Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212E081 +
- HL-1778, Forwards Owners Data Rept (NIS-1) for Inservice Insp, Ei Hatch Nuclear Plant Unit 2,Dec 1989-June 1991. No Reportable Indications Detected in Seven Welds in nonsafety- Related RWCU Sys,Per Generic Ltr 88-01 +
- 1CAN099907, Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative +
- IR 05000336/2017004 +
- L-96-018, Rev 1 to INEL-96/0188, TER on Third 10-Yr Interval Inservice Insp Program Plan:Gpc,Ei Hatch Nuclear Plant Units 1 & 2 +
- ML20217J531 +
- ML20217P807 +
- ML20236L704 +
- ML20236D814 +
- ML20217A721 +
- ML20236L752 +
- NOC-AE-000104, Requests Relief from IWA 5250 of Section XI of ASME Boiler & Pressure Vessel Code (ASME XI) in Order to Defer Code Repair of Flaw Recently Identified in Essential Cooling Water Sys Class 3 Piping,Per GL 90-05 +
- ML17229A614 +
- ML20236Q313 +
- ML20076F988 +
- ML20076F002 +
- ML20197F126 +
- ML20217E745 +
- ML20216G869 +
- ML20211J932 +
- BSEP-99-0128, Forwards Revised Relief Request RR-17,applicable to Remainder of Third 10-year ISI Program for Plant +
- A97014, Responds to RAI Re Third Interval ISI Relief Request CR-13 & New Relief Request CR-23 +
- L-MT-04-050, Fourth Interval Inservice Inspection Examination Plan, Revision 2 +
- BSEP-99-0110, Forwards Rev 0 to ESR 99-00279, B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, IAW Subparagraph IWB-3144(b) of 1989 Edition of ASME B&PV Code, Section XI +
- ML18151A901 +
- ML022760172 +
- ML20210K256 +
- ML20210M858 +
- ML11356A291 +
- ML20210P111 +
- JPN-98-042, Provides Response to Request for Addl Info Re Inservice Insp Program Relief Requests.Commitments Made by Util in Ltr Listed on Attachment II +
- ML20211A420 +
- ML20211B534 +
- ML20211D267 +
- ML20211J923 +
- ML20209H395 +
- LIC-99-0016, Requests Relief from Certain Requirements of Paragraphs IWA- 5242(a) & IWA-5250(a)(2) of ASME Section Xi,For Remainder of Third 10-year Insp Interval on Basis of Attached Proposed Alternatives +
- 3F0599-05, Responds to 990402 RAI Re Third 10-year Interval ISI Program Plan Requests for Relief.Util Revised Relief Requests 98-010-II,98-003-PT,98-005-PT & 98-001-SS Based on Responses to Rai.Revised Relief Requests Encl +
- BSEP-99-0069, Discusses Rev of Relief Request RR-17, Leakage at Bolted Connections, for ISI Program for Third ten-yr Interval.Util & NRC Were Unable to Reach Agreement Re Use of ASME Code Case N-566-1 as Permanent Basis for Relief Request RR-17 +
- L-2015-040, Submittal of Fifth 10 Year Interval Inservice Inspection (ISI) Program Plan +
- ML20206D176 +
- LIC-96-0017, Notifies NRC of Implementation of Alternate Methods for Determining Integrity of Waste Disposal Sys Components/ Piping,Including Solid Waste Disposal,Liquid Waste Disposal & Gaseous Waste Disposal +
- ML020860693 +
- ML022610153 +
- ML20205Q758 +
- ML20205D606 +
- NRC Inspection Manual 0326, Operability Determinations & Functionality Assessments for Conditions Adverse to Quality of Safety +
- ML20204G383 +
- ML20204D727 +
- ML19197A140 +