Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-2018-136, L-2018-136-Attachment 5 Enclosure 1 - Joint Application for Individual Environmental Resource Permit/Authorization to Use State-Owned Submerged Lands/Federal Dredge and Fill Permit + (L-2018-136-Attachment 5 Enclosure 1 - Joint Application for Individual Environmental Resource Permit/Authorization to Use State-Owned Submerged Lands/Federal Dredge and Fill Permit)
- ML18247A510 + (L-2018-136-Attachment 5 Enclosure 1 - Joint Application for Individual Environmental Resource Permit/Authorization to Use State-Owned Submerged Lands/Federal Dredge and Fill Permit)
- L-2018-136, L-2018-136-Attachment 5 Enclosure 2 - Us Dept of the Army May 7, 2018 Letter to FPL Re Permit to Begin Construction + (L-2018-136-Attachment 5 Enclosure 2 - Us Dept of the Army May 7, 2018 Letter to FPL Re Permit to Begin Construction)
- ML18247A511 + (L-2018-136-Attachment 5 Enclosure 2 - Us Dept of the Army May 7, 2018 Letter to FPL Re Permit to Begin Construction)
- L-2018-136, L-2018-136-Attachment 5 Enclosure 3 - Us Dept of the Army Letter Re Authorization of Placement 181,000 Cubic Yards of Fill Over 7.5 Acres + (L-2018-136-Attachment 5 Enclosure 3 - Us Dept of the Army Letter Re Authorization of Placement 181,000 Cubic Yards of Fill Over 7.5 Acres)
- ML18247A512 + (L-2018-136-Attachment 5 Enclosure 3 - Us Dept of the Army Letter Re Authorization of Placement 181,000 Cubic Yards of Fill Over 7.5 Acres)
- L-2018-136, L-2018-136-Attachment 5 Enclosure 4 - Florida Department of Environmental Protection Letter Submitting Environmental Resource Permit No. 13-0127512-013 + (L-2018-136-Attachment 5 Enclosure 4 - Florida Department of Environmental Protection Letter Submitting Environmental Resource Permit No. 13-0127512-013)
- ML18247A513 + (L-2018-136-Attachment 5 Enclosure 4 - Florida Department of Environmental Protection Letter Submitting Environmental Resource Permit No. 13-0127512-013)
- L-2018-136, L-2018-136-Attachment 5 Enclosure 5 - FPL Turkey Point Cooling Canal System Characterization Study + (L-2018-136-Attachment 5 Enclosure 5 - FPL Turkey Point Cooling Canal System Characterization Study)
- ML18247A514 + (L-2018-136-Attachment 5 Enclosure 5 - FPL Turkey Point Cooling Canal System Characterization Study)
- L-2018-136, L-2018-136-Attachment 53 Enclosure 1 - Slides and Presentations + (L-2018-136-Attachment 53 Enclosure 1 - Slides and Presentations)
- ML19295E714 + (L-2018-LLA-0222 and L-2018-LLE-0013 -Withdrawal FRN 2019-10-22)
- ML18192B858 + (L-2018-LLR-0085 - Acceptance Email for RR BWRVIP Requirements 2018-07-06)
- ML18255A129 + (L-2018-SPR-0001 Amend 11 091118 Enclosure 1 Non-Sensitive Conditions)
- ML18255A176 + (L-2018-SPR-0001 Amend 11 SER Enclosure 2 091118)
- ML20244A293 + (L-2019-LLE-0016 Exemption (2020-08-27))
- ML20244A294 + (L-2019-LLE-0016 Notice of Issuance of Exemption (2020-08-27))
- ML20237F338 + (L-2019-LLE-0016 TMI1 EP Exemption EA)
- L-2021-157, L-2021-157 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 6 Responses + (L-2021-157 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 6 Responses)
- ML24082A256 + (L-2024-LRM-0037 - Sequoyah 3-18-2024 Pre-Submittal Meeting - Technical Specification 3.9.8 Decay Time Meteorological)
- EPID:L-2024-LRM-0037 + (L-2024-LRM-0037 - Sequoyah 3-18-2024 Pre-Submittal Meeting - Technical Specification 3.9.8 Decay Time Meteorological)
- L-2025-026, L-2025-026, Nuclear Property Insurance - 10 CFR 50.54(w)(3) + (L-2025-026, Nuclear Property Insurance - 10 CFR 50.54(w)(3))
- ML21137A321 + (L-21-025 Post Exam Submittal Cover Letter)
- ML24045A032 + (L-23-221 Proposed Exam Submittal Cover Letter)
- ML19305E686 + (L-85 Reactor - Annual Operations for 1979)
- ML20004D063 + (L-85 Reactor - Annual Operations for 1980)
- ML20055B753 + (L-85 Reactor - Annual Operations for Yr 1981)
- ML20077H289 + (L-85 Reactor - Operations Rept for 820101-830301)
- ML20076B005 + (L-85 Reactor,Annual Operations for 1978)
- L-MT-14-024, L-MT-14-024, Request for NRC Assistance to Obtain Information on Dams from the Us Army Corps of Engineers (Usace) + (L-MT-14-024, Request for NRC Assistance to Obtain Information on Dams from the Us Army Corps of Engineers (Usace))
- L-MT-22-052, L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative + (L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative)
- EPID:L-2022-LLR-0088 + (L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative)
- ML22039A342 + (L-PI-22-004 Prairie Island Nuclear Generating Plant Unit 2 10 CFR 50.55a Request No. RR-08, Request for Alternative to ISTC 3630(f))
- L-PI-22-004, L-PI-22-004 Prairie Island Nuclear Generating Plant, Unit 2, 10 CFR 50.55a Request No. RR-08, Request for Alternative to ISTC 3630(f) + (L-PI-22-004 Prairie Island Nuclear Generating Plant, Unit 2, 10 CFR 50.55a Request No. RR-08, Request for Alternative to ISTC 3630(f))
- ML22039A340 + (L-PI-22-004 Prairie Island Nuclear Generating Plant, Unit 2, 10 CFR 50.55a Request No. RR-08, Request for Alternative to ISTC 3630(f))
- EPID:L-2022-LLR-0012 + (L-PI-22-004 Prairie Island Nuclear Generating Plant, Unit 2, 10 CFR 50.55a Request No. RR-08, Request for Alternative to ISTC 3630(f))
- ML24042A001 + (L-PI-24-008 Prairie Island Nuclear Generating Plant (PINGP) Unit 2 Inservice Testing Proposed Alternative RR-09)
- EPID:L-2024-LLR-0015 + (L-PI-24-008 Prairie Island Nuclear Generating Plant (PINGP) Unit 2 Inservice Testing Proposed Alternative RR-09)
- ML24262A151 + (L-PI-24-011 150 Day Letter 2024 PINGP ILT NRC Exam)
- ML24262A199 + (L-PI-24-018 PINGP 75 Day Letter)
- ML24288A011 + (L-PI-24-048 Prairie Island Nuclear Generating Plant (PINGP) Unit 1 Inservice Testing Proposed Alternative RR-10)
- ML25007A235 + (L-PI-25-001 Prairie Island Nuclear Generating Plant (Pingp), Unit 2 Inservice Testing Proposed Alternative RR-10)
- ML18247A509 + (L-Turkey Point Units 3 and 4 - Subsequent License Renewal Application - Environmental Report Requests for Additional Information Responses)
- ML071550289 + (L. Dean Ltr Culmination of NRC Participation in the Memorandum of Agreement on the Big Rock Point Site)
- ML15082A055 + (L. Frantin (Citizen) Email - Pilgrims Problems: Juno, Scrams, and Useless Back-Up Plans)
- ML25167A109 + (L. Jackson-Street Spirit Lake Tribe, Section 106 Consultation and Notification of the Issuance of the Draft Environmental Impact Statement for the Construction Permit Application for Kemmerer Power Station Unit 1 in Lincoln County, Wyoming)
- ML25167A111 + (L. Juan Tendoy Shoshone Bannock Tribes, Section 106 Consultation and Notification of the Issuance of the Draft Environmental Impact Statement for the Construction Permit Application for Kemmerer Power Station Unit 1 in Lincoln County, Wyomi)
- ML081780437 + (L. Mahlahla, Ltr. Acknowledgement of Receipt of License Amendment Request No.7, ESADA Vallecitos Experimental Superheat Reactor (Docket No. 50-183, License No DR-10))
- ML041120490 + (L. Podolak Ltr. Receipt of Application - Acknowledgement Letter)
- ML102160424 + (L. Potter Letter Applicability of the Revised 10 CFR 73.55 Rule to the Big Rock Point Restoration Site (TAC L60619))
- 05000316/LER-2078-016-03, L. Re Removal of Emergency Diesel Generator from Service for Maintenance + (L. Re Removal of Emergency Diesel Generator from Service for Maintenance)