Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20080G417 + (Answers to W Eddleman Interrogatories Re Eddleman Contention 15-AA.BM Williams Affidavit Encl)
- ML22159A267 + (Answers to Your Questions on Palisades)
- ML092020020 + (Answers to the Questions Raised by the Oecd/Nea/Csni Senior Group of Experts on Nuclear Safety Research Facilities and Programs on Puma)
- ML19257C425 + (Answers,Set 1,to CA Energy Commission Second Set of Interrogatories.Includes Info Re Feedwater Transients,Most Severe Over Cooling Events & Atypical Welding Matls Used in Reactor Pressure Vessel.Affidavit Encl)
- ML19290C510 + (Answers,Set 1,to Friends of the Earth First Set of Interrogatories.Provides Status of Commitments Re TMI-2 Lessons Learned Task Force short-term Recommendations. Includes Info on Technical Issues)
- ML19257C429 + (Answers,Set 2,to CA Energy Commission Second Set of Interrogatories.Contains Info Re Feedwater Transients Reactor Trip,Most Severe Overcooling Events & Mgt of Technical Personnel.Affidavit Encl)
- ML19290C512 + (Answers,Set 2,to Friends of the Earth First Set of Interrogatories.Assesses Personnel Status Re Licensed & Nonlicensed Operators)
- ML19257C430 + (Answers,Set 3,to CA Energy Commission Second Set of Interrogatories.Contains Info Re Transients That May Result in Reactor Coolant Pressure Reduction & Transients That May Result in Turning Off Main Coolant Pumps.Affidavit Encl)
- ML23138A151 + (Ansys Inspection Vendor Announcement Letter)
- ML23285A168 + (Ansys, Inc. Reply to Nuclear Regulatory Commission September 7, 2023, Notice of Violation and Notice of Nonconformance)
- ML21050A148 + (Antaki - Update of DOE EH-0545 Rules for Seismic Adequacy of Piping Systems)
- ML20280A430 + (Antaki - Update of DOE-EH-0545)
- ML25219A163 + (Antares Nuclear, Inc., Assignment of Project Number and Explanation of Billing and Fees)
- ML19037A402 + (Antero Veolia Clearwater Facility & Landfill, Annual Registration of Generally Licensed Devices, GL-728077-24)
- ML071340325 + (Anthony Alexander Ltr. Order Demand for Information (DFI))
- ML12080A235 + (Anthony Z. Roisman, Non-Disclosure Agreement and Acknowledgment)
- ML20099M015 + (Anthony/Friends of the Earth Motion in Opposition to Util Motion for Exemption from 10CFR50.47 Provisions for Emergency & Evacuation Planning for Graterford Prisoners & Staff.Schedule of Discovery & Hearings Should Be Set Up)
- ML13008A321 + (Anti-Rotation Pin Failure in Anchor Darling (Flowserve) Double Disc Gate Valve)
- ML22080A047 + (Anticipated Impacts of Nuclear Accidents, Presentation for 2022 Society for Benefit-Cost Analysis Annual Conference, 3-22-2022)
- ML20055A674 + (Anticipated Key Event Summary:Columbiana County Emergency Response Drill, to Be Exercised 820714)
- ML11306A011 + (Anticipated License Amendment Requests)
- ML11252A530 + (Anticipated License Amendment Requests)
- ENS 45865 + (Anticipated Loss of Radioactive Material)
- ML052640196 + (Anticipated Stock Conversion within Midamerican Energy Company)
- ML20072A735 + (Anticipated Transient W/O Trip, Rev 0)
- RIS 2005-29, Anticipated Transients Developing Into More Serious Events + (Anticipated Transients Developing Into More Serious Events)
- ML20062D393 + (Anticipated Transients W/Multiple Failures,Test Series L6-7/L9-2, Interim Rept)
- ML19210B154 + (Anticipates 750709 File Date for Evaluation Required by Paragraph 1 of Order for Mod,In Response to 741227 Request)
- ML20211G583 + (Anticipates Completion of Steam Generator Analysis & App R Modeling Reanalysis Work by Feb 1987,per 860918 Telcon W/Nrc Re Steam Generator Cool Down Studies for App R)
- ML19347A705 + (Anticipates Delay in Issuance of NRC Safety Evaluation Due to Commission Approval of 10CFR72 for Which Addl Info & Review Are Required.Firm Issuance Date Will Be Provided When Established)
- ML20198F900 + (Anticipates Final Licensing Action Associated W/Review to Be Completed by End of Jan 1998,in Response to Requesting Timely Approval of General Atomics Site Decommissioning Plan)
- ML19289C848 + (Anticipates Need for Addl Info Re Seismic Design Bases to Compare Current Criteria as Part of Systematic Evaluation Program.Expects to Focus on Significance of Newer Seismic Design Techniques)
- ML19289C858 + (Anticipates Need for Addl Info Re Seismic Design Bases to Compare Current Criteria as Part of Systematic Evaluation Program.Expects to Focus on Significance of Newer Seismic Design Techniques)
- ML19289C852 + (Anticipates Need for Addl Info Re Seismic Design Bases to Compare Current Criteria as Part of Systematic Evaluation Program.Expects to Focus on Significance of Newer Seismic Design Techniques)
- ML19289C849 + (Anticipates Need for Addl Info Re Seismic Design Bases to Compare Current Criteria as Part of Systematic Evaluation Program.Expects to Focus on Significance of Newer Seismic Design Techniques)
- ML19289C856 + (Anticipates Need for Addl Info Re Seismic Design Bases to Compare Current Criteria as Part of Systematic Evaluation Program.Expects to Focus on Significance of Newer Seismic Design Techniques)
- ML17244A338 + (Anticipates Need for Addl Info Re Seismic Design Bases to Compare Current Criteria as Part of Systematic Evaluation Program.Expects to Focus on Significance of Newer Seismic Design Techniques)
- ML19263B923 + (Anticipates Purchase & Installation of Pulsation Dampeners, Pending Mgt Approval.Completion of Mods Scheduled for Unit 1 During Spring 1980 Refueling Outage & Unit 2 During Fall 1980 Refueling Outage)
- ML19318A861 + (Anticipates Response to IE Bulletin 80-05 Re Vacuum Condition Resulting in Damage to Holdup Tanks Will Be Submitted by 800731.Util Did Not Receive Bulletin Until 800606)
- ML20247Q942 + (Anticipates That AEOD Will Be Taking Lead to Coordinate Remaining NRC Emergency Exercises W/Chairman Schedule)
- ML17303A376 + (Anticipates That Addl Amends Will Be Added to Lease Transactions,Including Chase Aug Facility Lease & Mfs Facility Lease.Chase Aug Facility Amended to Conform Corresponding Provision of Chase Dec Facility Leases)
- ML19309G662 + (Anticipates That Eia Will Be Completed by 800530,contrary to NRC Statement at 800229 Prehearing Conference Indicating Completion by 800430)
- ML20066D325 + (Anticipates That Final Response Will Be Submitted in Early 1992 Re Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment)
- ML19263B438 + (Anticipates That Ny Dept of Public Svc Staff Will Recommend Rejection of the Cementon Site in Favor of an Alternate on Land Use,Socioeconomic,& Aesthetic Grounds)
- ML19263B439 + (Anticipates That Ny Dept of Public Svc Staff Will Recommend Rejection of the Cementon Site in Favor of an Alternate on Land Use,Socioeconomic,& Aesthetic Grounds)
- ENS 48123 + (Anticipatory Loss of Spds and Erds Due to Possible Loss of Integrated Plant Computer System During Troubleshooting)
- ML20260J143 + (Anticipatory Reactor Trip System (Arts):External Connection. Sheet 1 of 1)
- ML20260J139 + (Anticipatory Reactor Trip System (Arts):General Arrangement. Sheet 2 of 2)
- 05000346/LER-2019-003, Anticipatory Reactor Trip System Actuated During Turbine Stop Valve Testing Due to the Closure of a Main Turbine Stop Valve + (Anticipatory Reactor Trip System Actuated During Turbine Stop Valve Testing Due to the Closure of a Main Turbine Stop Valve)
- ML20263J088 + (Anticipatory Reactor Trip System Instrument Installation. Sheet 1 of 2)
- ML20263G677 + (Anticipatory Reactor Trip System Logic Diagram)