Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- EPID:L-2018-LLR-0054 + (Proposed Alternative RR-V-12 Regarding Main Steam Safety Relief Valve Testing)
- ML12122A217 + (Proposed Alternative Regarding Motor Operated Valve Testing)
- ML24165A123 + (Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058))
- ML24164A001 + (Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060))
- ML081690888 + (Proposed Alternative Relief Request for Pressurizer Safety Valves-Q1/2B13-RR-V-2)
- ML073340847 + (Proposed Alternative Relief Request to Performance of System Pressure Test on Instrument Air Piping, Second Ten-Year Inservice Inspection Interval)
- ML021580283 + (Proposed Alternative Repair Method for Reactor Vessel Head Penetrations - Relief Request No. 18)
- L-03-056, Proposed Alternative Repair Methods for Reactor Vessel Head Penetrations (Relief Request No. BV3-RV-04) + (Proposed Alternative Repair Methods for Reactor Vessel Head Penetrations (Relief Request No. BV3-RV-04))
- ML030780307 + (Proposed Alternative Repair Methods for Reactor Vessel Head Penetrations)
- ML020870410 + (Proposed Alternative Repair Methods for Reactor Vessel Head Penetrations- Relief Requests No. 20 and No. 21)
- ML060970356 + (Proposed Alternative Repair of Control Rod Drive Housing Interface with Reactor Vessel - Draft Code Case N-730, Roll-Expansion of Class 1 Control Rod Drive Bottom Head Penetrations in Bwrs, Section XI, Division 1)
- ML21242A049 + (Proposed Alternative Request 10 CFR 50.55a(z)(1), Test)
- ML20055F571 + (Proposed Alternative Request 19-ON-001 to Use Modified American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-853)
- ML17004A063 + (Proposed Alternative Request GVRR-8 Inservice Testing Program Third 10-Year Interval)
- ML19064A590 + (Proposed Alternative Request IR-3-39, Alternative to ASME Code, Section XI, IWA-4221(C), to Permit Two Fillet Welds Not in Compliance with the Construction Code to Remain in Service)
- EPID:L-2019-LLR-0014 + (Proposed Alternative Request IR-3-39, Alternative to ASME Code, Section XI, IWA-4221(C), to Permit Two Fillet Welds Not in Compliance with the Construction Code to Remain in Service)
- ML19106A050 + (Proposed Alternative Request IR-4-01 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography)
- ML19340A001 + (Proposed Alternative Request IR-4-01 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography)
- EPID:L-2019-LLR-0033 + (Proposed Alternative Request IR-4-01 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography)
- ML21209A996 + (Proposed Alternative Request IST-RR-8 Related to the Inservice Testing Program)
- ML091770549 + (Proposed Alternative Request No. 09-MN-005 Alternative Leakage Testing for Various ASME Code Class 1 Piping and Components)
- ML20282A732 + (Proposed Alternative Request No. 4ISI-08 Applicable to the Fourth Inservice Inspection Interval)
- ML12125A297 + (Proposed Alternative Request Number 11-CN-001 for the Third Ten-Year Inservice Inspection Interval Response to NRC Request for Additional Information)
- ML12104A267 + (Proposed Alternative Request Number 11-CN-002 for the Third Ten-Year Inservice Inspection Interval Response to NRC Request for Additional Information)
- ML11264A028 + (Proposed Alternative Request Number 11-CN-002 for the Third Ten-Year Inservice Inspection Interval)
- EPID:L-2018-LLR-0078 + (Proposed Alternative Request P-06 for 'C' Charging Pump Test)
- ML18156A131 + (Proposed Alternative Request P-06 for C Charging Pump Test)
- ML21253A082 + (Proposed Alternative Request RA-21-0145 to Use Reactor Vessel Head Penetration Embedded Flaw Repair Method)
- ML22096A316 + (Proposed Alternative Request RP-1 Regarding Digital Instrumentation for Inservice Testing)
- ML22136A109 + (Proposed Alternative Request RP-2 Regarding the Inservice Testing of Certain Pumps)
- ML22118B038 + (Proposed Alternative Request RP-4 Regarding the Inservice Testing of High-Pressure Injection Pumps)
- ML13220A019 + (Proposed Alternative Request RR-04-16 for the Use of Encoded Phased Array Ultrasonic Examination Techniques (Paut) in Lieu of Radiography)
- ML16106A105 + (Proposed Alternative Request RR-04-23 and IR-3-28 for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography)
- ML19352B898 + (Proposed Alternative Request RR-05-05, Containment Unbonded Post-Tensioning System Inservice Inspection Requirements)
- EPID:L-2019-LLR-0120 + (Proposed Alternative Request RR-05-05, Containment Unbonded Post-Tensioning System Inservice Inspection Requirements)
- ML24155A204 + (Proposed Alternative Request RR-24-123, Containment Unbonded Post-Tensioning System Inservice Inspection Requirements)
- EPID:L-2024-LLR-0035 + (Proposed Alternative Request RR-24-123, Containment Unbonded Post-Tensioning System Inservice Inspection Requirements)
- ML102390467 + (Proposed Alternative Request RR-l3R-14, Nozzle-to-Vessel Weld and Inner Radii Examinations)
- ML23205A136 + (Proposed Alternative Request RV-02D Associated with the Sixth IST Interval)
- ML23269A066 + (Proposed Alternative Request RV-23H Associated with the Sixth 10-Year Inservice Testing Interval)
- ML25248A259 + (Proposed Alternative Request V-2 Inservice Testing of Accumulator Discharge Check Valves)
- ML18337A394 + (Proposed Alternative Request for Elimination of the Reactor Pressure Vessel Threads in Flange Examination)
- AEP-NRC-2018-33, Proposed Alternative Request for Elimination of the Reactor Pressure Vessel Threads in Flange Examination + (Proposed Alternative Request for Elimination of the Reactor Pressure Vessel Threads in Flange Examination)
- EPID:L-2018-LLR-0084 + (Proposed Alternative Request for Elimination of the Reactor Pressure Vessel Threads in Flange Examination)
- GNRO-2017/00034, Proposed Alternative Request for Forth Interval Inservice Inspection Program + (Proposed Alternative Request for Forth Interval Inservice Inspection Program)
- AEP-NRC-2019-24, Proposed Alternative Request for Reactor Vessel Inspections to Meet Code Requirements for Two ISI Intervals + (Proposed Alternative Request for Reactor Vessel Inspections to Meet Code Requirements for Two ISI Intervals)
- EPID:L-2019-LLR-0054 + (Proposed Alternative Request for Reactor Vessel Inspections to Meet Code Requirements for Two ISI Intervals)
- L-24-233, Proposed Alternative Request to Defer ASME Code Section XI Inservice Inspection Examinations for Pressurizer and Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles + (Proposed Alternative Request to Defer ASME Code Section XI Inservice Inspection Examinations for Pressurizer and Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles)
- ML16287A724 + (Proposed Alternative Requests RR-04-24 an IR-3-30 for Elimination of the Reactor Pressure Vessel Threads in Flange Examination)
- ML18066A522 + (Proposed Alternative Requests RR-04-27 and IR-3-38 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography in Accordance with 10 CFR 50.55(z)(1))
- ML19106A049 + (Proposed Alternative Requests RR-05-01 and RR-05-02 for the Fifth 10-Year Inservice Inspection Interval)