Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards 10CFR50.46 Annual Rept of ECCS Model Revs". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ST-HL-AE-3643, Forwards 10CFR50.46 Annual Rept of ECCS Model Revs,Including Westinghouse Small Break LOCA ECCS Evaluation Model  + (Forwards 10CFR50.46 Annual Rept of ECCS Model Revs,Including Westinghouse Small Break LOCA ECCS Evaluation Model)
  • ML20077M368  + (Forwards 10CFR50.46 Annual Rept of ECS Model Revs,Including Info Re Effects of ECCS Evaluation Model Mods & Application to Updated SAR Chapter 15.6.5 LOCA Analysis)
  • ML20101H071  + (Forwards 10CFR50.46 ECCS Evaluation Models 1995 Annual Rept, in Accordance w/WCAP-13451 & in Compliance W/Reporting Requirements of 10CFR50.46(a)(3)(ii))
  • ML20081D125  + (Forwards 10CFR50.46 ECCS Evaluation Models 1994 Annual Rept in Accordance w/WCAP-13451 & in Compliance W/Reporting Requirements of 10CFR50.46(a)(3)(ii))
  • ML20137N385  + (Forwards 10CFR50.46 ECCS Evaluation Model 1996 Annual Rept)
  • ML20137N389  + (Forwards 10CFR50.46 ECCS Evaluation Model 1996 Annual Rept.)
  • ML20059J557  + (Forwards 10CFR50.46 ECCS Model Significant Change Rept Based on WCAP-13451 & in Compliance W/Reporting Requirements of 10CFR50.46(a)(3)(ii))
  • ML20099A684  + (Forwards 10CFR50.46 Margin Utilization Byron & Braidwood Units 1 & 2, Constituting Annual ECCS Evaluation Model Change Rept for Period Ending 910725.Vendor Made No Changes to ECCS Evaluations in Past Yr)
  • ML18066A367  + (Forwards 10CFR50.46 Rept of Changes & Errors in LBLOCA ECCS Evaluation Model.Outline of Current Schedule for re-analysis of Plant LBLOCA Transient by SPC Included)
  • ML20078L325  + (Forwards 10CFR50.46 Rept of Changes or Errors in ECCS Evaluation Models.Attachment 1 Provides Listing of Change or Error in Acceptable Evaluation Model Affects Peak Fuel Cladding Temp Calculation for Particular Transients)
  • ML20035B015  + (Forwards 10CFR50.46 Rept of Changes or Errors in Large Break LOCA Evaluation Models & Current Info for Other ECCS Evaluation Models)
  • ML20102A350  + (Forwards 10CFR50.46 Rept of Changes or Errors in ECCS Evaluation Models)
  • ML20082E047  + (Forwards 10CFR50.46 Rept of Significant Changes or Errors in ECCS Evaluation Models)
  • ST-HL-AE-3835, Forwards 10CFR50.46 Rept of Significant Change to Small Break Loca/Eccs Evaluation Model Due to Notrump Computer Code Solution Convergence Reliability.Results Indicate That Peak Clad Temps Decreased from 1,499 F to 1,490 F  + (Forwards 10CFR50.46 Rept of Significant Change to Small Break Loca/Eccs Evaluation Model Due to Notrump Computer Code Solution Convergence Reliability.Results Indicate That Peak Clad Temps Decreased from 1,499 F to 1,490 F)
  • ML20035B264  + (Forwards 10CFR50.46 Thirty Day Rept Which Describes Error in Application of Approved ECCS Evaluation Model for Quad Cities Power Station.Rept Discusses Impact of Error Identified in LPCI)
  • ML20092C328  + (Forwards 10CFR50.46 Updated Annual Rept for Plant.Rept Provides Notification of Change in Peak Clad Temp)
  • ML20078L415  + (Forwards 10CFR50.46 Updated Annual Rept,Including Recent Changes to ECCS Evaluation Model)
  • ML20206K708  + (Forwards 10CFR50.46(a)(3) Rept Re Significant Change in Calculated Pct.Loca Analyses for Both GE Fuel & Siemens Power Corp Fuel Demonstrates Results within All of Acceptance Criteria Set Forth in 10CFR50.46)
  • ML20045H974  + (Forwards 10CFR50.46,30-day Rept of Revs to Westinghouse ECCS Evaluation Models for June 1992 to June 1993.Cumulative Changes Since Last 30-day Rept Significant for Large Break LOCA & Requires Addl 30-day Rept)
  • HBL-93-017, Forwards 10CFR50.49 Annual Rept of Changes,Tests & Experiments for 1992  + (Forwards 10CFR50.49 Annual Rept of Changes,Tests & Experiments for 1992)
  • ML20069B071  + (Forwards 10CFR50.54 Analysis & Revised Oqa Plan Pages That Were Inadvertently Omitted from Original Submittal)
  • ML20151H121  + (Forwards 10CFR50.54 Ltr for Transmittal to Util.Ltr Revised to Reflect Discussions at Commission 811109 Meeting)
  • ML20133G265  + (Forwards 10CFR50.54(a)(3) & 10CFR50.59(b)(2) Annual Repts Re Description of Changes & Mods)
  • B17137, Forwards 10CFR50.54(f) Update for Info Requests 1 & 2 IAW Schedule Provided in NRC  + (Forwards 10CFR50.54(f) Update for Info Requests 1 & 2 IAW Schedule Provided in NRC)