Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RBG-43093, Monthly Operating Rept for June 1996 for River Bend Station Unit 1 + (04:10:37, 13 December 2024)
- ST-HL-AE-5428, Requests Approval of Attached Request for Incorporation of Portion of ASME O&M Code Governing Valve Seat Leakage Testing of Containment Isolation Valves Into STP Inservice Test Program + (04:10:38, 13 December 2024)
- 3F0796-01, Monthly Operating Rept for June 1996 for Crystal River Unit 3 + (04:10:39, 13 December 2024)
- ML20115H410 + (04:10:40, 13 December 2024)
- W3P85-1217, Monthly Operating Rept for Mar 1985 + (04:10:40, 13 December 2024)
- ML20115H402 + (04:10:41, 13 December 2024)
- ML20115H399 + (04:10:42, 13 December 2024)
- ML20115H396 + (04:10:45, 13 December 2024)
- RC-96-0176, Responds to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over SR Equipment + (04:10:46, 13 December 2024)
- ML20115H357 + (04:10:47, 13 December 2024)
- ML20115H350 + (04:10:48, 13 December 2024)
- NRC-96-0071, Forwards Response to NRC Re Violations Noted in Insp Rept 50-341/96-04.C/A:developed Hydraulic Computer Models of SW Sys + (04:10:48, 13 December 2024)
- 05000237/LER-1984-024, :on 841207,secondary Containment Momentarily Broken.Cause Not Determined.Turbine Bldg Door Immediately Closed.No Problem W/Electrical Controls for Doors Discovered + (04:10:50, 13 December 2024)
- ML20115H341 + (04:10:51, 13 December 2024)
- 05000362/LER-1985-006-02, :on 850313,safety Injection Sys Automatically Actuated at RCS Pressure of 330 Psia.Caused by Unexpected Change in Position of Steam Bypass Valve.Design Change to Provide Demand/Actual Position Implemented + (04:10:53, 13 December 2024)
- ML20115H336 + (04:10:57, 13 December 2024)
- ML20115H333 + (04:10:58, 13 December 2024)
- ML20115H332 + (04:10:59, 13 December 2024)
- ML20115H330 + (04:10:59, 13 December 2024)
- ML20115H329 + (04:11:00, 13 December 2024)
- ML20115H327 + (04:11:01, 13 December 2024)
- ML20115H326 + (04:11:02, 13 December 2024)
- ML20115H324 + (04:11:03, 13 December 2024)
- ML20115H320 + (04:11:03, 13 December 2024)
- ML20115H316 + (04:11:05, 13 December 2024)
- 05000456/LER-1996-007-04, :on 960617,improper Placement of Spent Fuel. Caused by Personnel Error & Procedural and Mgt Deficiencies. Repositioned Fuel in Inappropiate Configuration & Counseled Personnel Involved + (04:11:07, 13 December 2024)
- 3F0796-14, Forwards Response to NRC Re Insp Rept 50-302/96-04.C/As:VP-580 Revised & Issued 960503 + (04:11:08, 13 December 2024)
- RC-96-0181, Requests That Change in Distribution of Various NRC Originated Documents Be Made Accordingly.Changes Listed + (04:11:08, 13 December 2024)
- 05000454/LER-1985-032, :on 850314,low Pressure Feedwater Heater Nonreturn Check Valve 14C Discovered Improperly Installed. Caused by Const Installation Error.Valve Reinstalled Correctly + (04:11:10, 13 December 2024)
- ML20115H300 + (04:11:11, 13 December 2024)
- ML20115H297 + (04:11:12, 13 December 2024)
- 05000483/LER-1984-028, :on 840813,inadvertent Safety Injection Occurred.Caused by Failed Redundant Pressure Loop Going Undetected Due to Failed Lamp on Partial Trip Status Panel. Lamp Replaced + (04:11:14, 13 December 2024)
- ML20115H289 + (04:11:15, 13 December 2024)
- 05000454/LER-1985-035, :on 850314,during Plant Recovery Following Loss of Offsite Power Test,Safety Injection Occurred Due to Low Steam Line Pressure.Caused by Operational Condition of Plant + (04:11:17, 13 December 2024)
- ML20115H284 + (04:11:18, 13 December 2024)
- ML20115H285 + (04:11:18, 13 December 2024)
- ML20115H280 + (04:11:19, 13 December 2024)
- ML20115H270 + (04:11:20, 13 December 2024)
- 05000458/LER-1996-013, :on 960617,Division I RCIC Isolation Occurred Due to Spurious Signal Generated from Failed Trip Unit. Failed Trip Was Replaced & RCIC Sys Was Restored to Operability 960618 + (04:11:24, 13 December 2024)
- ML20115H267 + (04:11:29, 13 December 2024)
- ML20115H261 + (04:11:30, 13 December 2024)
- JPN-96-034, Informs NRC of Util Decision to Reclassify Recirculation Pump mini-purge Sys as Essential Sys & of Plans to Modify Containment Isolation Design for Sys to Configuration Similar to Original Plant Design + (04:11:30, 13 December 2024)
- 0CAN079601, Forwards Response to Request for Addl Info Re GL 95-07, Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves + (04:11:31, 13 December 2024)
- ML20115H252 + (04:11:32, 13 December 2024)
- ML20115H249 + (04:11:33, 13 December 2024)
- ML20115H239 + (04:11:34, 13 December 2024)
- ML20115H236 + (04:11:35, 13 December 2024)
- ML20115H234 + (04:11:36, 13 December 2024)
- ML20115H230 + (04:11:37, 13 December 2024)
- TXX-9639, Provides NRC W/Comments on Preliminary Accident Sequence Precursor Analysis of Unit 1 Reactor Trip on 950601 + (04:11:38, 13 December 2024)
- ML20115H201 + (04:11:39, 13 December 2024)
- ML20115H222 + (04:11:39, 13 December 2024)