Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20092N859 + (ML20092N859)
- B11228, Forwards Rev 2 to Updated FSAR + (ML20092N863)
- ML20092N871 + (ML20092N871)
- ML20092N876 + (ML20092N876)
- ML20092N889 + (ML20092N889)
- ML20092N894 + (ML20092N894)
- ML20092N900 + (ML20092N900)
- ML20092N901 + (ML20092N901)
- 0CAN058412, Submits Updated Status of Efforts to Implement Final Phase of Upgrade to Security Sys.Original Schedule Submitted on 830219.Addl 60 man-months Required to Complete Software Development + (ML20092N913)
- ML20092N917 + (ML20092N917)
- 0CAN058402, Annual Environ Radiological Monitoring Rept,1983 + (ML20092N919)
- ML20092N921 + (ML20092N921)
- ML20092N922 + (ML20092N922)
- ML20092N929 + (ML20092N929)
- ML20092N930 + (ML20092N930)
- NLS8400092, Repsonds to NRC Re Violations Noted in IE Insp Rept 50-298/83-28.Corrective Actions Withheld (Ref 10CFR73.21) + (ML20092N933)
- ML20092N941 + (ML20092N941)
- ML20092N961 + (ML20092N961)
- ML20092N962 + (ML20092N962)
- ML20092N976 + (ML20092N976)
- 05000482/LER-2020-001, Shutdown Due to Inoperable Containment Purge Isolation Valves + (ML20092N985)
- ML20092N999 + (ML20092N999)
- ML20092P025 + (ML20092P025)
- ML20092P027 + (ML20092P027)
- ML20092P056 + (ML20092P056)
- RS-20-046, Emergency License Amendment Request - Increase Technical Specifications Allowable MSIV Leakage Rates in TS 3.6.1.3 + (ML20092P079)
- ML20092P092 + (ML20092P092)
- ML20092P095 + (ML20092P095)
- ML20092P097 + (ML20092P097)
- ML20092P151 + (ML20092P151)
- ML20092P153 + (ML20092P153)
- AECM-84-0326, Describes Design Change Problems & Provides Commitment Dates for Resolution of Tech Spec Problem Sheets,Per Review + (ML20092P154)
- PLA-2229, Ro:On 840528,turbine Bypass Valve Malfunctioned,Causing Reactor to Exceed Max Allowable Power of 5% by 0.9%.Caused by Debris Found in Turbine Bypass Valve.Control Rods Inserted + (ML20092P155)
- ML20092P156 + (ML20092P156)
- ML20092P159 + (ML20092P159)
- ML20092P161 + (ML20092P161)
- ML20092P162 + (ML20092P162)
- ML20092P164 + (ML20092P164)
- ML20092P167 + (ML20092P167)
- ML20092P177 + (ML20092P177)
- W3P84-1805, Forwards Proposed FSAR Chapter 14 Changes Re Venting of Sys During Hydrostatic Testing & Testing of nonsafety-related Supplementary Chilled Water Sys.Changes Will Be Incorporated in Future FSAR Amend + (ML20092P180)
- ML20092P182 + (ML20092P182)
- AECM-84-0127, Responds to NRC Re Violations Noted in IE Insp Repts 50-416/84-01 & 50-417/84-02.Corrective Actions:Rev to Emergency Plan Procedure 10-S-01-05, General Emergency, Prepared for Issuance by 840615 + (ML20092P194)
- 05000280/LER-1984-015, :on 840613,control Room Operator Observed Loss of Main Feed Pump a & Lowering of Steam Generator Water Levels.Caused by Loosening of Bearing Capscrews.Capscrew & Bolt Torque Specified in Maint Procedure + (ML20092P197)
- AECM-84-0181, Responds to NRC Re Violations Noted in IE Insp Repts 50-416/84-01 & 50-417/84-02.Corrective Actions: Emergency Plan Procedure 10-S-01-05, General Emergency, Revised + (ML20092P203)
- ML20092P204 + (ML20092P204)
- ML20092P205 + (ML20092P205)
- ML20092P208 + (ML20092P208)
- ML20092P209 + (ML20092P209)
- ML20092P210 + (ML20092P210)
- ML20092P211 + (ML20092P211)