Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20064J186 + (01:36:35, 17 December 2024)
- 05000278/LER-1978-023-03, /03L-0 on 781127:D Reactor Bldg Area Exhaust Radiat Monitor Indicated Downscale & Was Determined to Be Inoperable.Caused by Defective Zener Diode in Amplifier of GE sensor-converter Unit,Model 194X927011 + (01:36:36, 17 December 2024)
- ML20064J178 + (01:36:37, 17 December 2024)
- 05000368/LER-1978-016-03, /03L-0 on 781109:during Mode 3 Oper,Emergency Diesel Generator B Tripped from 100% Load.Caused by Damage to Rod & Main Bearings,Crankshaft & Pistons,Perhaps Due to Loose Baseplate Mounting Screw + (01:36:38, 17 December 2024)
- 05000237/LER-1982-052, Forwards LER 82-052/03L-0 + (01:36:39, 17 December 2024)
- ML20064J169 + (01:36:40, 17 December 2024)
- 05000368/LER-1978-016, Forwards LER 78-016/03L-0 + (01:36:41, 17 December 2024)
- ML20064J166 + (01:36:42, 17 December 2024)
- 05000237/LER-1982-051-03, /03L-0:on 821207,during Normal Operation,Component Cooling Svc Water Pump 2B Taken from Svc W/O LPCI Operability Test.Caused by Personnel Error.Operability Test Run & Satisfactorily Completed.Procedures Reviewed + (01:36:46, 17 December 2024)
- 05000237/LER-1982-051, Forwards LER 82-051/03L-0 + (01:36:47, 17 December 2024)
- ML20064J157 + (01:36:47, 17 December 2024)
- 05000281/LER-1982-074-03, /03L-0:on 821211,w/unit in Cold Shutdown,Pt 39B-2 Revealed 2-RC-HSS-162 & 163 & 2-RH-HSS-5 Snubbers Had Low Levels in Reservoirs.Caused by Leak in Reservoir Sight Glass & on Pipe Fitting to Valve Block + (01:36:49, 17 December 2024)
- ML20064J144 + (01:36:50, 17 December 2024)
- ML20064J134 + (01:36:51, 17 December 2024)
- ML20064J139 + (01:36:51, 17 December 2024)
- 05000361/LER-1982-158-03, /03L-0:on 821202,during Surveillance Testing,Rcs Water Inventory Balance Indicated Unidentified Leakage Exceeding Tech Specs.Caused by Isolated Chemical & Vol Control Sys Charging Pump P-192.Plungers Replaced + (01:36:53, 17 December 2024)
- ML20064J126 + (01:36:54, 17 December 2024)
- ML20064J125 + (01:36:55, 17 December 2024)
- ML20064J119 + (01:36:56, 17 December 2024)
- ML20064J112 + (01:36:58, 17 December 2024)
- 05000281/LER-1982-073-03, /03L-0:on 821207 & 24,FI-474 Drifted Low. Caused by Partial Loss of Fluid in Sensing Line to High Side of Transmitter.Valve Repaired & Sensing Line Filled + (01:37:00, 17 December 2024)
- ML20064J105 + (01:37:02, 17 December 2024)
- 05000338/LER-1982-076-03, /03L-0:on 821207,while in Mode 3,w/casing Cooling Pump 3A Removed from Svc to Perform Maint,Mode Change Made Due to Unscheduled Outage.Maint Completed in Mode 5 + (01:37:03, 17 December 2024)
- ML20064J102 + (01:37:06, 17 December 2024)
- ML20064J091 + (01:37:06, 17 December 2024)
- 05000338/LER-1982-076, Forwards LER 82-076/03L-0 + (01:37:07, 17 December 2024)
- ML20064J079 + (01:37:08, 17 December 2024)
- 05000361/LER-1982-158, Forwards LER 82-158/03L-0.Detailed Event Analysis Submitted + (01:37:09, 17 December 2024)
- ML20064J078 + (01:37:09, 17 December 2024)
- B14770, Proposed Tech Specs Supporting one-time Extension to 18- Month Surveillances + (01:37:10, 17 December 2024)
- ML20064J069 + (01:37:11, 17 December 2024)
- ML20064J061 + (01:37:12, 17 December 2024)
- ML20064J068 + (01:37:12, 17 December 2024)
- ML20064J056 + (01:37:13, 17 December 2024)
- ML20064J054 + (01:37:14, 17 December 2024)
- ML20064J053 + (01:37:15, 17 December 2024)
- LD-94-018, Suppls Submitted by Epri,Forwarding Rept on Technical Aspects of Emergency Planning for Alwrs + (01:37:16, 17 December 2024)
- ML20064J051 + (01:37:16, 17 December 2024)
- 05000395/LER-1982-054-03, /03L-0:on 821208,loose Part Detection Sys Failed Daily Channel Check.Caused by Microprocessor Failure. Microprocessor Replaced + (01:37:19, 17 December 2024)
- ML20064J048 + (01:37:20, 17 December 2024)
- ML20064J046 + (01:37:21, 17 December 2024)
- 05000387/LER-1982-067-01, /01T-0:on 821224,grab Samples Not Taken Every 4 H While Main Condenser Offgas Hydrogen Monitor Inoperable. Caused by Lack of Communication Between Operations & Chemistry Group.Incident Reporting Procedure Changed + (01:37:22, 17 December 2024)
- ML20064J040 + (01:37:23, 17 December 2024)
- ML20064J038 + (01:37:24, 17 December 2024)
- 05000395/LER-1982-054, Forwards LER 82-054/03L-0.Detailed Event Analysis Encl + (01:37:29, 17 December 2024)
- ML20064J034 + (01:37:29, 17 December 2024)
- 05000362/LER-1982-006, Ro:On 821217,incident Involving Emergency Safety Features Actuation Signal Occurred.Written Followup Rept W/Interim LER 82-006 Will Be Submitted by 821228 + (01:37:30, 17 December 2024)
- ML20064J028 + (01:37:31, 17 December 2024)
- ML20064J027 + (01:37:32, 17 December 2024)
- 05000416/LER-1982-164-03, /03L-0:on 821212 & 13,two Fire Doors in Auxiliary Bldg Blocked Open for Planned Maint Activities & to Support Plant Testing.Testing Completed,Hoses Removed & Doors Closed + (01:37:34, 17 December 2024)
- ML20064J018 + (01:37:35, 17 December 2024)