Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206T394 + (04:20:03, 7 December 2024)
- ML20206T389 + (04:20:04, 7 December 2024)
- ML20206T388 + (04:20:13, 7 December 2024)
- ML20206T385 + (04:20:14, 7 December 2024)
- ML20206T387 + (04:20:14, 7 December 2024)
- B17768, Forwards First Quarter 1999 Performance Rept, for Jan-Mar 1999,addressing Performance of Station Key Issues & Backlog Mgt.Document Contains Status of ICAVP Level 4 Drs & Sargent & Lundy ICAVP Final Rept Findings + (04:20:15, 7 December 2024)
- ML20206T384 + (04:20:15, 7 December 2024)
- ML20206T381 + (04:20:16, 7 December 2024)
- ML20206T378 + (04:20:18, 7 December 2024)
- ML20206T377 + (04:20:19, 7 December 2024)
- ML20206T374 + (04:20:20, 7 December 2024)
- ML20206T370 + (04:20:20, 7 December 2024)
- ML20206T369 + (04:20:21, 7 December 2024)
- ML20206T365 + (04:20:22, 7 December 2024)
- TAC:M68080 + (04:20:23, 7 December 2024)
- ML20206T364 + (04:20:25, 7 December 2024)
- ML20206T363 + (04:20:26, 7 December 2024)
- ML20206T362 + (04:20:27, 7 December 2024)
- ML20206T350 + (04:20:28, 7 December 2024)
- ML20206T357 + (04:20:28, 7 December 2024)
- ML20206T349 + (04:20:29, 7 December 2024)
- ML20206T344 + (04:20:33, 7 December 2024)
- BECO-86-089, Estimates That Unit Will Be Ready to Return to Svc by End of Aug Following RHR Pump Insp.Adverse Affect of Current Unplanned Outage on long-term App R Fire Protection Program & Util Understanding of 10CFR50.48 Provision Discussed + (04:20:33, 7 December 2024)
- ML20206T336 + (04:20:34, 7 December 2024)
- ML20206T335 + (04:20:35, 7 December 2024)
- ML20206T332 + (04:20:36, 7 December 2024)
- 3F0599-05, Responds to 990402 RAI Re Third 10-year Interval ISI Program Plan Requests for Relief.Util Revised Relief Requests 98-010-II,98-003-PT,98-005-PT & 98-001-SS Based on Responses to Rai.Revised Relief Requests Encl + (04:20:40, 7 December 2024)
- ML20206T326 + (04:20:40, 7 December 2024)
- ML20206T323 + (04:20:41, 7 December 2024)
- ML20206T319 + (04:20:46, 7 December 2024)
- ML20206T318 + (04:20:46, 7 December 2024)
- 1CAN068606, Requests Util 801031 Tech Spec Change Request Re Electromatic Relief Valve Be Withdrawn from Consideration, Per Conversation W/Vissing + (04:20:47, 7 December 2024)
- ML20206T311 + (04:20:53, 7 December 2024)
- ML20206T309 + (04:20:55, 7 December 2024)
- 0CAN068607, Forwards Vols I-III of IEEE 634-1978 Std Cable Penetration Fire Stop Qualification Test:Arkansas Nuclear Units 1 & 2, Russellville,Ar - Site Specific,Arkansas Power & Light Co Spec APL-2434, Final Rept + (04:20:56, 7 December 2024)
- ML20206T304 + (04:20:57, 7 December 2024)
- 05000353/LER-1999-002-03, :on 990419,various ESF Actuations Due to Loss of Power to 2A Rps/Ups Distribution Panel,Occurred.Caused by Loose Bus Bar Connection in RPS Breaker panel.Bus-bar Connection Inspected,Cleaned & re-tightened + (04:20:59, 7 December 2024)
- ML20206T300 + (04:21:00, 7 December 2024)
- ML20206T299 + (04:21:00, 7 December 2024)
- ML20206T298 + (04:21:01, 7 December 2024)
- ML20206T296 + (04:21:01, 7 December 2024)
- 05000353/LER-1999-002, Forwards LER 99-002-00,automatic Actuations of Primary Containment & Reactor Vessel Isolation Control Sys & Other Common Plant ESF Due to Loss of Power to a Rps/Ups Power Distribution Panel on 990419 + (04:21:02, 7 December 2024)
- ML20206T292 + (04:21:03, 7 December 2024)
- NOC-AE-000531, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-2300 Applicable to Qualification & Certification of VT-2 Visual Exam Personnel for Second ISI Interval.Relief Request RR-ENG-2-9 Encl.Without Page 3 of 3 + (04:21:03, 7 December 2024)
- ML20206T290 + (04:21:04, 7 December 2024)
- ML20206T288 + (04:21:05, 7 December 2024)
- ML20206T287 + (04:21:05, 7 December 2024)
- NOC-AE-000532, Requests from ASME Section XI Code Exam Scheduling Requirements of Exam Category B-A Item B1.30 (Reactor Pressure Vessel shell-to-flange Weld) for Second ISI Interval.Relief Request RR-ENG-2-13 Encl + (04:21:06, 7 December 2024)
- ML20206T283 + (04:21:06, 7 December 2024)
- IR 05000361/1986008 + (04:21:07, 7 December 2024)
- ML20206T277 + (04:21:08, 7 December 2024)
- ML20206T274 + (04:21:09, 7 December 2024)