Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML032380569 +
- ML20063A050 +
- ML20082N974 +
- ML20070R769 +
- ML090570554 +
- L-16-327, Technical Basis for Optimization or Elimination of Liquid Penetrant Exams for the Embedded Flaw Repair +
- ML083250292 +
- RS-14-251, Revision to the Third 10-Year Inservice Inspection Interval Requests for Relief for Alternative Requirements for the Repair of Reactor Vessel Head Penetrations +
- ML111010044 +
- RS-11-063, Regarding Supplement to Inservice Inspection Relief Request 13R-19: Alternative Requirements for the Repair of Reactor Vessel Head Penetrations +
- AEP-NRC-2020-71, Indiana Michigan Power Co., Supplement to Request for Relief Related to American Society of Mechanical Engineers (Asme)Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-04 +
- IR 05000424/2020003 +
- IR 05000334/2021002 +
- ML20215K647 +
- DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies +
- DCL-13-063, Inservice Inspection Report for Seventeenth Refueling Outage +
- RS-11-064, Revised Response to a Request for Additional Information Related to Inservice Inspection Relief Request I3R-19: Alternative Requirements for the Repair of Reactor Vessel Head Penetrations +
- DCL-11-093, Inservice Inspection Report for Sixteenth Refueling Outage +
- DCL-08-058, Transmittal of Inservice Inspection Report, Fourteenth Refueling Outage +
- BYRON 2007-0055, B2R13, Spring 2007 Outage, Inservice Inspection Summary Report, for Inspection Activities from October 12, 2005 to May 3, 2007, Section 5.0 (Continued) Form NIS-2: Repairs/Modifications Through End +
- ML11116A185 +
- ML030020565 +
- 05000334/LER-1982-006-03, Reactor Coolant Pump Cooling Water Return Containment Isolation Trip Valve (TV-CC-105D1) Did Not Hold Test Pressure.Cause Not Stated. Corrective Maint Performed.Valves Retested +