Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212C733 + (11:43:16, 4 December 2024)
- ML20212C732 + (11:43:16, 4 December 2024)
- ML20212C729 + (11:43:17, 4 December 2024)
- NSD-NRC-97-5388, Forwards Summary of W Responses Re Nuclear Island Basement. Response Should Permit Resolution of All Remaining Open Items Re Nuclear Island Basement + (11:43:20, 4 December 2024)
- PNO-IV-97-060, on 971027,portal Monitor Had Alarmed When Vehicle Carrying Load of Scrap Metal Arrived at Facility. Commonwealth Aluminum Reported,Routinely Received Magnesium from Std Metals,Also of Carson,Ca.State of CA Informed + (11:43:21, 4 December 2024)
- ML20212C717 + (11:43:22, 4 December 2024)
- 05000457/LER-1997-002-08, :on 970927,reactor Trip Breakers Were Manually Opened Due to Decoder & Encoder Control Card Failure. Replaced Defective Card & re-performed Surveillance Prior to Unit Startup + (11:43:24, 4 December 2024)
- ML20212C715 + (11:43:24, 4 December 2024)
- NRC-97-0097, Responds to NRC Re Violations Noted in Insp Repts 50-341/97-02 & 97-03.Corrective actions:multi-discipline Team Identified & Investigated Potential Factors Re Binding of Fused Disconnect Switch Operating Mechanism + (11:43:25, 4 December 2024)
- ML20212C710 + (11:43:26, 4 December 2024)
- ML20212C708 + (11:43:27, 4 December 2024)
- ML20212C707 + (11:43:27, 4 December 2024)
- IR 05000254/1999017 + (11:43:29, 4 December 2024)
- ML20212C704 + (11:43:29, 4 December 2024)
- ML20212C703 + (11:43:30, 4 December 2024)
- ML20212C702 + (11:43:31, 4 December 2024)
- ML20212C696 + (11:43:32, 4 December 2024)
- ML20212C697 + (11:43:32, 4 December 2024)
- ML20212C693 + (11:43:33, 4 December 2024)
- ML20212C691 + (11:43:34, 4 December 2024)
- U-602832, Forwards Rev 2 to CPS TS Bases,Consisting of Pages Annotated W/Rev Numbers 2-1 Through 2-14.Text Changes Identified by Rev Bars + (11:43:35, 4 December 2024)
- ML20212C686 + (11:43:36, 4 December 2024)
- ML20212C682 + (11:43:38, 4 December 2024)
- ML20212C677 + (11:43:39, 4 December 2024)
- PNO-I-99-043, on 990916,Hurricane Floyd Was Approaching Ccnpp,Sgs,Hcgs & Ocnpp.Hurricane Was Centered at Latitude 36.0 North & Longitude 76.6 West & Moving north-northeast at Approx 25 Mph.Plants Remain at Power + (11:43:40, 4 December 2024)
- CY-97-109, Provides Addl Info Re Proposed Defueled Emergency Plan & Util Request for Exemption from 10CFR50.54(q).Defueled EPIP Depip 1.5-1, Emergency Assessment Using Defueled EAL Tables & Draft Procedure Rev 20 to ACP 1.0-6,encl + (11:43:41, 4 December 2024)
- ML20212C672 + (11:43:42, 4 December 2024)
- ML20212C669 + (11:43:43, 4 December 2024)
- NSD-NRC-97-5402, Summarizes Breaks That Need to Be Considered for AP600 as Result of LBB Evaluations Performed Re Pipe Rupture Analysis.Pipe Rupture LOCA Dynamic Transient Limiting Case Analysis,Encl + (11:43:43, 4 December 2024)
- PNO-IV-99-038, on 990910,operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.New Baffle & Seal Assembly Were Installed & Plant Was Returned to Power Operations on 990810 + (11:43:44, 4 December 2024)
- ML20212C665 + (11:43:45, 4 December 2024)
- PNO-II-88-003, licensee Identified 4 Inch 85% Throughwall Circumferential Indication on E 12-inch Inlet Recirculation Riser to Nozzle Safe & Weld,While Performing Automated Ultrasonic Testing + (11:43:45, 4 December 2024)
- ML20212C663 + (11:43:46, 4 December 2024)
- ML20212C660 + (11:43:48, 4 December 2024)
- ML20212C659 + (11:43:48, 4 December 2024)
- 05000457/LER-1997-001-13, :on 970916,identified That Scaffolding Had Potentially Blocked Weighted Lever Arm on Extraction Steam non-return Check Valve 2ES015C.Caused by Improper Assumptions.Maint Adjusted Scaffold + (11:43:51, 4 December 2024)
- JAFP-99-0262, Forwards Voluntary Response to Administrative Ltr 99-03, Re Preparation & Scheduling of Operator Licensing Exams. Completed NRC Form 536,containing Info Re Proposed Exam Preparation Schedule & Initial Operator License Exams,Encl + (11:43:51, 4 December 2024)
- ML20212C656 + (11:43:52, 4 December 2024)
- ML20212C654 + (11:43:52, 4 December 2024)
- ML20212C653 + (11:43:53, 4 December 2024)
- ML20212C651 + (11:43:54, 4 December 2024)
- PNO-II-88-015, on 880229,licensee Informed NRC That Unit,A 1 Mwt Pool Reactor Had Been Shut Down Due to Primary Coolant Leak Outside Containment.Region II Has Dispatched Both Health Physics & Operations Inspector to Review Event + (11:43:54, 4 December 2024)
- ML20212C650 + (11:43:55, 4 December 2024)
- ML20212C646 + (11:43:56, 4 December 2024)
- ML20212C649 + (11:43:56, 4 December 2024)
- PNO-I-88-024C, Updates Previous Notifications Re Ingestion of P-32 by Female Graduate Student on 880229.Student Was Whole Body Counted on 880311,880318,880325 & 880408 at New York Univ + (11:43:57, 4 December 2024)
- ML20212C641 + (11:43:58, 4 December 2024)
- ST-HL-AE-1918, Responds to 870121 Request for Addl Info Re IE Bulletin 85-003.Affected motor-operated Valves Listed.Torque & Limit Switches Will Be Set Per Design Requirements & in Accordance W/Approved Prerequisite Test Procedures.Related Info Encl + (11:43:58, 4 December 2024)
- ML20212C640 + (11:43:59, 4 December 2024)
- ML20212C638 + (11:44:00, 4 December 2024)
- PNO-II-88-062, on 881011 & 12,State of Ga Reported That Leakage Rate Cs-137 from Wesf Capsules in Rsi Increased.Nrc Representatives Discussed Emergency Procedures,Availability of Contingency Plan & Future Planned Activities at Facility + (11:44:00, 4 December 2024)