Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "4 to the Offsite Dose Calculation Manual (OCDM)". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML21168A164  + (4 to Updated Safety Analysis Report, EQSD-II, Rev 32, EQ Master List Change Notice)
  • ML21168A158  + (4 to Updated Safety Analysis Report, EQSD-I, Rev 14, Equipment Qualification Design Basis Document)
  • ML16168A342  + (4 to Updated Safety Analysis Report, List of Effective Pages and Table of Contents)
  • ML21168A120  + (4 to Updated Safety Analysis Report, List of Effective Pages (Loep))
  • ML21168A141  + (4 to Updated Safety Analysis Report, M-6630-00017A, W08 B7 to B13, Fire Protection Evaluation for Penetrant Size Exceeding Typical Detail FB-1 Limitation)
  • ML21168A138  + (4 to Updated Safety Analysis Report, M-6630-00017A, W08 1 to B6, Redacted, Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configurations)
  • ML21168A140  + (4 to Updated Safety Analysis Report, M-6630-00017A, W08 G3D to H, Structural Steel Fire Proofing Data)
  • ML21168A139  + (4 to Updated Safety Analysis Report, M-6630-00017A, Rev. W08, C to G3C, Fire Protection Evaluation for Unique or Unbounded Fire Wrap Configurations)
  • ML16168A349  + (4 to Updated Safety Analysis Report, Section 7, Plant Instrumentation and Control Systems)
  • ML16278A043  + (4 to Updated Safety Analysis Report, Section 1, Introduction and Summary Description Public Version)
  • ML16168A358  + (4 to Updated Safety Analysis Report, Section 11, Plant Power Conversion System)
  • ML16168A348  + (4 to Updated Safety Analysis Report, Section 6, Engineered Safety Features)
  • ML16168A361  + (4 to Updated Safety Analysis Report, Section 12, Plant Structures and Shielding)
  • ML16168A351  + (4 to Updated Safety Analysis Report, Section 9, Plant Radioactive Waste Control Systems)
  • ML16168A352  + (4 to Updated Safety Analysis Report, Section 10, Plant Auxiliary Systems)
  • ML16168A362  + (4 to Updated Safety Analysis Report, Section 13, Plant Operations)
  • ML16168A363  + (4 to Updated Safety Analysis Report, Section 14, Safety Analysis)
  • ML16168A344  + (4 to Updated Safety Analysis Report, Section 2, Site and Environs)
  • ML16168A345  + (4 to Updated Safety Analysis Report, Section 3, Reactor)
  • ML16168A346  + (4 to Updated Safety Analysis Report, Section 4, Reactor Coolant System)
  • ML16168A347  + (4 to Updated Safety Analysis Report, Section 5, Containment System)
  • ML16168A350  + (4 to Updated Safety Analysis Report, Section 8, Plant Electrical Systems)
  • ML21168A160  + (4 to Updated Safety Analysis Report, Wcqpm, Rev. 11, Wolf Creek Quality Program Manual)
  • ML030910480  + (4 to Wolf Creek Physical Security Plan, Safeguards Contingency Plan, & Security Training & Qualification Plan)
  • ML032340681  + (4 to the Duke Power Company Nuclear Security and Contingency Plan)
  • RC-16-0003, 4 to the Physical Security Plan  + (4 to the Physical Security Plan)
  • L-2011-139, 4 to the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan  + (4 to the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan)
  • PLA-7458, 4 to the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and ISFSI Security Program  + (4 to the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and ISFSI Security Program)
  • ML033510294  + (4 to the Table of Contents, Revision 11 to EP-IP-200, Revision 4 to EP-IP-201, and Revision 4 to EP-IP-202)
  • ML020930171  + (4 to the Training and Qualification Plan)
  • ML22326A121  + (4 to the Updated Final Safety Analysis Report, Chapter 15 (Part 2 of 2), Chapter 16, Chapter 17, Chapter 18, Chapter 19, Table of Contents, Rev 24 Epl)
  • ML22326A063  + (4 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 3 of 7))
  • ML22326A059  + (4 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 2 of 7))
  • ML22326A064  + (4 to the Updated Final Safety Analysis Report, Chapter 2, Site Characteristics (Part 2 of 2) and Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 1 of 7))
  • ML22326A060  + (4 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 4 of 7))
  • ML22326A114  + (4 to the Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System (Part 2 of 2); Chapter 11, Chapter 12, Chapter 13, Chapter 14, and Chapter 15 (Part 1 of 2))
  • ML22326A062  + (4 to the Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant and Chapter 2, Site Characteristics (Part 1 of 2))
  • ML22326A113  + (4 to the Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls (Part 2 of 2), and Chapter 8, Electric Power (Part 1 of 3))
  • ML22326A119  + (4 to the Updated Final Safety Analysis Report, Chapter 8, Electric Power (Part 2 of 3))
  • ML22326A065  + (4 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 7 of 7) and Chapter 4, Reactor (Part 1 of 2))
  • ML22326A067  + (4 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 5 of 7))
  • ML22326A107  + (4 to the Updated Final Safety Analysis Report, Chapter 4, Reactor (Part 2 of 2); Chapter 5, Reactor Coolant System and Connected Systems; and Chapter 6, Engineered Safety Features (Part 1 of 3))
  • NL-22-0810, 4 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, 10 CFR 50.59 Summary Report and Revised NRC Commitments Report  + (4 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, 10 CFR 50.59 Summary Report and Revised NRC Commitments Report)
  • ML22326A066  + (4 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (Part 6 of 7))
  • ML22326A120  + (4 to the Updated Final Safety Analysis Report, Chapter 8, Electric Power (Part 3 of 3); Chapter 9, Auxiliary Systems; and Chapter 10, Steam and Power Conversion System (Part 1 of 2))
  • ML22326A117  + (4 to the Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (Part 2 of 3))
  • ML22326A116  + (4 to the Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (Part 3 of 3) and Chapter 7, Instrumentation and Controls (Part 1 of 2))
  • ML043510246  + (4 to the Yankee Nuclear Power Station Security Plan (TAC No. L52644))
  • ML13043A212  + (4, RAIs Cover Letter 2-12-13)
  • ML21168A110  + (4, Response to Request for Additional Information (RAI))