Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-18-094, Core Operatinq Limits Report, Cycle 21, Revision 0 + (Core Operatinq Limits Report, Cycle 21, Revision 0)
- ML020810392 + (Core Operation Limits Report Cycle 5 Revision 0)
- ML18302A122 + (Core Operation Limits Report, Surry 2 Cycle 29 Pattern Sup, Revision 0)
- ML19275H341 + (Core Performance Branch Input to First Round Questions)
- ML19242A303 + (Core Performance Branch Topical Rept Evaluation BWR/6 Fuel Assembly Evaluation of Combined SSE & LOCA Loadings. Analytical Methods Described in Rept Acceptable.Evaluation Included in NEDO-21175-P & NEDO-21175)
- ML20008F586 + (Core Physics Validation for Combustion Engineering PWR, Presented at ANS Winter Meeting on 791112-16 in San Francisco,Ca)
- ML20262E776 + (Core Plate)
- ML120760152 + (Core Plate Hold Down Bolt Inspection Plan and Analysis - Vermont Yankee Nuclear Power Station)
- ML110840068 + (Core Plate Hold Down Bolt Inspection Plan Analysis)
- JAFP-13-0126, Core Plate Rim Hold Down Bolting, Plant Specific Analysis and Inspection Plan Revision, License Renewal Commitment 23 + (Core Plate Rim Hold Down Bolting, Plant Specific Analysis and Inspection Plan Revision, License Renewal Commitment 23)
- JAFP-12-0122, Core Plate Rim Hold Down Bolting, Plant Specific Analysis and Inspection Plan, License Renewal Commitment 23 + (Core Plate Rim Hold Down Bolting, Plant Specific Analysis and Inspection Plan, License Renewal Commitment 23)
- ML20153B191 + (Core Plate Wedge Installation)
- GO2-21-093, Core Plate Wedge Installation Report Required by License Condition 2.C.(36) + (Core Plate Wedge Installation Report Required by License Condition 2.C.(36))
- ML20116N864 + (Core Power Uprating S&W Balance-of-Plant Summary)
- ML20071E715 + (Core Protection Calculation & Control Element Assembly Calculator Data Base Document. Proprietary Info Deleted)
- ML20071E708 + (Core Protection Calculation & Control Element Assembly Calculator Sys Phase II Software Verification Test Rept. Proprietary Info Deleted)
- ML20071E700 + (Core Protection Calculation & Control Element Assembly Calculator Sys Phase I Software Verification Test Rept. Proprietary Info Deleted)
- ML20262J232 + (Core Protection Calculator 1 Schematic)
- ML20262J236 + (Core Protection Calculator 2 Schematic (Aw 15))
- ML20262J282 + (Core Protection Calculator 2 Schematic AW15. Sheet 2 of 2)
- 05000368/LER-1980-088-03, Core Protection Calculator a & Control Element Assembly Calculator 1 Failed. Caused by Voltage Transient on 2Y11 & 2Y13.Sigma Indicator 2FI-8229-1 Replaced W/More Reliable Model + (Core Protection Calculator a & Control Element Assembly Calculator 1 Failed. Caused by Voltage Transient on 2Y11 & 2Y13.Sigma Indicator 2FI-8229-1 Replaced W/More Reliable Model)
- ML17212A217 + (Core Protection:Calculator No 1,Schematic. Revision Date Illegible)
- ML19318B398 + (Core Reflood Dynamics Code - FLOOD4, Interim Rept)
- ML20112F693 + (Core Region Matls Info (Units 1,2 & 3))
- ML17059B493 + (Core Shroud Cracking Evaluation)
- Information Notice 1993-79, Core Shroud Cracking at Beltline Region Welds in Boiling-Water Reactors + (Core Shroud Cracking at Beltline Region Welds in Boiling-Water Reactors)
- ML20082Q876 + (Core Shroud Flaw Evaluation)
- ML20205A145 + (Core Shroud Insp Plan)
- ML20199A929 + (Core Shroud Insp Plan Unit 1 B112R1 Outage April 1998)
- ML20148L761 + (Core Shroud Insp Plan Unit 2 B213R1 Outage,Sept 1997)
- ML20238F667 + (Core Shroud Insp Plan Unit 2 B214R1 Outage Apr 1999)
- U-603558, Core Shroud Inspection Results + (Core Shroud Inspection Results)
- ML021710158 + (Core Shroud Inspection Results)
- ML20262F270 + (Core Shroud Layout Outside View Inspection Mapping for IVVI)
- ML20078P673 + (Core Shroud Reinsp Plan Unit 1 B110R1 Outage,Apr 1995)
- ML20094E086 + (Core Shroud Reinspection Plan Unit 2 B2121R1 Outage for Feb 1996)
- ML20115C690 + (Core Shroud Reinspection Plan for Unit 1 B111R1 Outage Oct 1996)
- ML20083K932 + (Core Shroud Repair,Design Reliant Structures Insp Requirements & Acceptance Criteria)
- NL-08-0350, Core Shroud Stabilizer Assembly Update + (Core Shroud Stabilizer Assembly Update)
- ML20265B315 + (Core Spray)
- 05000219/FIN-2010003-04 + (Core Spray ASME Code Compliance Issues)
- ML20063E048 + (Core Spray Crack Analysis at Brunswick Steam Electric Plant,Unit 2)
- ML20046C385 + (Core Spray Crack Analysis for Bsep,Unit 1)
- ML20059L139 + (Core Spray Crack Analysis for Peach Bottom Unit 3)
- 05000354/LER-2002-007, Core Spray Discharge Line Alarms Inoperable + (Core Spray Discharge Line Alarms Inoperable)
- 05000265/LER-2005-001 + (Core Spray Discharge Pressure Switch Out of Calibration Due to Apparent Manufacturing Defect)
- ML043350009 + (Core Spray Flaw Evaluation)
- ML20101P098 + (Core Spray Flaw Evaluation Rept)
- 05000333/LER-1980-006-03, Core Spray Injection Valve 14-MOV-12A Improperly Operated During 791221 Surveillance Test.Caused by Misoperation of Valve Circuit Breaker Overload Trip Device + (Core Spray Injection Valve 14-MOV-12A Improperly Operated During 791221 Surveillance Test.Caused by Misoperation of Valve Circuit Breaker Overload Trip Device)
- 05000237/LER-1983-020-03, Core Spray Injection Valve Mo 1402-25B Remained Open When Close Signal Given. Caused by Breaker Incorrectly Set Due to Procedure Inadequacy.Breaker Reset + (Core Spray Injection Valve Mo 1402-25B Remained Open When Close Signal Given. Caused by Breaker Incorrectly Set Due to Procedure Inadequacy.Breaker Reset)
- 05000387/LER-2017-008, Core Spray Inoperable Due to Not Meeting Seismic Requirements as a Result of a Human Performance Error + (Core Spray Inoperable Due to Not Meeting Seismic Requirements as a Result of a Human Performance Error)