Nuclear Power Plant, Units 1 and 2 -Integrated Inspection Report 05000445/2020001 and 05000446/2020001)
- ML043570390 + (Revised Report Regarding an Event Occurred at the Perry Nuclear Power Plant on May 21, 2004, Goulds Pumps Inc)
- ML19142A369 + (Revised Report for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review)
- LR-N07-0192, Revised Report of Changes Tests and Experiments + (Revised Report of Changes Tests and Experiments)
- RS-14-347, Revised Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (Revised Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051))
- NL-11-016, Revised Report on Inoperable Main Steam Line Radiation Monitor + (Revised Report on Inoperable Main Steam Line Radiation Monitor)
- ZS-2019-0056, Revised Report on Status of Decommissioning Funding for Shutdown Reactors + (Revised Report on Status of Decommissioning Funding for Shutdown Reactors)