Constellation~
SVP-24-039 June 12, 2024 Regional Administrator, Region Ill U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352
Subject:
Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Submittal of Initial Operator Licensing Examination Results Documentation Enclosed are the examination results that Quad Cities Nuclear Power Station (QCNPS) is submitting to show the results of the Initial Operator Licensing Exams conducted between May 28, 2024, and June 7, 2024, at QCNPS.
The written exam grading has been reviewed for all twelve (12) licensed operator candidates and there were no corrections needed from the automatic grading system. QCNPS believes that all twelve (12) candidates have passed the exam.
In accordance with NUREG-1021, Revision 12, Section ES-1.3, please ensure that these materials are withheld from public disclosure until 2 years have elapsed so the material may be used in a future certification exam.
Should you have any questions concerning this letter, please contact Travis Kelley, Senior Operations Training Instructor, at (309) 227-4066 or Sean Sullivan, Manager Operations Training at (309)-227-4014.
Ref(
Amarnath Kouta Acting Senior Manager Operations Support & Services Quad Cities Nuclear Power Station
Enclosures:
Initial License Exam Results Material cc:
Chief, NRC Operator Licensing Branch - NRC Region Ill (w/o enclosures)
NRC Senior Resident Inspector - Quad Cities Nuclear Power Station (w/o enclosures)
SVP-24-039 U. S. Nuclear Regulatory Commission bee:
Robert Kuntz, NRC Project Manager - NRR Robert.Kuntz@NRC.gov (ECopy w/o enclosures)
Kevin Lueschen, Director, Licensing and Regulatory Affairs - Cantera (ECopy w/o enclosures)
Mark Humphrey, Manager, Licensing, Dresden and Quad Cities Stations (ECopy w/o enclosures)
Dave Gullett, Vice President - Licensing and Regulated (ECopy w/o enclosures)
Travis Kelley, Training - Quad Cities Nuclear Power Station (ECopy w/o enclosures)
Sean Sullivan, Training - Quad Cities Nuclear Power Station (ECopy w/o enclosures)
Constellation Document Control Desk - Licensing (ECopy to clerical w/o enclosures)
Conner Bealer, Regulatory Assurance Manager - Quad Cities Nuclear Power Station (ECopy w/o enclosures)
Ryan Merema, Acting Training Director - Quad Cities Nuclear Power Station (ECopy w/o enclosures)
Amar Kouta, Acting SR Mg Ops Support & Services - Quad Cities Nuclear Power Station (ECopy w/o enclosures Rick Swart, NRC Coordinator - Quad Cities Nuclear Power Station (Electronic Copy w/o enclosures)
Doug Hild, Site Vice President - QCNPS (ecopy w/o enclosures)
Drew Griffiths, Plant Manager - QCNPS (Ecopy w/o enclosures)
SVP Letter File - Q:/SVP Reg Assurance Clerk (copy for records turnover w/o enclosures)