Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Revised Tech Specs,For Review & Approval". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20248D285  + (Forwards Revised Tech Specs for 890329 Application for Amends to Licenses DPR-62 & DPR-71 Re Max Extended Operating Domain,Per NRC Request)
  • ML19309G339  + (Forwards Revised Tech Specs for Facility Filter Testing. Implementation of Tech Specs Will Not Be Completed Until 800901 Due to 720-h Carbon Analysis Requirements.Revisions Reviewed & No Unreviewed Safety Questions Were Noted)
  • ML20079E509  + (Forwards Revised Tech Specs for License R-78)
  • ML20133G849  + (Forwards Revised Tech Specs for License Submittal.Revs Include Changes in Form,Per NRC Request)
  • ML20133G852  + (Forwards Revised Tech Specs for License Submittal.Revs Include Changes in Form,Per NRC Request)
  • ML20043C318  + (Forwards Revised Tech Specs for Licensee Application for Proposed Amend,Filed on 890605 & Supplemented on 891103,per Board Chairman Request.Missing Pages from Original Submittal Inserted in Encl)
  • ML17325B198  + (Forwards Revised Tech Specs for Reduced Temp & Pressure Program,Per 890602 Meeting W/Nrc.Westinghouse Evaluation Encl Gives Results of Impact of Relaxed Charging Flow Requirements on Applicable Analyses Submitted for Program)
  • ML17325B200  + (Forwards Revised Tech Specs for Reduced Temp & Pressure Program,Per 890602 Meeting W/Nrc.Westinghouse Evaluation Encl Gives Results of Impact of Relaxed Charging Flow Requirements on Applicable Analyses Submitted for Program)
  • W3P88-0993, Forwards Revised Tech Specs for Testing of Log Power Trip Based on Discussions W/Nrc.Changes Being Made to 880128 Submittal to Add New Surveillance Requirement.Safety Analysis Remains Bounding  + (Forwards Revised Tech Specs for Testing of Log Power Trip Based on Discussions W/Nrc.Changes Being Made to 880128 Submittal to Add New Surveillance Requirement.Safety Analysis Remains Bounding)
  • ML19340B142  + (Forwards Revised Tech Specs for Triga Mark I.Current & Expected Staff Funding Revisions Encl)
  • ML19340B143  + (Forwards Revised Tech Specs for Triga Mark I.Current & Expected Staff Funding Revisions Encl)
  • ML20133L979  + (Forwards Revised Tech Specs in Support of Request for Extension of License R-125)
  • ML18053A550  + (Forwards Revised Tech Specs to 871125 Application for Amend to License DPR-20,per NRC Request.Rev Includes Deletion of alpha-numerical Quadrant Locations of Core Exit Thermocouples)
  • ML18053A551  + (Forwards Revised Tech Specs to 871125 Application for Amend to License DPR-20,per NRC Request.Rev Includes Deletion of alpha-numerical Quadrant Locations of Core Exit Thermocouples)
  • ML20012E715  + (Forwards Revised Tech Specs to Proposed License Amend Application,Per Request.W/O Encl)
  • ML20011F034  + (Forwards Revised Tech Specs to Replace All Previous Tech Specs Submittals)
  • ML20134E343  + (Forwards Revised Tech Specs to Suppl 841109 License Application.Revs Include Most Recent Info Available & Changes Per Telcons W/Nrc)
  • ML20134E345  + (Forwards Revised Tech Specs to Suppl 841109 License Application.Revs Include Most Recent Info Available & Changes Per Telcons W/Nrc)
  • ML20248H306  + (Forwards Revised Tech Specs to Util 890622 Application for Amends to Licenses DPR-57 & NPF-5,per NRC Request,Re cycle- Specific Parameter Limits)
  • ML20151B289  + (Forwards Revised Tech Specs,App a to License DPR-3.W/o Encl)
  • ML20151B291  + (Forwards Revised Tech Specs,App a to License DPR-3.W/o Encl)
  • ML19256F553  + (Forwards Revised Tech Specs,Apps a & B Re Administrative Controls,Reflecting Changes Requested in 791128 Application to Amend Ol.Requests Class II Fee Classification)
  • ML19256F554  + (Forwards Revised Tech Specs,Apps a & B Re Administrative Controls,Reflecting Changes Requested in 791128 Application to Amend Ol.Requests Class II Fee Classification)
  • ML17321A783  + (Forwards Revised Tech Specs,Changing Tables 2.2-1,3.2-1 & 3.3-3 Re Rdf Resistance Temp Detector (RTD) & Two Westinghouse Proprietary Safety Evaluations Re Rdf RTD Installation.Safety Evaluations Withheld (Ref 10CFR2.790))
  • ML17321A784  + (Forwards Revised Tech Specs,Changing Tables 2.2-1,3.2-1 & 3.3-3 Re Rdf Resistance Temp Detector (RTD) & Two Westinghouse Proprietary Safety Evaluations Re Rdf RTD Installation.Safety Evaluations Withheld (Ref 10CFR2.790))
  • ML20199K128  + (Forwards Revised Tech Specs,For Review & Approval)
  • ML20116D476  + (Forwards Revised Tech Specs,Incorporating Changes in Response to Discussions During 850122 Site Visit & Telcons W/Nrc)
  • ML20112E616  + (Forwards Revised Tech Specs,Reflecting 841022 Request for Possession Only License)
  • ML20206S050  + (Forwards Revised Tech Specs,Reflecting Change in Facility Operating Status as Possession Only License,Per 990121 Telcon with NRC)
  • ML20246C518  + (Forwards Revised Tech Specs,Reflecting Editorial Changes to 890616 Application for Amend to License NPF-3 Re Relocation of cycle-specific Core Operating Limits from Tech Specs to Core Operating Limits Rept,Per 890628 Telcon W/Nrc)
  • ML19317G891  + (Forwards Revised Tech Specs.Reasons for Tech Spec Revisions Discussed)
  • ML13330A208  + (Forwards Revised Technical Assessment of SEP Topic V-II.A r5 Electrical Instrumentation & Control Features for Isolation of High & Low Pressure Sys.Evaluation Will Be Basic Input to Integrated Safety Assessment Unless NRC Told Otherwise)
  • ML17053D261  + (Forwards Revised Technical Evaluation Rept, Comparison of Plant & Model Radiological Effluent Tech Specs & Plant Offsite Dose Calculation Manual & Trip Rept of 820522-26 Site Visit.W/O Technical Evaluation Rept)
  • ML20003C808  + (Forwards Revised Technical Evaluation Rept,Submerged Demineralization Sys, Mar 1981.Requests Approval to Operate Sys)
  • ML18046A894  + (Forwards Revised Technical Evaluation Rept on SEP Topic VII-1.A.Evaluation Supports Findings of NRC Safety Evaluation Recommending Mods to Reactor Protection Sys)
  • ML20137U213  + (Forwards Revised Technical Evaluation Rept & Sys Descriptions Re Defueling Water Cleanup Sys (Dwcs).Primary Change Involves Capability to Operate Dwcs in Mode That Bypasses Filter Canisters.Fee Paid)
  • ML20137U217  + (Forwards Revised Technical Evaluation Rept & Sys Descriptions Re Defueling Water Cleanup Sys (Dwcs).Primary Change Involves Capability to Operate Dwcs in Mode That Bypasses Filter Canisters.Fee Paid)
  • ML20245C599  + (Forwards Revised Technical Evaluation Rept Which Documents NRC Evaluation Re Final Design & Remedial Action Plan for Stabilizing Tailings at Green River Site)
  • ML20209C031  + (Forwards Revised Technical Paper Entitled Effect of Environ Variables on Localized Corrosion of Carbon Steel, Prepared for Publication in Corrosion Journal.Responses to NRC Staff Comments with Revised Paper Also Attached)
  • ML20011D297  + (Forwards Revised Technical Procedure 9.101 for Approval. Change to Section 6.1 Made as Recommended & Section 7 Added)
  • ML20027D779  + (Forwards Revised Technical Rept Re Exposure of Head Skin of Station Employee, Investigation & Reassessment of Beta & Gamma Radiation Exposure of Auxiliary Operator T on 790328)
  • ML20141D495  + (Forwards Revised Technical Repts Summarizing Results of Analysis of Capsule s for Unit 1 & Capsule P for Unit 2.Util Made No New Commitments in Ltr)
  • ML20141D489  + (Forwards Revised Technical Repts Summarizing Results of Analysis of Capsule for Unit 1 & Capsule P for Unit 2.Util Made No New Commitments in Ltr)
  • ML20045J046  + (Forwards Revised Technical Requirements (Tr),Including Rev 5 to TR/IRTS-2,Rev 7 to TR-IRTS-7,Rev 5 to TR/IRTS-8 (Cancelled) & Rev 8 to TR/IRTS-5 (Cancelled))
  • ML20083F760  + (Forwards Revised Temp Limits for Reactor Vessel,Per Amend to App G to 10CFR50.Only Cooldown Curves for Byron Unit 1 & Braidwood Unit 2 Must Be Changed to Incorporate New Closure Flange Limitations)
  • ML19341A512  + (Forwards Revised Tentative Schedule for ACRS Ad Hoc Subcommittee 790905 Meeting in Washington,Dc on Facility Accident Implications)
  • ML17213B066  + (Forwards Revised Test Abstract Clarifying Sections of Proposed Natural Circulation Testing Plan.Abstract Focuses on Reducing Impact of Test & Meeting Requirements of NUREG-0737,Item I.G.1)
  • ML20207H211  + (Forwards Revised Test Abstract for FSAR Paragraph 14.2.8.2.46,providing Info Re Loss of Offsite Power Test as Part of Startup Test Program.Abstract Will Be Included in Next FSAR Amend)
  • ST-HL-AE-1829, Forwards Revised Test Plan for Vibration Testing of Diesel Fuel Oil Piping.Rev Incorporates Proposed Changes to Allowable Velocity Equation of Ansi/Asme Std OM-3,Section 5.1.2.4.Related Correspondence  + (Forwards Revised Test Plan for Vibration Testing of Diesel Fuel Oil Piping.Rev Incorporates Proposed Changes to Allowable Velocity Equation of Ansi/Asme Std OM-3,Section 5.1.2.4.Related Correspondence)
  • ML20003C032  + (Forwards Revised Test Procedure RT-500,per NRC Request at 810210 Meeting.Increases in Power & Testing Above 70% Power Level Will Be Controlled by Normal Operating Procedures & Limitations of Test Procedure RT-500,Revision K.W/O Encl)
  • ML20132A827  + (Forwards Revised Test Rept RT-500F Incorporating Changes to Fluctuation Tests Discussed During 790813 Site Visit. Responses to NRC Questions Encl)