Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Press Release-III-10-032, NRC Begins Special Inspection at Braidwood Nuclear Power Plant + (08:19:08, 14 January 2025)
- ML102300483 + (08:19:10, 14 January 2025)
- ML102300478 + (08:19:11, 14 January 2025)
- ML102300480 + (08:19:11, 14 January 2025)
- ML102300469 + (08:19:12, 14 January 2025)
- ML102300477 + (08:19:12, 14 January 2025)
- ML102300445 + (08:19:13, 14 January 2025)
- ML102300443 + (08:19:14, 14 January 2025)
- ML102300441 + (08:19:15, 14 January 2025)
- ML102300438 + (08:19:16, 14 January 2025)
- HNP-10-086, Submittal of NRC Regulatory Issue Summary 2010-08, Preparation and Scheduling of Operator Licensing Examinations + (08:19:17, 14 January 2025)
- ML102300436 + (08:19:17, 14 January 2025)
- ML102300418 + (08:19:20, 14 January 2025)
- ML102300406 + (08:19:21, 14 January 2025)
- L-2010-174, Independent Spent Fuel Storage Installation (ISFSI) - Cask Registration + (08:19:22, 14 January 2025)
- L-2010-177, Independent Spent Fuel Storage Installation (ISFSI) - Cask Registration + (08:19:23, 14 January 2025)
- L-2010-175, Independent Spent Fuel Storage Installation (ISFSI) - Cask Registration + (08:19:23, 14 January 2025)
- WO 10-0053, Letter Withdrawal of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating + (08:19:24, 14 January 2025)
- 05000250/LER-2010-002, For Turkey Point, Unit 3 Regarding Fuel Transfer Pump Failure Renders 3B Emergency Diesel Generator Inoperable + (08:19:28, 14 January 2025)
- ML102300385 + (08:19:29, 14 January 2025)
- 05000369/LER-2010-003, For McGuire Nuclear Station, Regarding Dropped Control Rods Resulting in Completion of a Technical Specification Required Shutdown and Actuation of the Reactor Protection System and Auxiliary Feedwater System + (08:19:32, 14 January 2025)
- ML102300383 + (08:19:32, 14 January 2025)
- SBK-L-10118, 10 CFR 72.48 Report of Changes, Tests and Experiments + (08:19:34, 14 January 2025)
- ML102300325 + (08:19:41, 14 January 2025)
- ML102300319 + (08:19:42, 14 January 2025)
- L-PI-10-076, Calculation No. GEN-PI-083, Revision 1, Locked Rotor Accident (LRA) Analysis Using AST, Attachment 5 + (08:19:44, 14 January 2025)
- ML102300298 + (08:19:46, 14 January 2025)
- ML102300297 + (08:19:48, 14 January 2025)
- ML102300296 + (08:19:48, 14 January 2025)
- ML102300295 + (08:19:49, 14 January 2025)
- ML102300278 + (08:19:50, 14 January 2025)
- Press Release-II-10-059, NRC Schedules Meeting to Discuss Inspection Results for Crystal River Nuclear Plant Containment + (08:19:50, 14 January 2025)
- IR 05000316/2010301 + (08:19:51, 14 January 2025)
- ML102300258 + (08:19:52, 14 January 2025)
- ML102300270 + (08:19:52, 14 January 2025)
- ML102300255 + (08:19:53, 14 January 2025)
- ML102300250 + (08:19:55, 14 January 2025)
- ML102300243 + (08:19:56, 14 January 2025)
- GNRO-2010/00058, Report of 10CFR50.59 Evaluations and Commitment Changes - July 1, 2009 Through June 30, 2010 + (08:19:57, 14 January 2025)
- ML102300238 + (08:19:58, 14 January 2025)
- 05000301/LER-2010-001, Regarding Manual Reactor Trip Following Automatic Turbine Trip Due to Generator Lockout + (08:20:00, 14 January 2025)
- ML102300236 + (08:20:02, 14 January 2025)
- GNRO-2010/00059, Report of 10CFR72.48 Evaluations - July 1, 2009 Through June 30,2010 + (08:20:03, 14 January 2025)
- ML102300230 + (08:20:03, 14 January 2025)
- ML102300229 + (08:20:04, 14 January 2025)
- ML102300178 + (08:20:05, 14 January 2025)
- W3F1-2010-0065, Response to Request for Additional Information Associated with Technical Specification Table 3.4-1 Isolation Valve Addition + (08:20:05, 14 January 2025)
- W3F1-2010-0064, Response to NRC Requests for Additional Information Regarding License Amendment Request for Leak-Before-Break of the Pressurizer Surge Line + (08:20:06, 14 January 2025)
- ML102300174 + (08:20:07, 14 January 2025)
- ML102300173 + (08:20:07, 14 January 2025)
- ML102300168 + (08:20:08, 14 January 2025)