Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138J763 + (00:02:37, 12 December 2024)
- ML20138J760 + (00:02:38, 12 December 2024)
- 05000369/LER-1985-028-01, :on 850919,environmentally Sealed Valcor Model 526 Inside Containment Valve Failed.Caused by Ruptured Seal as Result of Improper Installation.Four Valves Resealed & Returned to Svc.New Design Being Studied + (00:02:40, 12 December 2024)
- ML20138J757 + (00:02:43, 12 December 2024)
- ML20138J754 + (00:02:44, 12 December 2024)
- ML20138J747 + (00:02:46, 12 December 2024)
- ML20138J751 + (00:02:46, 12 December 2024)
- ML20138J745 + (00:02:48, 12 December 2024)
- IR 05000315/1996009 + (00:02:51, 12 December 2024)
- ML20138J741 + (00:02:52, 12 December 2024)
- ML20138J733 + (00:02:53, 12 December 2024)
- ML20138J729 + (00:02:54, 12 December 2024)
- ML20138J727 + (00:02:59, 12 December 2024)
- ML20138J728 + (00:02:59, 12 December 2024)
- ML20138J724 + (00:03:00, 12 December 2024)
- ML20138J721 + (00:03:01, 12 December 2024)
- ML20138J720 + (00:03:02, 12 December 2024)
- ML20138J717 + (00:03:04, 12 December 2024)
- ML20138J716 + (00:03:05, 12 December 2024)
- ML20138J713 + (00:03:07, 12 December 2024)
- AECM-85-0346, Application for Amend to License NPF-29,revising Tech Spec 6.3.1 for one-time Exception of Reg Guide 1.8 Re Qualifications of Chemistry/Radiation Control Superintendent + (00:03:08, 12 December 2024)
- ML20138J708 + (00:03:10, 12 December 2024)
- VPN-037-97, Provides Supplemental Info on Planned Merger of Poges Parent Company,Portland General Corp W/Enron Corp. Stipulation,Also Encl + (00:03:11, 12 December 2024)
- ML20138J706 + (00:03:13, 12 December 2024)
- ML20138J701 + (00:03:14, 12 December 2024)
- 05000336/LER-1997-011-02, :on 970402,improperly Adjusted Dual Function Valves Occurred.Caused by Insufficient Program to Ensure, Facility Procedures Clearly Addressed All Related Design Basis Functions.Affected Valves Will Be Adjusted + (00:03:16, 12 December 2024)
- ML20138J695 + (00:03:18, 12 December 2024)
- ML20138J693 + (00:03:19, 12 December 2024)
- AECM-85-0401, Monthly Operating Rept for Nov 1985 + (00:03:20, 12 December 2024)
- ML20138J691 + (00:03:21, 12 December 2024)
- 05000336/LER-1997-011, Forwards LER 97-011-00,documenting Event Occurred at Unit 2 on 970402.Commitments Made within Ltr Listed + (00:03:22, 12 December 2024)
- ML20138J683 + (00:03:22, 12 December 2024)
- 05000362/LER-1985-034-01, :on 851114,Train a of Fuel Handling Isolation Sys Actuated on Loss of Power to Fuel Storage Pool Airborne Radiation Monitor 3RT7822.Caused by Loose Electric Lead.Lead Repaired + (00:03:25, 12 December 2024)
- ML20138J675 + (00:03:26, 12 December 2024)
- IR 05000395/1997001 + (00:04:04, 12 December 2024)
- ML20138J672 + (00:04:08, 12 December 2024)
- ML20138J667 + (00:04:10, 12 December 2024)
- ML20138J670 + (00:04:10, 12 December 2024)
- ML20138J666 + (00:04:11, 12 December 2024)
- ML20138J663 + (00:04:12, 12 December 2024)
- ML20138J662 + (00:04:14, 12 December 2024)
- ML20138J658 + (00:04:15, 12 December 2024)
- ML20138J655 + (00:04:16, 12 December 2024)
- ML20138J654 + (00:04:17, 12 December 2024)
- IR 05000266/1996017 + (00:04:18, 12 December 2024)
- ML20138J648 + (00:04:19, 12 December 2024)
- ML20138J642 + (00:04:21, 12 December 2024)
- ML20138J639 + (00:04:22, 12 December 2024)
- ML20138J638 + (00:04:23, 12 December 2024)
- ML20138J636 + (00:04:25, 12 December 2024)
- ML20138J631 + (00:04:26, 12 December 2024)