Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20237J661 + (Inservice Insp Rept for 850828-870112,per ASME Boiler & Pressure Vessel Code Section Xi,Form NIS-1)
- ML20141N765 + (Inservice Insp Rept for 851019-1211.One Half of Exams Required Tech Specs for First Period of Third Interval Completed & Identified in Rept)
- ML17216A510 + (Inservice Insp Rept for 851020-1224.Listed Components Inspected & NDE Techniques & Results Discussed.Statement Re Status of Work for Current Interval Encl)
- ML20235J875 + (Inservice Insp Rept for 851225-870629.Rept Exam Summary for Refueling Outage,Interval 1,Period 3.Areas Inspected Include Class 1,2 & 3 Components,Piping & Component Supports)
- ML17347A188 + (Inservice Insp Rept for 860111-0901,describing Results of Eddy Current Exam of Steam Generator Tubes & Data Rept for Repairs or Replacements)
- ML17199T448 + (Inservice Insp Rept for 861128-870323.Reactor Pressure Vessel & Primary Sys Piping Inspected & Corrected)
- ML20246F950 + (Inservice Insp Rept for 880216-22.Insp Satisfied Min Inservice Insp Frequency as Outlined in Tech Spec 4.4.5.3. Tubes Inspected Full Length from Cold Leg Channel Head W/ Bobbin Coil Probe)
- ML17223A231 + (Inservice Insp Rept for 890201-0428.Exam Included Class I & II Components & Piping Sys)
- ML20247F671 + (Inservice Insp Rept for 890224.Rept Documents Manual Insps of Plant Piping & Components Performed During Fourth Refueling Outage)
- ML16341G425 + (Inservice Insp Rept for 920122)
- ML20246P981 + (Inservice Insp Rept for Beaver Valley Power Station Unit 2, for Period 871117-890601)
- ML20214U771 + (Inservice Insp Rept for Beaver Valley Power Station Unit 1, Outage 5 (First Interval,Third Period), on ASME Class 1 & 2 Components & Piping Examined Between Mar 1985 & Aug 1986)
- ML20235Z447 + (Inservice Insp Rept for End of Cycle 1 Refueling Outage Steam Generator)
- ML20203F928 + (Inservice Insp Rept for Interval 2,Period 1,Outage 1 on 850905-860122.Eddy Current Exam Resulted in Plugging Three Tubes in Steam Generator B & One Tube in Steam Generator C)
- ML20149J665 + (Inservice Insp Rept for Mar-Apr 1987,consisting of Steam Generator Tube Eddy Current Exam)
- ML13330A903 + (Inservice Insp Rept for May 1980.Describes Exams Performed on Class 1 & 2 Components & Piping Sys)
- ML20148T033 + (Inservice Insp Rept for North Anna Power Station Unit 2)
- ML20138B914 + (Inservice Insp Rept for Northeast Utils Millstone Unit 1 1985 Refueling Outage on 851025-1223 of NDE Performed Per Section XI of ASME Boiler & Pressure Vessel Code,1980 Edition,Including Winter 1980 Addenda)
- ML17222A600 + (Inservice Insp Rept for Second 10 Yr Interval)
- ML20148D721 + (Inservice Insp Rept for Sept-Dec 1987.Rept Includes Summary of Exam Results,Exam Plan for Outage 7,evaluation Repts, Certification of Personnel,Equipment & Matl & Requests for Relief & Isometric Drawings Pertinent to Outage)
- ML20205T348 + (Inservice Insp Rept for Steam Generator Tubes.Total of 2,794 Tubes in Generator a & 2,536 Tubes in Generator B,Examined. Eighteen Tubes in Generator a & One Tube in Generator B Removed from Svc)
- ML20128P330 + (Inservice Insp Rept for Steam Generators 2,3 & 4 Performed During Apr/May 1984)
- ML20059H823 + (Inservice Insp Rept for TMI-1)
- ML17263A339 + (Inservice Insp Rept for Third Interval (1990 - 1999) Second Period,First Outage (1993) at Re Ginna Nuclear Power Plant)
- ML20236S602 + (Inservice Insp Rept for Trojan Unit 1 Nuclear Generating Plant)
- ML20199K871 + (Inservice Insp Rept for Unit 2 Catawba 1998 Refueling Outage 9)
- ML20097G023 + (Inservice Insp Rept for Unit 2 McGuire 1992 Refueling Outage 7)
- ML20065D857 + (Inservice Insp Rept for VC Summer Nuclear Station Unit 1, Per ASME Code Rules)
- ML20153B229 + (Inservice Insp Rept from 780129-780828,covering 1978 Refueling Outage Insp W/Abstract of Examinations Performed by Nuclear Engineering Svcs & NDT Engineering Personnel)
- ML20248D391 + (Inservice Insp Rept of North Anna Power Station Unit 2, for Third Period,First Interval Refueling Outage)
- ML20024H705 + (Inservice Insp Rept of North Anna Power Station Unit 1)
- ML19327B122 + (Inservice Insp Rept of North Anna Power Station Unit 1)
- ML20066K513 + (Inservice Insp Rept of North Anna Power Station Unit 2)
- ML20248D398 + (Inservice Insp Rept of North Anna Power Station Unit 2)
- ML18151A159 + (Inservice Insp Rept of Surry Nuclear Power Station Unit 2, Second Interval,Second/Third Period)
- ML20011D386 + (Inservice Insp Rept of Surry Nuclear Power Station Unit 2, 2nd Interval,2nd Period)
- ML20205F508 + (Inservice Insp Rept of Surry Nuclear Power Station,Unit 1)
- ML20248E765 + (Inservice Insp Rept of Wolf Creek Generating Station)
- ML20053B404 + (Inservice Insp Rept on 770915-17,1129 & 1201.Describes Lambert,Macgill,Thomas,Inc Ultrasonic & Visual Exams of Feedwater Nozzles & Core Spray Sys Welds.Exams Revealed Some Geometric Indication Caused by Mismatch or Weld Crown)
- ML20003B140 + (Inservice Insp Rept on 780911-801107.Summarizes Examination of Reactor Vessel for Refueling Outage.Results of Pressure Piping Attachment Weldments Survey Serve as Baseline Data for New Mods on Existing Support Components)
- ML20053B434 + (Inservice Insp Rept on 781017.Lambert,MacGill,Thomas,Inc & TVA Exam of Welds Revealed No Indications or Need for Repairs)
- ML20053B460 + (Inservice Insp Rept on 790515-17.Lambert,MacGill,Thomas,Inc & TVA Exams of Welds Revealed No Need for Repairs)
- ML20053B441 + (Inservice Insp Rept on 800105-0308.Lambert,MacGill,Thomas, Inc & TVA Exam of Welds Revealed Four Relevant Indications. No Repair Necessary)
- ML19336A698 + (Inservice Insp Rept on 800118-0611.Describes Examinations Performed on Selected Class 1 & 2 Components During Jan- Feb 1980 Refueling Outage)
- ML18139B557 + (Inservice Insp Rept on 800920-810705.Exam Procedures Were Approved Prior to Exams & Certification Documents Re Personnel,Equipment & Matls Were Reviewed & Determined to Be Satisfactory)
- ML20053B451 + (Inservice Insp Rept on 801204.TVA Inspected Welds.No Repairs Necessary)
- ML19347F303 + (Inservice Insp Rept on 810223-0323.Describes Exam Results of Pressure Retaining Components & Supports of Reactor Coolant, Reactor Pressure Vessel & Bolting of Seismic Supports. Integrity of Sys Has Been Maintained)
- ML18139B555 + (Inservice Insp Rept on 810301-0705.Exams Conducted to Review Exam Zone within Geometric,Metallurgical & Physical Limitations.No Indications Found to Be Recordable)
- ML20010H468 + (Inservice Insp Rept on 810701-13.Describes Exams Performed During Reactor Coolant Pump Maint Outage)
- ML20054E090 + (Inservice Insp Rept on 810820-820104.Describes Nondestructive Exams Performed on Plant Components & Piping)
- ML20033D088 + (Inservice Insp Rept on 810906-11.Describes Exam Performed on Steam Generator Tube Eddy Current)