Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Gap Analysis of the Reactor Oversight Process (ROP)". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML21111A094  + (Gao Form- House Revision 6 of Regulatory Guide (RG) 1.101)
  • ML20160A167  + (Gao Form- House for RG 1.100)
  • ML20324A719  + (Gao Form- House for RG 1.177)
  • ML20324A024  + (Gao Form- House for RG 1.191)
  • ML20275A227  + (Gao Form- House for Regulatory Guide (RG) 1.236, Revision 0, Pressurized-Water Reactor Control Rod Ejection and Boiling-Water Reactor Control Rod Drop Accidents)
  • ML21042A042  + (Gao Form- House for Regulatory Guide 1.136)
  • ML20105A469  + (Gao Form- House for Rev 1 RG 8.39)
  • ML21089A070  + (Gao Form- Senate RG 1.105 Rev. 4, Setpoints for Safety-Related Instrumentation)
  • ML20160A206  + (Gao Form- Senate for RG 1.100)
  • ML20160A168  + (Gao Form- Senate for RG 1.100)
  • ML21071A207  + (Gao Form- Senate for RG 1.240 Fresh and Spent Fuel Pool Criticality Analyses)
  • ML21042A041  + (Gao Form- Senate for Regulatory Guide 1.136)
  • ML20105A413  + (Gao Form- Senate for Revision 2 of Regulatory Guide (RG) 7.4, Leakage Tests on Packages for Shipment of Radioactive Material)
  • ML20105A466  + (Gao Form- Senate for rev1 RG 8.39)
  • ML21111A096  + (Gao Form- Senate of Revision 6 of Regulatory Guide (RG) 1.101)
  • ML20324A721  + (Gao Form- Senate, Regulatory Guide (RG) 1.177)
  • ML20324A720  + (Gao Form- for RG 1.177)
  • ML20275A229  + (Gao Form- for RG 1.236 Rev 0)
  • ML20105A468  + (Gao Form- for Rev 1 RG 8.39)
  • ML21071A206  + (Gao Form-House for RG 1.240 Fresh and Spent Fuel Pool Criticality Analyses)
  • ML19186A103  + (Gao Has Taken the Citizens Recommendations to the NRC Under Advisement, Concerning the Public hearings-related Portion of the Gaos on-going Assessment of NRCs Effectiveness and Efficiency)
  • ML25196A332  + (Gao Letter on Nuclear Regulatory Commission Fee Schedules, Fee Recovery for Fiscal Year 2025)
  • ML041750387  + (Gao Report Excerpts)
  • ML24179A310  + (Gao Report Response Letter with Recommendations - LTR-24-0147-1-OCIO (OEDO-24-00196-OCIO))
  • ML21071A205  + (Gao for RG 1.240 Fresh and Spent Fuel Pool Criticality Analyses)
  • ML20098C399  + (Gap Analysis Presentation)
  • ML103620379  + (Gap Analysis of the Reactor Oversight Process (ROP))
  • ML103620349  + (Gap Analysis of the Reactor Oversight Process (ROP))
  • ML20101M531  + (Gap Aw Vogtle Unit 1 Reactor Vessel Radiation Surveillance Program)
  • ML20101M541  + (Gap Aw Vogtle Unit 2 Reactor Vessel Radiation Surveillance Program)
  • ML20063G943  + (Gap Brief Re Staff Release of Certain Investigatory Matl.* Requests That Licensing Board Decline to Review OI Rept in Camera & Deny Intervenor Request That OI Rept Be Released Prior to Staff Final Decision.W/Certificate of Svc)
  • ML20062G694  + (Gap Conductance Test Series,Test Results Rept for Tests Gc 2-1,GC 2-2 & Gc 2-3)
  • ML19338E431  + (Gap Conductance Test Series:Fuel Characterization Data Rept)
  • ENS 40893  + (Gap Discovered in Control Room Envelope)
  • 05000346/LER-1980-008-03, Gap Discovered in Wall Where Five two-inch Conduits Go from Electrical Penetration Room 2 to Cable room.Six-inch Gap Around Ventilation Duct Also Found.Caused by Improper Initial Installation  + (Gap Discovered in Wall Where Five two-inch Conduits Go from Electrical Penetration Room 2 to Cable room.Six-inch Gap Around Ventilation Duct Also Found.Caused by Improper Initial Installation)
  • ML20036A388  + (Gap First Set of Interrogatories to AL Mosbaugh.* Util Requests That AL Mosbaugh Answer Following Interrogatories in Writing & Under Oath within 14 Days of Svc of Document. W/Certificate of Svc & Svc List.Related Correspondence)
  • ML20087K348  + (Gap First Supplemental Response to Intervenor Fifth Interrogatory & Document Request.* Response Suppls Gap Prior Response to Interrogatory 7.W/Certificate of Svc & Svc List. Related Correspondence)
  • ML20087K362  + (Gap Memorandum of Law on attorney-client Privilege.* Informs That Board Should Determine That attorney-client Privilege Applies to Communications Between Counsel for Gap & M Ajluni.W/Certificate of Svc & Svc List)
  • ML20082J073  + (Gap Motion for Order Terminating Proceeding.* Informs That Staff Does Not Oppose Motion.W/Certificate of Svc & Svc List)
  • ML20077C104  + (Gap Motion for Reconsideration of Sequestration Order.* Licensing Board Should Reconsider Sequestration & Permit Util Counsel to Communicate W/Witnesses on All Issues Re Proceeding.W/Certificate of Svc & Svc List)
  • ML20062N102  + (Gap Motion to Compel NRC Staff Response to Certain Interrogatories.* Informs That Util Moves Licensing Board for Order Compelling NRC Staff to Respond to Interrogatories 9 & 10 of Util First Set.W/Certificate of Svc & Svc List)
  • ML20087K473  + (Gap Opposition to Intervenor Supplemental Motion to Compel Interview Notes & Other Documents Known to Gap Counsel When Preparing Response to Nov.* Informs That Motion Should Be Denied.W/Certificate of Svc & Svc List)
  • ML20094J928  + (Gap Proposed Findings of Fact & Conclusions of Law on Diesel Generator Reporting Issues.* Findings of Fact & Conclusion Accepted.W/Certificate of Svc)
  • ML20076K112  + (Gap Response to Board 940920 Request.* Gap Concludes That Staff Position Correct & Commissioners Should Be Exempt from Having to Identify Documents Considered in Decision to Issue 940509 Nov.W/Certificate of Svc & Svc List)
  • ML20045D838  + (Gap Response to Intervenor Info & Brief Concerning Motion for Protective Order.* Intervenor Has Not Established That Six Tapes Protected by Work Product Doctrine.W/Certificate of Svc & Svc List)
  • ML20036C052  + (Gap Response to Intervenor Request for Protective Order.* Licensing Board Should Deny Intervenor 930514 Filing, Including Request for Protective Order.W/Certificate of Svc & Svc List)
  • ML20070H823  + (Gap Responses to Intervenor Fourth Interrogatory & Document Request.* W/Certificate of Svc & Svc List.Related Correspondence)
  • 05000315/FIN-2009003-03  + (Gap in Remote Strainer Waterway)
  • ML19274C862  + (Gapcon-Thermal-3 Verification & Comparison to In-Reactor Data)
  • Information Notice 1987-43, Gaps in Neutron-Absorbing Material in High-Density Spent Fuel Storage Racks  + (Gaps in Neutron-Absorbing Material in High-Density Spent Fuel Storage Racks)
  • 05000336/FIN-2012005-03  + (Gaps in West 480V Switchgear HELB Barrier May Impact Safety Related Equipment)
  • ML20062H524  + (Gardiners Invitation Letter)