Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML102350232 + (Extended Power Uprate (EPU) NRC Public Meeting)
- ML043010209 + (Extended Power Uprate (EPU) Vibration Assessment and Vulnerability Review)
- L-MT-13-109, Extended Power Uprate (Epu): Completion of EPU Commitment for Piping Meeting Code Requirements + (Extended Power Uprate (Epu): Completion of EPU Commitment for Piping Meeting Code Requirements)
- L-MT-13-092, Extended Power Uprate (Epu): Completion of EPU Commitments, Proposed License Conditions and Revised Power Ascension Test Plan + (Extended Power Uprate (Epu): Completion of EPU Commitments, Proposed License Conditions and Revised Power Ascension Test Plan)
- ML13037A200 + (Extended Power Uprate (Epu): Response to Request for Additional Information Related to Automatic Depressurization System Bypass Timer Setting)
- ML13105A188 + (Extended Power Uprate (Epu): Response to Request for Additional Information - Electrical Engineering Branch (TAC MD9990), Page 1 of 96 Through Page 57 of 96)
- L-MT-10-025, Extended Power Uprate (Epu): Response to NRC-NSPM February 25, 2010 Conference Call + (Extended Power Uprate (Epu): Response to NRC-NSPM February 25, 2010 Conference Call)
- L-MT-13-034, Extended Power Uprate (Epu): Response to Request for Additional Information - Electrical Engineering Branch (TAC MD9990), Page 58 of 96 Through End + (Extended Power Uprate (Epu): Response to Request for Additional Information - Electrical Engineering Branch (TAC MD9990), Page 58 of 96 Through End)
- ML13064A432 + (Extended Power Uprate (Epu): Second Supplement for Gap Analysis Updates)
- ML13039A201 + (Extended Power Uprate (Epu): Supplement for Gap Analysis Updates)
- L-MT-08-039, Extended Power Uprate (USNRC TAC MD8398); Acceptance Review Supplemental Information + (Extended Power Uprate (USNRC TAC MD8398); Acceptance Review Supplemental Information)
- ML083500099 + (Extended Power Uprate (USNRC TAC MD9990): Acceptance Review Supplement Regarding Steam Dryer Outer Hood Submodel Analysis)
- L-MT-08-036, Extended Power Uprate - Acceptance Review Supplement Regarding Radiological Analysis + (Extended Power Uprate - Acceptance Review Supplement Regarding Radiological Analysis)
- CNL-18-112, Extended Power Uprate - Flow Induced Vibration Summary Report + (Extended Power Uprate - Flow Induced Vibration Summary Report)
- CNL-19-074, Extended Power Uprate - Flow Induced Vibration Summary Report + (Extended Power Uprate - Flow Induced Vibration Summary Report)
- BVY 06-080, Extended Power Uprate - License Amendment No. 229 Clarifications to NRCs Final Safety Evaluation + (Extended Power Uprate - License Amendment No. 229 Clarifications to NRCs Final Safety Evaluation)
- ML083400402 + (Extended Power Uprate - Monticello - Request to Supplement the Application in the Probabilistic Risk Assessment Area)
- ML021370484 + (Extended Power Uprate - Presentation to the Advisory Committee on Reactor Safeguards)
- BVY 06-019, Extended Power Uprate - Regulatory Commitment Information Regarding Steam Dryer Monitoring and FIV Effects + (Extended Power Uprate - Regulatory Commitment Information Regarding Steam Dryer Monitoring and FIV Effects)
- CNL-19-006, Extended Power Uprate - Replacement Steam Dryer Final Load Definition and Stress Reports - Supplemental Information + (Extended Power Uprate - Replacement Steam Dryer Final Load Definition and Stress Reports - Supplemental Information)
- CNL-18-124, Extended Power Uprate - Replacement Steam Dryer Final Load Definition and Stress Reports + (Extended Power Uprate - Replacement Steam Dryer Final Load Definition and Stress Reports)
- CNL-19-042, Extended Power Uprate - Replacement Steam Dryer Final Load Definition and Stress Report + (Extended Power Uprate - Replacement Steam Dryer Final Load Definition and Stress Report)
- CNL-18-141, Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report - Supplemental Information + (Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report - Supplemental Information)
- CNL-18-125, Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report + (Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report)
- CNL-18-134, Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report + (Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report)
- CNL-19-041, Extended Power Uprate - Unit 1 Flow Induced Vibration Summary Report + (Extended Power Uprate - Unit 1 Flow Induced Vibration Summary Report)
- CNL-19-075, Extended Power Uprate - Unit 2 Replacement Steam Dryer Final Load Definition and Stress Report + (Extended Power Uprate - Unit 2 Replacement Steam Dryer Final Load Definition and Stress Report)
- CNL-19-117, Extended Power Uprate - Units 1 and 2 Replacement Steam Dryer Final Load Definition and Stress Reports - Supplemental Information + (Extended Power Uprate - Units 1 and 2 Replacement Steam Dryer Final Load Definition and Stress Reports - Supplemental Information)
- ML040690962 + (Extended Power Uprate Acceptance Review)
- ML063250092 + (Extended Power Uprate Acceptance Review)
- ML040500302 + (Extended Power Uprate Acceptance Review)
- ML033180088 + (Extended Power Uprate Acceptance Review)
- ML083400366 + (Extended Power Uprate Acceptance Review Questions on Probabilistic Risk Assessment Issues)
- ML052310433 + (Extended Power Uprate Acceptance Review Results)
- ML062900322 + (Extended Power Uprate Accpetance Review Results)
- ML061430155 + (Extended Power Uprate Application)
- PLA-6195, Extended Power Uprate Application Electrical Engineering Technical Review Request for Additional Information Responses + (Extended Power Uprate Application Electrical Engineering Technical Review Request for Additional Information Responses)
- PLA-6245, Extended Power Uprate Application Materials and Chemical Engineering Technical Review Request for Additional Information Responses, PLA-6245 + (Extended Power Uprate Application Materials and Chemical Engineering Technical Review Request for Additional Information Responses, PLA-6245)
- PLA-6212, Extended Power Uprate Application Materials and Chemical Engineering Technical Review Request for Additional Information Responses + (Extended Power Uprate Application Materials and Chemical Engineering Technical Review Request for Additional Information Responses)
- PLA-6210, Extended Power Uprate Application Vessels and Internals Integrity Technical Review Request for Additional Information Responses + (Extended Power Uprate Application Vessels and Internals Integrity Technical Review Request for Additional Information Responses)
- ML062900306 + (Extended Power Uprate Attachment 8 to EPU NRC Submittal, Startup Testing)
- ML070990413 + (Extended Power Uprate Cooling Tower Evaporative Loss Study for Vermont Yankee Nuclear Power Station, Revision 1)
- BSEP 03-0071, Extended Power Uprate Cycle 16 Startup Test Report - Implementation Test Report - Phase 1 + (Extended Power Uprate Cycle 16 Startup Test Report - Implementation Test Report - Phase 1)
- L-2013-088, Extended Power Uprate Cycle 20 Startup Report + (Extended Power Uprate Cycle 20 Startup Report)
- L-2012-382, Extended Power Uprate Cycle 24 Startup Report + (Extended Power Uprate Cycle 24 Startup Report)
- L-2013-165, Extended Power Uprate Cycle 24 Startup Report, Revision 1 + (Extended Power Uprate Cycle 24 Startup Report, Revision 1)
- L-2012-426, Extended Power Uprate Cycle 26 Startup Report + (Extended Power Uprate Cycle 26 Startup Report)
- L-2013-180, Extended Power Uprate Cycle 26 Startup Report - Supplement 2 + (Extended Power Uprate Cycle 26 Startup Report - Supplement 2)
- L-2013-226, Extended Power Uprate Cycle 26 Startup Report - Supplement 3 + (Extended Power Uprate Cycle 26 Startup Report - Supplement 3)
- L-2013-073, Extended Power Uprate Cycle 26 Startup Report, Supplement 1 + (Extended Power Uprate Cycle 26 Startup Report, Supplement 1)
- L-2013-227, Extended Power Uprate Cycle 27 Startup Report-Supplement 1 + (Extended Power Uprate Cycle 27 Startup Report-Supplement 1)