Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000373/FIN-2011003-01 + (Failure to Make a Non-Emergency Event Notification to the NRC and Submit Required LER Following a Loss of Shutdown Cooling Safety Function on Unit 1)
- 05000458/FIN-2015004-04 + (Failure to Make a Notification to NRC Operations Center Regarding a Radioactive Spill Reported to Another Government Agency)
- 05000382/FIN-2013004-01 + (Failure to Make a Report Required by 10 CFR 21.21)
- 05000373/FIN-2011002-03 + (Failure to Make a Required 10 CFR 50.72 Report for an Inoperable Secondary Containment)
- 05000263/FIN-2011005-05 + (Failure to Make a Required 60 Day Event Report Per 10 CFR 50.73(a)(2)(vii)(A-D))
- 05000263/FIN-2011005-06 + (Failure to Make a Required 60 Day Event Report Per 10 CFR 50.73(a)(2)(vii)(A-D))
- 05000237/FIN-2012002-08 + (Failure to Make a Required 8 Hour Event Report Per 10 CFR 50.72(b)(3)(v)(D))
- 05000346/FIN-2010003-01 + (Failure to Make a Required 8-Hour Event Report Per 10 CFR 50.72(b)(3)(ii)(B))
- 05000416/FIN-2015004-03 + (Failure to Make a Required Eight-Hour Report for Loss of Safety Function)
- 05000346/FIN-2014004-02 + (Failure to Make a Timely 8-Hour Event Report Per 10 CFR 50.72(b)(3)(xiii))
- 05000387/FIN-2012005-06 + (Failure to Make a Timely Report for a Valid Actuation of RPS)
- 05000333/FIN-2008004-02 + (Failure to Make a Written Report of a Non-Conforming Condition Relative to an NRC-Approved Package)
- 05000331/FIN-2007005-02 + (Failure to Make an 8 Hour Notification to the NRC for Loss of Both Edgs)
- 05000282/FIN-2015002-03 + (Failure to Make an 8-Hour Report Required by 10 CFR 50.72(b)(3)(ii)(B))
- 05000282/FIN-2017002-03 + (Failure to Make an 8Hour Report Required by05000306/201700203 10 CFR 50.72(b)(3)(ii)(B))
- 05000440/FIN-2010002-02 + (Failure to Make an Accurate Immediate Operability Determination)
- 05000219/FIN-2011002-01 + (Failure to Make an Accurate lmmediate Operability Determination)
- 05000334/FIN-2013002-01 + (Failure to Manage Elevated Risk during Preventive Maintenance)
- 05000259/FIN-2013011-08 + (Failure to Manage Emergent Risk Condition during A1 and A2 RHRSW Inoperability)
- 05000282/FIN-2015008-02 + (Failure to Manage Gas Accumulation at the RHR Train Credited for Emergency Core Cooling in MODE 4)
- 05000457/FIN-2016002-02 + (Failure to Manage Gas Accumulation in the 2A SI Train)
- 05000255/FIN-2012005-02 + (Failure to Manage Non-Covered Worker Hours)
- 05000282/FIN-2015008-04 + (Failure to Manage Potential Gas Accumulation Due to SI Isolation Check Valve Leakage Following Maintenance Outages)
- 05000333/FIN-2008004-01 + (Failure to Manage Risk During Maintenance Activity Resulted in Loss of Shutdown cooling)
- 05000255/FIN-2009003-02 + (Failure to Manage Risk in Reduced Inventory)
- 05000423/FIN-2014005-02 + (Failure to Manage Risk of RSST Testing)
- 05000244/FIN-2011005-01 + (Failure to Manage Risk of Reactor Protection System Channel 2 Calibrations)
- 05000293/FIN-2010005-01 + (Failure to Manage a Yellow Risk Condition During HPCI Testing from the Alternate Shutdown Panel)
- 05000293/FIN-2014003-01 + (Failure to Manage a Yellow Risk Condition for Unavailable Torus Vent Valve)
- 05000293/FIN-2010004-01 + (Failure to Manage a Yellow Risk Condition for an Unplanned Half Scram)
- 05000373/FIN-2018003-04 + (Failure to Manage the Increase in Risk During a Battery Charger Capacity Tes)
- 05000338/FIN-2014002-01 + (Failure to Mark a Foreign Material Exclusion Closure Device Results in Non-Functionality of the Alternate AC Diesel)
- 05000373/FIN-2015001-02 + (Failure to Measure Interpass Temperature)
- 05000263/FIN-2015002-02 + (Failure to Measure Interpass Temperature)
- 05000280/LER-2077-012, Failure to Meer as Found Acceptance Criteria of Significant Number of Hydraulic Shock Suppressors + (Failure to Meer as Found Acceptance Criteria of Significant Number of Hydraulic Shock Suppressors)
- 05000306/FIN-2015004-01 + (Failure to Meet ANSI N14.6 Section 5.3.1 Requirements)
- 05000289/FIN-2008006-03 + (Failure to Meet ASME OM Code Data Collection Requirement for Comprehensive IST (Section 4OA2.a.3.c))
- 05000361/FIN-2010006-13 + (Failure to Meet Action Plan for Substantive Crosscutting Issues)
- 05000282/FIN-2014003-04 + (Failure to Meet Alternate Source Term Amendment Implementing Requirement)
- ENS 53265 + (Failure to Meet Appendix R Requirements)
- 05000483/FIN-2016002-02 + (Failure to Meet Applicable ASME Code Requirements for Repairs to Components in the Essential Service Water System)
- 05000315/FIN-2015008-05 + (Failure to Meet Applicable ISI Requirements for All CCW System Portions Within the ASME Code Class 3 Boundary)
- 05000285/FIN-2012002-03 + (Failure to Meet Design Basis Requirements for Design Basis Flood Event)
- ENS 42622 + (Failure to Meet Emergency Equipment Service Water Surveillance Requirement)
- 05000327/FIN-2012002-02 + (Failure to Meet Fire Drill Training Requirements)
- 05000220/FIN-2011005-02 + (Failure to Meet Fleet Standards for Preventive Maintenance Templates)
- 05000266/FIN-2009005-01 + (Failure to Meet GL 89-13 Program for Mussel Control)
- 05000395/FIN-2016003-01 + (Failure to Meet HRA Entry Requirements (Two Examples))
- 05000424/FIN-2016007-03 + (Failure to Meet Isolation Requirements When Incorporating Non- Class 1E Components into Class 1E electrical Circuits)
- 05000269/FIN-2002003-01 + (Failure to Meet License Basis Commitment For Staffing the SSF for a Confirmed Fire)
- 05000269/FIN-2004013-01 + (Failure to Meet Licensing Basis for Staffing the Ssf in the Event of a Confirmed Plant Fire)