Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NRC-13-0023, DTE Electric Companys Response to March 12, 2012 Information Request Regarding Seismic Hazard Evaluation + (DTE Electric Companys Response to March 12, 2012 Information Request Regarding Seismic Hazard Evaluation)
- NRC-13-0034, DTE Electric Companys Response to NRC Request for Information Regarding the Capability to Perform Offsite Dose Assessment During an Event Involving Multiple Release Sources + (DTE Electric Companys Response to NRC Request for Information Regarding the Capability to Perform Offsite Dose Assessment During an Event Involving Multiple Release Sources)
- NRC-14-0002, DTE Electric Companys Second Six Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (DTE Electric Companys Second Six Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049))
- NRC-15-0070, DTE Electric Companys Second Six-Month Status Report in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number E + (DTE Electric Companys Second Six-Month Status Report in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-1)
- NRC-14-0017, DTE Electric Companys Seismic Hazard and Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accide + (DTE Electric Companys Seismic Hazard and Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident)
- NRC-17-0043, DTE Electric Companys Sixth Six-Month Status Report for Implementation of Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions + (DTE Electric Companys Sixth Six-Month Status Report for Implementation of Order EA-13-109, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions)
- NRC-13-0009, DTE Electric Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (DTE Electric Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049))
- NRC-13-0008, DTE Electric Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Containment Hardened Vents (Order Number EA-12-050) + (DTE Electric Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Containment Hardened Vents (Order Number EA-12-050))
- NRC-13-0005, DTE Electric Response to March 12, 2012 Information Request Regarding Flooding Integrated Assessment Approach + (DTE Electric Response to March 12, 2012 Information Request Regarding Flooding Integrated Assessment Approach)
- NRC-13-0013, DTE Electric Submittal of Flooding Hazard Reevaluation Report in Response to March 12, 2012 Information Request Regarding Flood Protection Evaluations + (DTE Electric Submittal of Flooding Hazard Reevaluation Report in Response to March 12, 2012 Information Request Regarding Flood Protection Evaluations)
- NRC-16-0070, DTE Energy - Fermi 2, Flooding Mitigating Strategies Assessment Report + (DTE Energy - Fermi 2, Flooding Mitigating Strategies Assessment Report)
- NRC-12-0073, DTE Energy - Plans for Restoration of the South Reactor Feedpump + (DTE Energy - Plans for Restoration of the South Reactor Feedpump)
- NRC-08-0070, DTE Energy - Supplemental Information for Decommissioning Funding Status Report for Fermi 1 + (DTE Energy - Supplemental Information for Decommissioning Funding Status Report for Fermi 1)
- NRC-06-0061, DTE Energy - Waste Shipments Not Received within Twenty Days + (DTE Energy - Waste Shipments Not Received within Twenty Days)
- NRC-97-0055, DTE Energy 1996 Annual Rept + (DTE Energy 1996 Annual Rept)
- ML21220A018 + (DTE Energy 21-02335-09 - Notice of License Expiration)
- ML072050487 + (DTE Energy Announces New Director, Nuclear Assessment, at Fermi 2)
- ML071410089 + (DTE Energy Announces New Site Vice President at Fermi 2)
- NRC-19-0054, DTE Energy Company - License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle + (DTE Energy Company - License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle)
- NRC-18-0018, DTE Energy Company - Property Insurance Coverage + (DTE Energy Company - Property Insurance Coverage)
- NRC-18-0001, DTE Energy Company - Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification Section 3.7.2 + (DTE Energy Company - Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification Section 3.7.2)
- NRC-20-0009, DTE Energy Company Transmittal of Revision to the Pressure and Temperature Limits Report (PTLR) + (DTE Energy Company Transmittal of Revision to the Pressure and Temperature Limits Report (PTLR))
- NRC-19-0085, DTE Energy Company Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 20 + (DTE Energy Company Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 20)
- NRC-02-0032, DTE Energy Corp., Consolidated Statement of Operations + (DTE Energy Corp., Consolidated Statement of Operations)
- ML18177A208 + (DTE Energy Meeting Slides for June 27, 2018 Public Meeting)
- EPID:L-2018-LRM-0031 + (DTE Energy Meeting Slides for June 27, 2018 Public Meeting)
- NRC-09-0071, DTE Energy Waste Shipment Not Received within Twenty Days + (DTE Energy Waste Shipment Not Received within Twenty Days)
- ML093090604 + (DTE Energy Waste Shipment Not Received within Twenty Days)
- ML22026A023 + (DTE Energy, Notice of License Expiration, 21-02335-06)
- ML18338A178 + (DTE Facility Clearance Reporting Requirements Related to Foreign Ownership, Control or Influence Letter)
- ML083220260 + (DTE Fermi 1 License Termination Plan Handout)
- ML15121A863 + (DTE Initial Disclosures)
- ML20094L102 + (DTE Notices of Appearance for Jon P. Christinidis, Timothy P. Matthews, Ryan K. Lighty, and Scott D. Clausen)
- ML17038A343 + (DTE Presentation for February 09, 2017 Meeting)
- ML15355A464 + (DTE Response to Beyond Nuclear Hearing Request and Motion to Reopen)
- ML17059D766 + (DTE Response to Craft Petition for Review of LBP-17-01)
- NRC-16-0061, DTE Response to NRC Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools + (DTE Response to NRC Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools)
- NRC-15-0002, DTE Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 9 + (DTE Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 9)
- NRC-15-0004, DTE Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 14 + (DTE Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 14)
- NRC-15-0008, DTE Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 13 + (DTE Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 13)
- ML15244B282 + (DTE September 2015 Disclosure Supplement)
- ML15182A038 + (DTE Supplemental Disclosures July 2015)
- ML15050A673 + (DTE000021 - Excerpts from Draft NUREG-1437, Supplement 53, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 53 Regarding Sequoyah Nuclear Plant, Units 1 and 2 (ADAMS Accession No. ML14211A454))
- CNS-14-038, DUKCORP042-PR-001, Seismic Hazard & Screening Report in Response to the 50.54(f) Information Request Re Fukishima Near-Term Task Force Recommendation 2.1 Seismic + (DUKCORP042-PR-001, Seismic Hazard & Screening Report in Response to the 50.54(f) Information Request Re Fukishima Near-Term Task Force Recommendation 2.1 Seismic)
- ML16257A411 + (DUKE-0B21-1104-000(NP), Safety Analysis Report for Brunswick Steam Electric Plant, Units 1 and 2, Maximum Extended Load Line Limit Analysis Plus)
- ML19298B826 + (DUWP Letter-Information on Additional Protocol Forms to Licensees and Manufactures to Assist in Meeting the IAEA Treaty Obligations)
- ML20318A353 + (DUWP Letter-Information on Additional Protocol Forms to Licensees and Manufactures to Assist in Meeting the IAEA Treaty Obligations)
- ML15090A588 + (DUWP Operating Procedure for Project Management of Sites Under the Nrc/Dod Memorandum of Understanding)
- ML15090A583 + (DUWP Operating Procedure for Project Management of Sites Under the Nrc/Dod Memorandum of Understanding)
- ML24197A219 + (DUWP-ISG-02 Final)
- ML14080A193 + (DWP-10, Rev. 1, Performance of Final Status Survey)
- ML19253C789 + (DYNEST1:Revised Dynamic Estimator Calculation Program)