Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000334/LER-1994-004-01, :on 940504,water Found Leaking from Pipe Penetration in East Trench of Pab & on 940506,plant Shutdown Initiated Due to Status of Efforts to Determine Source of Leakage.Two Foot Section of Pipe Replaced + (15:45:50, 16 December 2024)
- ML20069H315 + (15:45:52, 16 December 2024)
- ML20069H314 + (15:45:53, 16 December 2024)
- ML20069H313 + (15:45:53, 16 December 2024)
- ML20069H292 + (15:45:54, 16 December 2024)
- ML20069H302 + (15:45:54, 16 December 2024)
- ML20069H291 + (15:45:55, 16 December 2024)
- ML20069H287 + (15:45:56, 16 December 2024)
- ML20069H285 + (15:45:56, 16 December 2024)
- ML20069H283 + (15:45:57, 16 December 2024)
- ML20069H282 + (15:45:58, 16 December 2024)
- AECM-83-0180, Proposed Amend PCOL-83/03 to License NPF-13,consisting of Changes to Surveillance Procedure Review - Package 1, Items 1-32 & Miscellaneous Tech Spec Changes + (15:45:59, 16 December 2024)
- ML20069H261 + (15:45:59, 16 December 2024)
- PY-CEI-NRR-1794, Application for Amend to License NPF-58,replacing Clei & Toed W/Newco as Licensee,Designating Newco as Owner of PNPP & Making Other Administrative Changes to License + (15:46:01, 16 December 2024)
- ML20069H251 + (15:46:04, 16 December 2024)
- ML20069H248 + (15:46:04, 16 December 2024)
- ML20069H243 + (15:46:05, 16 December 2024)
- ML20069H239 + (15:46:06, 16 December 2024)
- ML20069H242 + (15:46:06, 16 December 2024)
- ML20069H222 + (15:46:09, 16 December 2024)
- ML20069H219 + (15:46:09, 16 December 2024)
- ML20069H218 + (15:46:10, 16 December 2024)
- ML20069H210 + (15:46:11, 16 December 2024)
- 05000416/LER-1982-077-01, /01T-0:on 820930,two Penetrations Found Not Sealed from Auxiliary Bldg to Control Bldg.Penetrations for Electrical Conduit Not Sealed During Const.Penetration Sealed + (15:46:13, 16 December 2024)
- ML20069H198 + (15:46:14, 16 December 2024)
- ML20069H205 + (15:46:14, 16 December 2024)
- 05000416/LER-1982-077, Forwards LER 82-077/01T-0 + (15:46:15, 16 December 2024)
- ML20069H195 + (15:46:15, 16 December 2024)
- ML20069H184 + (15:46:16, 16 December 2024)
- ML20069H185 + (15:46:16, 16 December 2024)
- ML20069H177 + (15:46:17, 16 December 2024)
- 05000315/LER-1982-088-03, /03L-0:on 820916,safety Valve Sv-1 for Steam Generator 3 Found Leaking.Cause Not Stated.Seat Leakage During Plant Heatup Not Uncommon.Leakage Stopped by Gagging Valve for Short Period of Time + (15:46:19, 16 December 2024)
- ML20069H174 + (15:46:20, 16 December 2024)
- ML20069H164 + (15:46:23, 16 December 2024)
- ML20069H162 + (15:46:24, 16 December 2024)
- 05000315/LER-1982-087-03, /03L-0:on 820920,containment Gaseous Radiation Monitor Channel (ERS-1305) Failed High,Forcing Removal of Containment Air Particulate Monitor Channel from Svc.Caused by Defective I/O Card.Card Replaced + (15:46:25, 16 December 2024)
- 0CAN128207, Requests That Emergency Notification Sys & Health Physics Network Telephones Be Moved to Main Floor of Technical Support Ctr to Be Available for Mar 1983 Emergency Preparedness Exercise + (15:46:26, 16 December 2024)
- ML20069H153 + (15:46:27, 16 December 2024)
- ML20069H152 + (15:46:27, 16 December 2024)
- 05000267/LER-1983-006-03, /03L-0:on 830215,loop 2 Pcrv Cooling Water Temp Exceeded 120 F.Caused by Blown Instrument Bus 2 Power Inverter Fuse.Instrument Bus re-energized & Power Inverter Repaired + (15:46:32, 16 December 2024)
- ML20069H146 + (15:46:33, 16 December 2024)
- RBG-14-510, Responds to IE Bulletin 82-04, Deficiencies in Primary Containment Electrical Penetration Assemblies. No Bunker-Ramo Electrical Penetrations Purchased.Affidavit Encl + (15:46:34, 16 December 2024)
- ML20069H139 + (15:46:37, 16 December 2024)
- 05000327/LER-1982-117-03, /03L-0:on 820914,during SI-220 Test on Fire Pump 1B-B Start Circuit,Time Delay Setpoint on Relay 1B2 Found Out of 5% Tolerance of 120-s.Cause Not Stated.Time Delay Setpoint Readjusted to within 5% Tolerance + (15:46:38, 16 December 2024)
- 05000267/LER-1983-007-03, /03L-0:on 830215,instrument Power Invertor 1B Failed.Caused by Blown 150 Amp Fuse.Reactor Manually Scrammed,Instrument Bus 2 re-energized & Fuse Replaced + (15:46:40, 16 December 2024)
- RBG-14-645, Interim Deficiency Rept Dr 98 Re Potential Failure of SBM Control Switches Mfg by Ge.Initially Reported on 830217. Investigation Incomplete.Interim or Final Rept Will Be Submitted by 830624 + (15:46:41, 16 December 2024)
- ML20069H128 + (15:46:43, 16 December 2024)
- U-602299, Part 21 Defect 21-94-010 Re Incorrect Internal Wiring of Basler Electric motor-operated Potentiometer (Mop) by Mkw Power Sys.Correct Wiring Scheme Determined & Mop Rewired in Accordance W/Vendor Wiring Diagram + (15:46:44, 16 December 2024)
- 05000327/LER-1982-117, Forwards LER 82-117/03L-0 + (15:46:45, 16 December 2024)
- 05000267/LER-1983-006, Forwards LER 83-006/03L-0.Detailed Event Analysis Encl + (15:46:45, 16 December 2024)
- ML20069H114 + (15:46:46, 16 December 2024)
- ML20069H106 + (15:46:47, 16 December 2024)