Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20112H535 + (ML20112H535)
- ML20112H536 + (ML20112H536)
- ML20112H540 + (ML20112H540)
- ML20112H542 + (ML20112H542)
- ML20112H544 + (ML20112H544)
- ML20112H550 + (ML20112H550)
- ML20112H552 + (ML20112H552)
- ML20112H553 + (ML20112H553)
- ML20112H555 + (ML20112H555)
- ML20112H557 + (ML20112H557)
- ML20112H559 + (ML20112H559)
- ML20112H560 + (ML20112H560)
- ML20112H562 + (ML20112H562)
- ML20112H565 + (ML20112H565)
- ML20112H574 + (ML20112H574)
- BECO-85-061, Forwards Final Rept of Inservice Insps Conducted During 1984 & Refueling Outage 6.Results of Mechanized,Manual,Surface & Direct Visual Exams Summarized in Encl Exam Summary Rept. Final Rept Contains 26 Vols + (ML20112H587)
- L-84-240, Forwards Written Responses & Ref Matls to Substantiate Statements Made During 840907 Exit Interview Re Reactor & Senior Reactor Operating Exams on 840905 + (ML20112H594)
- ML20112H595 + (ML20112H595)
- ML20112H601 + (ML20112H601)
- ML20112H605 + (ML20112H605)
- 05000361/LER-1984-077, :on 841210,control Room Isolation Sys (Cris) Train B Inadvertently Actuated While Instrumentation & Control Technicians Performed 31-day Surveillance.Caused by Failure to Fully Depress Cris Switch + (ML20112H612)
- ML20112H616 + (ML20112H616)
- ML20112H618 + (ML20112H618)
- ML20112H619 + (ML20112H619)
- 05000271/LER-1984-024, :on 841213,functional Testing of HPCI-torus Water Level Sys Not Performed During Wk of 841001.Caused by Inadvertent Administrative Oversight in Scheduling. Surveillance Procedures Revised + (ML20112H621)
- 05000325/LER-1984-035, :on 841211,rod Position Indication Sys Bypass Switch for Control Rod Bypassed to full-in Position.Caused by Personnel Miscommunications.Signs Posted to Reflect Revised Limiting Condition for Operation + (ML20112H622)
- 05000237/LER-1984-023-05, :on 841214,torus-to-condenser Drain Valve AO 2-1599-61 Leaked 121 Scfh.Cause Unknown.Valve Repaired & Will Be Leak Rate Tested Prior to Return to Svc + (ML20112H624)
- 05000334/LER-1984-016, :on 841027,due to Metal Filings Found in Seismic Sensor,Spare Defective Sensor Used.Defective Sensor Returned to Vendor for Repair But Not Returned to Util within 90 Days.Caused by Personnel Error + (ML20112H628)
- ML20112H635 + (ML20112H635)
- ML20112H637 + (ML20112H637)
- ML20112H641 + (ML20112H641)
- 05000325/LER-1984-036, :on 841211,12,17,18 & 850101,control Bldg HVAC Sys Manually Isolated Due to High Chlorine Alarms from Chlorination Sys Chlorine Detectors.Caused by Minute Chlorine Gas Leaks & Residual Chlorine + (ML20112H653)
- U-602594, Monthly Operating Rept for May 1996 for Clinton Power Station,Unit 1 + (ML20112H654)
- 05000346/LER-1984-020, :on 841204,inoperable Fire Dampers Found.Caused by Melted Fusible Links,Blades Binding on Frame,Missing Blade,Backward Installation,Dirt & Spring Problems.Fire Watch Established + (ML20112H659)
- NSD-NRC-96-4743, Forwards Info Required for Closure Re Status of Dser Open Items & RAIs to leak-before-break + (ML20112H660)
- ML20112H661 + (ML20112H661)
- ML20112H669 + (ML20112H669)
- 05000352/LER-1984-032, :on 841211,reactor Water Cleanup Inboard Suction Valve Closed to Isolation Position Upon Receiving High Ambient Temp Signal.Caused by Personnel Error.Sys Returned to Svc + (ML20112H673)
- 05000281/LER-1984-018-02, :on 841211,spurious Reactor Trip Occurred. Caused by 2 of 3 Logic Matrix for High Pressurizer Level Actuating.Addl Administrative Controls for Work on Energized Components Initiated + (ML20112H675)
- 05000275/LER-1984-034, :on 841215,diesel Generator Started Automatically.Caused by Personnel Error.Memo Issued Instructing All Operators to Verify New Source Before Opening Original Source Breaker + (ML20112H678)
- 05000281/LER-1984-019-02, :on 841211,reactor Trip Occurred.Caused by Low Condenser Vacuum Due to Leak in Moisture Separator Reheater Crossunder Manway Gasket.Manway Temporarily Sealed,Gasket Replaced & Procedure Revised + (ML20112H682)
- 05000374/LER-1984-085-01, :on 841214,reactor Scram & Turbine Trip Occurred.Caused by Vibration Trip Signal from Loose Circuit Board Connection in Turbine Supervisory Sys.Vibration Card Reinstalled + (ML20112H689)
- 05000317/LER-1984-019, :on 841212,MSIV Failed to Fully Close During Surveillance Testing.Caused by Faulty Contacts in Control Room Handswitch.Contacts,Restrictor Valves & Solenoid Pilot Valves Replaced + (ML20112H693)
- 05000317/LER-1984-018, :on 841203,MSIV Inoperable.Caused by Oil Leakage from Piston Rod Seal & Damaged Actuator Overall Piston Seals.Seals Replaced + (ML20112H697)
- ML20112H720 + (ML20112H720)
- ML20112H722 + (ML20112H722)
- ML20112H724 + (ML20112H724)
- ML20112H736 + (ML20112H736)
- ML20112H768 + (ML20112H768)
- 05000272/LER-1984-011, :on 840503,fire Suppression Pump 2 Removed from Svc for 18-month Surveillance.Discharge Valve 2FP13 Could Not Be Opened When Returning Pump to Svc on 840509.Caused by Disc/Stem Separation.Pump in Svc on 840510 + (ML20112H774)
- ML20112H777 + (ML20112H777)