Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214Q525 + (05:59:20, 4 December 2024)
- ML20214Q519 + (05:59:21, 4 December 2024)
- ML20214Q520 + (05:59:21, 4 December 2024)
- ML20214Q517 + (05:59:22, 4 December 2024)
- ML20214Q513 + (05:59:23, 4 December 2024)
- ML20214Q516 + (05:59:23, 4 December 2024)
- ML20214Q512 + (05:59:24, 4 December 2024)
- ML20214Q509 + (05:59:25, 4 December 2024)
- ML20214Q507 + (05:59:27, 4 December 2024)
- ML20214Q504 + (05:59:28, 4 December 2024)
- ML20214Q503 + (05:59:29, 4 December 2024)
- ML20214Q502 + (05:59:29, 4 December 2024)
- 05000298/LER-1986-018, :on 860818,reactor Water Not Sampled for Conductivity After Reactor Recirculation Sys Inboard Sample Valve Declared Inoperable Due to Failed Solenoid Valve. Caused by Personnel Error.Personnel Counseled + (05:59:31, 4 December 2024)
- ML20214Q498 + (05:59:32, 4 December 2024)
- ML20214Q497 + (05:59:32, 4 December 2024)
- DD-86-16, Advises That Time for Commission to Review Directors Decision DD-86-16 Expired.Commission Declined Review. Decision Become Final Agency Action on 861201.Served on 861203 + (05:59:33, 4 December 2024)
- ML20214Q495 + (05:59:33, 4 December 2024)
- 05000409/LER-1986-025, :on 860821,containment Bldg Ventilation Isolation Occurred on High Gaseous Activity Monitor Alarm. Caused by Welding.Correlation Between Welding & Increased Gaseous Activity Checked + (05:59:38, 4 December 2024)
- ML20214Q492 + (05:59:39, 4 December 2024)
- ML20214Q490 + (05:59:40, 4 December 2024)
- IR 05000309/1987009 + (05:59:41, 4 December 2024)
- ML20214Q485 + (05:59:41, 4 December 2024)
- 05000454/LER-1987-013-03, :on 870501,reactor Trip Signal Occurred During Control Rod Position Surveillance.Caused by Momentary Loss of Level Simulation Due to Bumping of Simulation Mechanism. Precaution to Simulation Surveillance Added + (05:59:43, 4 December 2024)
- ML20214Q483 + (05:59:43, 4 December 2024)
- ML20214Q478 + (05:59:44, 4 December 2024)
- ML20214Q477 + (05:59:45, 4 December 2024)
- ML20214Q475 + (05:59:49, 4 December 2024)
- ST-HL-AE-1829, Forwards Revised Test Plan for Vibration Testing of Diesel Fuel Oil Piping.Rev Incorporates Proposed Changes to Allowable Velocity Equation of Ansi/Asme Std OM-3,Section 5.1.2.4.Related Correspondence + (05:59:49, 4 December 2024)
- ML20214Q474 + (05:59:50, 4 December 2024)
- ML20214Q473 + (05:59:51, 4 December 2024)
- ML20214Q467 + (05:59:52, 4 December 2024)
- ML20214Q466 + (05:59:53, 4 December 2024)
- ML20214Q465 + (05:59:54, 4 December 2024)
- ML20214Q463 + (05:59:55, 4 December 2024)
- ML20214Q464 + (05:59:55, 4 December 2024)
- ML20214Q460 + (05:59:56, 4 December 2024)
- ML20214Q459 + (05:59:57, 4 December 2024)
- ST-HL-AE-1800, Responds to Violations Noted in Insp Repts 50-498/86-31 & 50-499/86-31.Corrective Actions:Program Implemented to Enhance Plant Clean Up Efforts to Minimize Possible Equipment Damage & to Ensure Acceptable Housekeeping Levels + (05:59:57, 4 December 2024)
- ML20214Q457 + (05:59:58, 4 December 2024)
- ML20214Q453 + (05:59:59, 4 December 2024)
- ML20214Q449 + (06:00:00, 4 December 2024)
- ML20214Q448 + (06:00:01, 4 December 2024)
- ML20214Q447 + (06:00:01, 4 December 2024)
- ML20214Q446 + (06:00:02, 4 December 2024)
- ML20214Q442 + (06:00:03, 4 December 2024)
- ML20214Q443 + (06:00:03, 4 December 2024)
- ML20214Q441 + (06:00:04, 4 December 2024)
- ML20214Q438 + (06:00:05, 4 December 2024)
- ML20214Q426 + (06:00:07, 4 December 2024)
- ML20214Q419 + (06:00:22, 4 December 2024)
- ML20214Q418 + (06:00:23, 4 December 2024)
- ML20214Q417 + (06:00:24, 4 December 2024)