Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17229A716 + (18:11:58, 8 January 2025)
- ML17229A715 + (18:11:59, 8 January 2025)
- ML17229A713 + (18:12:00, 8 January 2025)
- ML17229A711 + (18:12:01, 8 January 2025)
- ML17229A710 + (18:12:02, 8 January 2025)
- L-98-108, Responds to Violations Noted in Insp Repts 50-335/98-01 & 50-389/98-01.Corrective Actions:Terminated Access Authorization for Both Individuals & Temporarily Suspended Terminations of Access Authorization in Plant Badging Ofc + (18:12:08, 8 January 2025)
- IR 05000335/1998003 + (18:12:28, 8 January 2025)
- ML17229A704 + (18:12:29, 8 January 2025)
- TAC:M94736 + (18:12:33, 8 January 2025)
- ML17229A703 + (18:12:37, 8 January 2025)
- 05000389/LER-1998-003-01, :on 980326,discovered Containment Pressure Instrumentation Design Single Failure Vulnerability.Caused by Inadequate Design by Personnel Error.Removed RPS & ESFAS Containment Pressure Bypass Keys Immediately + (18:12:39, 8 January 2025)
- ML17229A700 + (18:12:41, 8 January 2025)
- ML17229A699 + (18:12:42, 8 January 2025)
- ML17229A697 + (18:12:43, 8 January 2025)
- ML17229A694 + (18:12:49, 8 January 2025)
- ML17229A691 + (18:12:53, 8 January 2025)
- ML17229A690 + (18:12:55, 8 January 2025)
- ML17229A689 + (18:12:56, 8 January 2025)
- ML17229A687 + (18:12:57, 8 January 2025)
- ML17229A686 + (18:12:58, 8 January 2025)
- L-98-103, Forwards ISI-PSL-1-97, Form OAR-1 Owners Activity Rept, for Slp Unit 1 Second Interval,Third Period,Per ASME Section Xi.Prepared & Certified Upon Completion of Each Refueling Outage Following End of Each Insp Period + (18:12:59, 8 January 2025)
- L-98-107, Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2 + (18:13:05, 8 January 2025)
- ML17229A682 + (18:13:11, 8 January 2025)
- ML17229A677 + (18:13:11, 8 January 2025)
- 05000335/LER-1998-005, :on 980305,identified Two Conditions That Were Outside App R Design Bases.Caused by Design Oversight During Development of Original App R Safe SD Design.Established 30 Minute Roving Fire Watches & Provided Training + (18:13:13, 8 January 2025)
- L-98-094, Cycle 15 Reactor Startup Physics & Replacement SG Testing Rept + (18:13:14, 8 January 2025)
- ML17229A674 + (18:13:17, 8 January 2025)
- 05000389/LER-1998-002-01, :on 980224,radiation Monitor Surveillance Inadequacies Led to Operating of Facility Prohibited by Tss. Caused by Congnitive Personnel Error.Permanent Procedure Changes Were Implemented + (18:13:22, 8 January 2025)
- ML17229A671 + (18:13:26, 8 January 2025)
- ML17229A669 + (18:13:27, 8 January 2025)
- IR 05000335/1998002 + (18:13:56, 8 January 2025)
- ML17229A666 + (18:13:58, 8 January 2025)
- ML17229A664 + (18:13:59, 8 January 2025)
- IR 05000335/1997014 + (18:14:32, 8 January 2025)
- ML17229A662 + (18:14:34, 8 January 2025)
- ML17229A661 + (18:14:35, 8 January 2025)
- ML17229A659 + (18:14:37, 8 January 2025)
- ML17229A657 + (18:14:43, 8 January 2025)
- 05000389/LER-1998-001-01, :on 980206,high/low Pressure Shutdown Cooling Interface Was Noted Outside App R Design Bases.Caused by Personnel Error.Addl Guidance Was Provided to Engineering Dept Personnel + (18:14:55, 8 January 2025)
- L-98-057, Forwards Summary of Results of Any Change to or Error Discovered in Evaluation Models for Eccs,Or Application of Such Models,That Affect Fuel Cladding Temp Calculation.Info Submitted Per 10CFR50.46(a)(3)(ii) + (18:14:59, 8 January 2025)
- ML17229A651 + (18:15:04, 8 January 2025)
- ML17229A650 + (18:15:05, 8 January 2025)
- L-98-031, Application for Amend to License NPF-16,revising Applicability of TS 3.4.7 Re RCS Chemistry,Consistent W/ Corresponding Specification for Unit 1 + (18:15:06, 8 January 2025)
- ML17229A647 + (18:15:10, 8 January 2025)
- ML17229A646 + (18:15:11, 8 January 2025)
- ML17229A644 + (18:15:13, 8 January 2025)
- L-98-039, Submits Response to Violations Noted in Insp Repts 50-335/97-14 & 50-389/97-14.Corrective Actions:Sg Replacement Project Personnel Alerted to St Lucie Plant Procedural Requirements on Planned Deviations of TS Limits + (18:15:19, 8 January 2025)
- ML17229A639 + (18:15:20, 8 January 2025)
- ML17229A638 + (18:15:21, 8 January 2025)
- ML17229A637 + (18:15:22, 8 January 2025)
- L-98-049, Annual Operating Rept + (18:15:25, 8 January 2025)