Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000237/FIN-2017007-02 + (Inadequate Procedure Steps to Ensure Proper Valve Rotation for Cold Shutdown Repair)
- 05000482/FIN-2011009-01 + (Inadequate Procedure To Adjust the Compensation In Emergency Diesel Generator Governor)
- 05000368/FIN-2016009-02 + (Inadequate Procedure Used as a Compensatory Measure)
- 05000416/FIN-2009008-01 + (Inadequate Procedure Used to Vent the Reactor Core Isolation Cooling System)
- 05000286/FIN-2012002-02 + (Inadequate Procedure and Instructions for Placing Pressure Regulator in Service)
- 05000286/FIN-2011003-01 + (Inadequate Procedure and Procedural Compliance for 33 Inverter Overhaul)
- 05000387/FIN-2012004-01 + (Inadequate Procedure for Acts of Nature)
- 05000341/FIN-2016007-01 + (Inadequate Procedure for Addressing Non-Functional MDCT Fan Motor Brake System)
- 05000254/FIN-2012011-02 + (Inadequate Procedure for Cold Shutdown Repair of 1A Recirculation Pump Discharge Valve Mo 1-202-5A)
- 05000285/FIN-2013008-01 + (Inadequate Procedure for Combating Frazil Ice)
- 05000285/FIN-2013008-05 + (Inadequate Procedure for Combating Loss of RAW Water)
- 05000271/FIN-2013003-03 + (Inadequate Procedure for Configuration Control Results in a Dislodged Secondary Containment Blowout Panel Due to Reactor Building Ventilation System Pressurization)
- 05000387/FIN-2013002-05 + (Inadequate Procedure for Control Room Cooling Fan Train Failure)
- 05000395/FIN-2013005-02 + (Inadequate Procedure for Control of Containment Penetrations)
- 05000483/FIN-2014007-08 + (Inadequate Procedure for Cooling Instrumentation During a Station Blackout Event.)
- 05000293/FIN-2014002-02 + (Inadequate Procedure for Determining Operability of the Shutdown Transformer)
- 05000282/FIN-2012011-02 + (Inadequate Procedure for Draining of Reactor Coolant System)
- 05000445/FIN-2009005-01 + (Inadequate Procedure for Environmentally Qualified Actuator Refurbishment)
- 05000440/FIN-2014002-01 + (Inadequate Procedure for Extreme Cold Weather)
- 05000482/FIN-2010008-02 + (Inadequate Procedure for Fill and Vent of the Component Cooling Water System)
- 05000331/FIN-2014008-05 + (Inadequate Procedure for Flow Balancing ESW System)
- 05000244/FIN-2011003-02 + (Inadequate Procedure for Fuel Transfer Flange Installation)
- 05000263/FIN-2016007-01 + (Inadequate Procedure for Identification of Significant Conditions Adverse to Quality)
- 05000400/FIN-2011003-02 + (Inadequate Procedure for Identifying Accumulated Gas in ECCS Systems)
- 05000335/FIN-2010004-02 + (Inadequate Procedure for Installation of PZ Safety Valves)
- 05000269/FIN-2011010-05 + (Inadequate Procedure for Installation of SSF Submersible Pump)
- 05000269/FIN-2012002-03 + (Inadequate Procedure for Installation of Safetyrelated Control Cables)
- 05000333/FIN-2012003-02 + (Inadequate Procedure for Installation of Reactor Water Recirculation Motor- Generator Scoop Tube Positioners)
- 05000285/FIN-2013013-18 + (Inadequate Procedure for Intake Cell Level Control During a Flooding Event)
- 05000335/FIN-2010002-02 + (Inadequate Procedure for Main Steam Isolation Valve Testing)
- 05000220/FIN-2009002-02 + (Inadequate Procedure for Main Steam Isolation Valve Troubleshooting)
- 05000338/FIN-2014004-01 + (Inadequate Procedure for Maintaining MCR/ESGR Air Handler)
- 05000324/FIN-2008003-01 + (Inadequate Procedure for Performing Maintenance on the Control Room AC Subsystem)
- 05000440/FIN-2014005-02 + (Inadequate Procedure for Performing an Acceptable Technical Specification Required Channel Check)
- 05000286/FIN-2018001-02 + (Inadequate Procedure for Placing Chemical and Volume Control System Demineralizer In Service)
- 05000338/FIN-2009008-03 + (Inadequate Procedure for Powering Credited Components for Fire in Cable Vault & Tunnel)
- 05000255/FIN-2014004-01 + (Inadequate Procedure for Protection against High Winds)
- 05000316/FIN-2012008-08 + (Inadequate Procedure for RCS Vacuum Fill During Reduced Inventory Operations)
- 05000369/FIN-2009006-01 + (Inadequate Procedure for RN System Flow Balancing)
- 05000353/FIN-2015003-01 + (Inadequate Procedure for RWCU Backwashing Operations)
- 05000361/FIN-2009002-04 + (Inadequate Procedure for Reactivity Manipulations)
- 05000313/FIN-2009002-01 + (Inadequate Procedure for Reactor Protection System Maintenance)
- 05000313/FIN-2008005-02 + (Inadequate Procedure for Reactor Vessel Head Lift)
- 05000327/FIN-2007006-03 + (Inadequate Procedure for Reduced INVENTORY/MID-LOOP Operation)
- 05000416/FIN-2013002-06 + (Inadequate Procedure for Removal of a Foreign Material Exclusion Plug)
- 05000316/FIN-2012008-05 + (Inadequate Procedure for Responding to a MODE 4 LOCA)
- 05000335/FIN-2010004-03 + (Inadequate Procedure for Restoration of Non-Essential CCW Flow Following SIAS)
- 05000335/FIN-2009006-04 + (Inadequate Procedure for Restoration of Non-Essential CCW Flow Following a SIAS)
- 05000335/FIN-2012008-01 + (Inadequate Procedure for Severe Weather Mitigation)
- 05000313/FIN-2015002-01 + (Inadequate Procedure for Severe Weather Preparation)
- 05000458/FIN-2018301-01 + (Inadequate Procedure for Shutdown Operations Protection Plan)