Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-I-82-052, on 820715,moisture Gauge Containing 8-mCi Cs-137 Rod & 40-mCi Am-241/Be Source Run Over & Damaged by High Lift.Source Retracted Into Lead Shield at Time of Accident.Leak Test Underway.Site Roped Off + (20:48:58, 17 December 2024)
- ML20055B460 + (20:48:59, 17 December 2024)
- ML20055B454 + (20:49:00, 17 December 2024)
- ML20055B453 + (20:49:01, 17 December 2024)
- ML20055B452 + (20:49:02, 17 December 2024)
- IR 05000003/1982001 + (20:49:07, 17 December 2024)
- ML20055B450 + (20:49:08, 17 December 2024)
- ML20055B448 + (20:49:09, 17 December 2024)
- IR 05000245/1982013 + (20:49:10, 17 December 2024)
- ML20055B446 + (20:49:12, 17 December 2024)
- ML20055B444 + (20:49:13, 17 December 2024)
- PNO-II-82-078, on 820707,unit Shutdown to Investigate Low Level Noise.Noise Discovered to Be Vibration on Secondary Side of Steam Generator.No Corrective Actions Noted.Restart Rescheduled for 820712 + (20:49:13, 17 December 2024)
- ML20055B437 + (20:49:15, 17 December 2024)
- 05000219/LER-1982-033, Forwards LER 82-033/03L-0.Detailed Event Analysis Encl + (20:49:22, 17 December 2024)
- ML20055B433 + (20:49:24, 17 December 2024)
- ML20055B432 + (20:49:25, 17 December 2024)
- ML20055B431 + (20:49:26, 17 December 2024)
- IR 05000322/1982017 + (20:49:34, 17 December 2024)
- ML20055B428 + (20:49:35, 17 December 2024)
- IR 05000219/1982015 + (20:49:36, 17 December 2024)
- ML20055B425 + (20:49:37, 17 December 2024)
- PNO-II-82-079, on 820710,two Licensee Employees Arrested Offsite & Charged W/Illegal Possession of Drugs.Licensee Invalidated Security Badges of Both Individuals.Status of Employees Is Being Reviewed + (20:49:38, 17 December 2024)
- ML20055B424 + (20:49:38, 17 December 2024)
- ML20055B422 + (20:49:39, 17 December 2024)
- PNO-II-82-077, on 820707,controlled Shutdown from 100% Power Initiated After Tube Leaks Developed in Steam Generator B. Leakage Rate Remained Below Tech Specs.Insp & Repairs Planned During Cold Shutdown on 820708 + (20:49:43, 17 December 2024)
- 05000219/LER-1982-036, Forwards LER 82-036/03L-0.Detailed Event Analysis Encl + (20:49:44, 17 December 2024)
- ML20055B417 + (20:49:46, 17 December 2024)
- ML20055B414 + (20:49:47, 17 December 2024)
- ML20055B416 + (20:49:47, 17 December 2024)
- ML20055B413 + (20:49:48, 17 December 2024)
- W3P82-1918, Submits Schedule for Seismic Qualification Review Team Audit.Seismic Qualification Summary Will Be Submitted by 820716 W/Audit Commencing 820831 at Plant Site + (20:49:49, 17 December 2024)
- IR 05000454/1982005 + (21:06:46, 17 December 2024)
- ML20055B410 + (21:06:48, 17 December 2024)
- ML20055B408 + (21:06:49, 17 December 2024)
- ML20055B406 + (21:06:50, 17 December 2024)
- ML20055B407 + (21:06:50, 17 December 2024)
- ML20055B405 + (21:06:51, 17 December 2024)
- ML20055B404 + (21:06:52, 17 December 2024)
- ML20055B403 + (21:06:52, 17 December 2024)
- ML20055B402 + (21:06:53, 17 December 2024)
- PNO-II-82-082, on 820715,unit Scrammed Due to Low Water Signal.Caused by Inadvertent Feedwater Pump Trip on Low Suction Pressure.Contaminated Water Overflowed from Precoat Tank to Turbine Bldg Floor & Outside to Ground.Area Closed + (21:06:53, 17 December 2024)
- ML20055B400 + (21:06:55, 17 December 2024)
- ML20055B399 + (21:06:56, 17 December 2024)
- ML20055B398 + (21:06:57, 17 December 2024)
- ML20055B397 + (21:06:57, 17 December 2024)
- ML20055B396 + (21:06:58, 17 December 2024)
- ML20055B395 + (21:07:00, 17 December 2024)
- ML20055B393 + (21:07:01, 17 December 2024)
- ML20055B394 + (21:07:01, 17 December 2024)
- ML20055B392 + (21:07:02, 17 December 2024)
- ML20055B391 + (21:07:03, 17 December 2024)