Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Provides Addl Info Re Proposed Special Test Exception 3.10.8". Since there have been only a few results, also nearby values are displayed.

Showing below up to 27 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20044C331  + (Provides Addl Info Re Proposed TS Change Requests 205 & 71 Submitted on 921230,including Document WCAP-12522, Inconel Alloy 600 Tubing-Matl Burst & Strength Properties)
  • ML20084G401  + (Provides Addl Info Re Protection of Control Room Personnel from Onsite Gaseous Hazards of Ammonium Hydroxide,Chlorine & Radiation,Per 831228 Request & NUREG-0737,Item III.D.3.4)
  • ML20153F562  + (Provides Addl Info Re Pump & Valve Inservice Testing Program Relief Request 11,per Pw Oconnor 880815 Request.Pump Curve for Fuel Pool Cooling Pump 01A & Ref Differential Pressure (D/P) Vs Actual D/P Data Used to Trend Pump Test Data Encl)
  • ML20003H323  + (Provides Addl Info Re QA Program for Design & Const Per NRC Request.Clarifies Util Response Re Responsibilities of Daniel Site Const Personnel in Performance of Listed Functions at Facilities)
  • AECM-83-0672, Provides Addl Info Re Qualification of Automatic Depressurization Sys (ADS) Accumulator & Related Air Sys,In Response to .Ads Leak Test Frequency of 18 Months Anticipated  + (Provides Addl Info Re Qualification of Automatic Depressurization Sys (ADS) Accumulator & Related Air Sys,In Response to .Ads Leak Test Frequency of 18 Months Anticipated)
  • ML20197C877  + (Provides Addl Info Re Qualifications of Nuclear Safety Review Committee Chairman,Per Request.Min Qualifications for Member Delineated in .Chairman Must Be high-level, Technically Oriented Manager Not in Mgt Chain)
  • ML19318A688  + (Provides Addl Info Re Questions on NRC-proposed Purging of Containment Bldg Atmosphere.Recommendations Were Given in SECY-80-132C.Supplemental Slow Purge Info Encl)
  • ML20246E406  + (Provides Addl Info Re Questions on Staff Proposed Purging of TMI-2 Containment Bldg Atmosphere)
  • ML20031D267  + (Provides Addl Info Re RHR Loop a (Shutdown Cooling),In Support of 810930 Proposed Change to Tech Specs on Standby Gas Treatment Sys & Control Room High Efficiency Air Filtration Sys)
  • ML20134N962  + (Provides Addl Info Re Radiological Consequences for SG Tube Rupture,Rupture of Steam Pipe,Locked Rotor,Rod Ejection Accidents & TS Change Requests 188 & 189)
  • ML20058E681  + (Provides Addl Info Re Reactor Bldg Purge Sys in Order to Resolve Generic Item B-24 & NUREG-0737,Item II.E.4.2.5, Containment Isolation Dependability)
  • ML20058C215  + (Provides Addl Info Re Reactor Committee Meeting at Univ Not Held in Time Interval Required by Tech Spec 6.2.f)
  • ML13310B280  + (Provides Addl Info Re Reactor Coolant Gas Vent Sys,Per NUREG-0737,Item II.B.1.Sys Used to Purge Nitrogen Accumulated in Reactor Vessel Head on 831118.RCS Will Be Vented Periodically to Reduce Nitrogen Pressure)
  • ML20058D236  + (Provides Addl Info Re Reactor Coolant Pump Locked Rotor & Shaft Break Transients Closing Per SER Confirmatory Issue 34.Turbine Trip Will Not Cause Instability on Grid or Further Complicate Transient)
  • ML20011D748  + (Provides Addl Info Re Reactor Coolant Pump Seal Integrity Requested by NRC During 890815 Telcon)
  • ML19312C149  + (Provides Addl Info Re Reactor Vessel Overpressurization Following Large Steam Line Break Incident,In Response to NRC to B&W Which Was Referred to Util)
  • ML20249C462  + (Provides Addl Info Re Reator Pressure Vessel Integrity at Plant,Unit 1 in Response to 980331 Info Request.Vadlidation of Previously Submitted Responses to GL 92-01, Rv Structural Integrity, Encl)
  • 0CAN058906, Provides Addl Info Re Release Through Sewage Treatment Plant During Third & Fourth Quarters 1989.Listed Tabulation Summarizes Activity in Truckload of Liquid Sewage Transported on 881007 to Russellville Sewage Plant  + (Provides Addl Info Re Release Through Sewage Treatment Plant During Third & Fourth Quarters 1989.Listed Tabulation Summarizes Activity in Truckload of Liquid Sewage Transported on 881007 to Russellville Sewage Plant)
  • ML20039C270  + (Provides Addl Info Re Reliability of Auxiliary Feedwater Sys.Second Recalculation Conforms to SRP 10.4.9 by Taking Credit for Second Auxiliary Power Supply to Feedwater Pump)
  • ML20134E484  + (Provides Addl Info Re Reliability of Emergency Feedwater Sys as Presently Configured & Status of Mods to Sys,Per 850730 commitment.Long-term Upgrade Mods Will Be Completed During First Refueling Outage Following Restart)
  • BSEP-97-0396, Provides Addl Info Re Relief Request from Performing RPV Exam Requirements of ASME B&PV Code,Section XI,1980 Edition, W/Winter 1981 Addenda & Augmented Exam Requirements of 10CFR50.55a(g)(6)(ii)(A)(2)  + (Provides Addl Info Re Relief Request from Performing RPV Exam Requirements of ASME B&PV Code,Section XI,1980 Edition, W/Winter 1981 Addenda & Augmented Exam Requirements of 10CFR50.55a(g)(6)(ii)(A)(2))
  • B15924, Provides Addl Info Re Relief Request from ASME Code Section 11 Requirements  + (Provides Addl Info Re Relief Request from ASME Code Section 11 Requirements)
  • ML20058E824  + (Provides Addl Info Re Relief from Liquid Penetrant Exam of Outer Diameter Weld Surface of Core Flood safe-end Welds)
  • ML20084S773  + (Provides Addl Info Re Removal of Recirculation Pump Discharge Valve Bypass Piping Due to Crack Indications in B Loop Bypass Line Upper weld-o-let.Mod & Repair Program Acceptable)