Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18201A146 + (Monthly Teleconference Meeting with NuScale to Discuss RAIs Related to DCA Section 3.9.2 Dynamic Testing and Analysis of Systems, Components, and Equipment)
- ML18176A310 + (Monthly Teleconference Meeting with NuScale to Discuss RAIs Related to DCA Section 3.9.2 Dynamic Testing and Analysis of Systems, Components, and Equipment)
- ML18149A526 + (Monthly Teleconference Meeting with NuScale to Discuss RAIs Related to DCA Section 3.9.2 Dynamic Testing and Analysis of Systems, Components, and Equipment)
- ML19056A011 + (Monthly Teleconference Meeting with NuScale to Discuss RAIs Related to DCA Section 3.9.2 Dynamic Testing and Analysis of Systems, Components, and Equipment)
- ML19080A201 + (Monthly Teleconference Meeting with NuScale to Discuss RAIs Related to DCA Section 3.9.2 Dynamic Testing and Analysis of Systems, Components, and Equipment)
- ML19106A065 + (Monthly Teleconference Meeting with NuScale to Discuss RAIs Related to DCA Section 3.9.2 Dynamic Testing and Analysis of Systems, Components, and Equipment)
- ML19171A032 + (Monthly Teleconference Meeting with NuScale to Discuss RAIs Related to DCA Section 3.9.2 Dynamic Testing and Analysis of Systems, Components, and Equipment)
- ML19203A270 + (Monthly Teleconference Meeting with NuScale to Discuss RAIs Related to DCA Section 3.9.2 Dynamic Testing and Analysis of Systems, Components, and Equipment)
- ML19233A290 + (Monthly Teleconference Meeting with NuScale to Discuss RAIs Related to DCA Section 3.9.2 Dynamic Testing and Analysis of Systems, Components, and Equipment)
- ML19267A186 + (Monthly Teleconference Meeting with NuScale to Discuss RAIs Related to DCA Section 3.9.2 Dynamic Testing and Analysis of Systems, Components, and Equipment)
- ML20031F050 + (Monthly Title List of Documents Received from Westinghouse. Related Matl Encl)
- ML20133B271 + (Monthly Trend Rept for Oct 1996)
- ML110660653 + (Monthly Turtle Removal Summary for February 2011)
- ML11095A005 + (Monthly Turtle Removal Summary for March 2011)
- ML19347F340 + (Monthly Ultrasonic Imaging Lab Rept for Mar 1981)
- ML102590607 + (Monthly Update of the Projected Schedule for Completion of the Safety and Environmental Evaluations)
- 05000334/LER-1983-014-03, Monthly Valve Stroke Tests of Refueling Water Storage Tank to Low Head Safety Injection Pump Suction Valves Not Conducted.Caused by Deficiency in Surveillance Program + (Monthly Valve Stroke Tests of Refueling Water Storage Tank to Low Head Safety Injection Pump Suction Valves Not Conducted.Caused by Deficiency in Surveillance Program)
- ML25339A069 + (Monthly Web Stat Allegations Substantiated with Regulatory Response Received January 2021 - November 2025)
- ML25339A067 + (Monthly Web Stat Allegations from External Sources, Substantiated Received January 2021 - November 2025)
- ML25339A063 + (Monthly Web Stat Allegations from External Sources Still Under Evaluation Received January 2021 - November 2025)
- ML25339A058 + (Monthly Web Stat Allegations from External Sources Received January 2021 - November 2025)
- ML25339A060 + (Monthly Web Stat Allegations from Onsite Sources Received January 2021 - November 2025)
- ML25339A055 + (Monthly Web Stat Discrimination Allegations from External Sources Received January 2021 - November 2025)
- ML20058A099 + (Monthy Operating Repts for Sept 1978)
- ML17094A435 + (Monticello - Notification of NRC Supplemental Inspection (95001) and Request for Information)
- NRC-2009-0399, Monticello Nuclear Generating Plant - Final Environmental Assessment + (Monticello Nuclear Generating Plant - Final Environmental Assessment)
- ML032960173 + (Monticello Nuclear Generating Plant, Palisades Plant, Point Beach Nuclear Plant, Unit Nos. 1 and 2, and Prairie Island Nuclear Generating Plant, Unit Nos 1 and 2)
- ML13246A471 + (Monticello Request for Waiver - Drm)
- 05000263/FIN-2012002-04 + (Monticello Susceptibility to Degraded Voltage and Under Voltage Conditions Identified by January 30, 2012, Event at the Byron Station)
- L-HU-08-018, Monticello, and Prairie Island Plants - Fitness for Duty Performance Data + (Monticello, and Prairie Island Plants - Fitness for Duty Performance Data)
- L-MT-05-052, Monticello. Response to Request for Additional Information and Submittal of Additional Information in Support of the Plant License Renewal Application + (Monticello. Response to Request for Additional Information and Submittal of Additional Information in Support of the Plant License Renewal Application)
- ML040290846 + (Monticello/Prairie Island Public Meeting Handouts 1/28/04)
- L-MT-13-079, Monticellos First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (Monticellos First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049))
- L-MT-13-080, Monticellos First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (Monticellos First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051))
- ML20087M668 + (Montyly Operating Repts for Feb 1984)
- ML21007A307 + (Monument Health, Inc., 40-00238-04, 60-Day Expiry Notification)
- ML18215A313 + (Monumenta Nipponica, Vol. 46, No. 2 (Summer, 1991), Pp. 211-235)
- ML18109A420 + (Moon Pak, MD, Notice of Expiration of License 21-32680-01)
- ML072680322 + (Moore, K. 2006, Nitrogen Level Feeds Growth of Threats to Ecosystem, Asbury Park Press, July 1)
- ML040850109 + (Moran/Anzaldi Letter Dated 02/06/2004, Regarding a Meeting to Discuss Entergy Nuclear Northeasts Plans to Construct an Independent Spent Fuel Storage Installation (ISFSI) at the Indian Point)
- ML20136B561 + (More Const for Money,Summary Rept of Const Industry Cost Effectiveness Project)
- ML022270390 + (More than 1,200 Could Die Under Nuclear Relicensing Program, Submitted by Sandy C. Smith, Member of Pennsylvania Environmental Network)
- 05000270/LER-2021-004, More than One Axial Power Shaping Rod Not Aligned within Technical Specification Limits + (More than One Axial Power Shaping Rod Not Aligned within Technical Specification Limits)
- ML20086R241 + (Moreca: a Computer Code for Simulating Modular HIGH- Temperature GAS-COOLED Reactor Core Heatup Accidents)
- ML11195A339 + (Morgan Lewis on Behalf of Northeast Utilities and Nstar - Submittal of Supplemental Response to Requests for Additional Information and Negation Action Plan)
- ML18197A377 + (Morgar CSP Dba Carolina Cardiovascular Diagnostics - NRC Form 591M Part 1, Inspection Report 03038493/2018001)
- ML082590483 + (Morning Report - 1-2008-0009 - Entergy Announces Management Changes)
- ML042960199 + (Morning Report - Oconee, Units 1, 2 and 3 Regarding the Reported Inoperability of Both on-site Emergency Power Sources)
- ML052790435 + (Morning Report - Region I, Notification MR Number: 1-2004-002)
- ML060930379 + (Morning Report 1-2006-0004 - Entergy Northeast Executive Assignments)
- ML070510543 + (Morning Report 1-2007-0002 - Management Changes for Entergy Nuclear)