Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 10 CFR 51.117, Draft Environmental Impact Statement--Notice of Availability + (Draft environmental impact statement--notice of availability)
- 10 CFR 51.85, Draft Environmental Impact Statement--Rulemaking + (Draft Environmental Impact Statements--Rulemaking)
- 10 CFR 51.75, Draft Environmental Impact Statement-Construction Permit, Early Site Permit, Or Combined License + (Draft Environmental Impact Statements-Production and Utilization Facilities)
- 10 CFR 51.71, Draft Environmental Impact Statement-Contents + (Draft environmental impact statement-contents)
- 10 CFR 51.70, Draft Environmental Impact Statement-General + (Environmental Impact Statements)
- 10 CFR 51.76, Draft Environmental Impact Statement-Limited Work Authorization + (Draft environmental impact statement-limited work authorization)
- 10 CFR 51.80, Draft Environmental Impact Statement-Materials License + (Draft Environmental Impact Statements-Materials Licenses)
- 10 CFR 51.33, Draft Finding of No Significant Impact; Distribution + (Draft finding of no significant impact; distribution)
- Dresden + (Dresden)
- EPID:L-2020-LLR-0014 + (Dresden Nuclear Power Station, Nine Mile Point Nuclear Station, Peach Bottom Atomic Power Station, & Quad Cities Nuclear Power Station - Proposed Alternative to Extend Reactor Pressure Vessel Safety Relief Valve Testing Frequency)
- 10 CFR 26.31, Drug and Alcohol Testing + (Drug and alcohol testing)
- 10 CFR 26.405, Drug and Alcohol Testing + (Drug and alcohol testing)
- EPID:L-2022-LLA-0086 + (Dtra Incoming Request for Amendment to Change RSO Name)
- EPID:L-2020-LLA-0236 + (Duane Arn1old, License Amendment Request (TSCR-188): Proposed Change to the Physical Security Plan for the Post-Shutdown and Permanently Defueled Condition)
- Duane Arnold + (Duane Arnold)
- Duane Hardesty + (Duane Hardesty)
- Duane White + (Duane White)
- Duc Nguyen + (Duc Nguyen)
- EPID:L-2020-LLR-0125 + (Duke Energy - Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI)
- EPID:L-2020-LLR-0156 + (Duke Energy Carolinas, LLC - Relief Request for Alternative for Reactor Vessel Closure Stud Examinations)
- EPID:L-2020-LLR-0126 + (Duke Energy Carolinas, LLC - Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI in Accordance with 10 CFR 50.55a(g)(4)(iv))
- EPID:L-2020-LLR-0124 + (Duke Energy Corp. - Request to Use Provision of Later Edition and Addenda of ASME Boiler and Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)(iv))
- Duncan White + (Duncan White)
- Dunesia Clark + (Dunesia Clark)
- Dungeness + (Dungeness)
- NRC Generic Letter 78-42, Duplicate of GL-78-40 + (Duplicate of GL-78-40)
- 10 CFR 9.35, Duplication Fees + (Duplication fees)
- 10 CFR 52.55, Duration of Certification + (Duration of certification)
- 10 CFR 52.104, Duration of Combined License + (Duration of combined license)
- 10 CFR 52.147, Duration of Design Approval + (Duration of design approval)
- 10 CFR 72.42, Duration of License; Renewal + (Duration of license; renewal)
- 10 CFR 52.173, Duration of Manufacturing License + (Duration of manufacturing license)
- 10 CFR 52.26, Duration of Permit + (Duration of permit)
- 10 CFR 52.33, Duration of Renewal + (Duration of renewal)
- 10 CFR 52.61, Duration of Renewal + (Duration of renewal)
- 10 CFR 52.181, Duration of Renewal + (Duration of renewal)
- Durell Wooten + (Durell Wooten)
- Dustin Pizza + (Dustin Pizza)
- Dustin Reinert + (Dustin Reinert)
- Dustin Scurlock + (Dustin Scurlock)
- 10 CFR 4.321, Assurance of Compliance + (Duties of NRC Recipients)
- Dylanne Duvigneaud + (Dylanne Duvigneaud)
- Dysprosium + (Dysprosium)
- E(Bess) Langley + (E(Bess) Langley)
- EPID:L-2022-DOT-0007 + (E-61283 Enclosure 5, Orano NPS Statement of Proprietary Information for the Application for the Validation Request for the FCC-3 Package)
- EPID:L-2023-LRQ-0004 + (E-Mail Re Plant Vogtle - Neop Letter Dated October 8, 2023 - Vogtle 3 & 4 - TS 3.7.6 License Amendment Request)
- EPID:L-2017-FPR-0067 + (E-Mail from M. Krick/Sses SSES ISFSI (Conversation Held on December 12, 2018))
- EPID:L-2019-DPS-0000 + (E-mail - for Your Action: Request for Additional Information: Hdi Oyster Creek PSDAR)
- EPID:L-2022-LLR-0029 + (E-mail Dated 11/10/2022 Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps)
- EPID:L-2024-LLA-0054 + (E.I. Hatch (50-321; 50-366), Single Positive Test Form Collected on 01/15/2024)
- E353 + (E353)