SVP-24-024, Corrected Radioactive Effluent Release Report for 2022

From kanterella
Jump to navigation Jump to search
Corrected Radioactive Effluent Release Report for 2022
ML24099A050
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 04/05/2024
From: Hild D
Constellation Energy Generation
To:
Office of Nuclear Material Safety and Safeguards, Document Control Desk, Office of Nuclear Reactor Regulation
References
SVP-24-024
Download: ML24099A050 (1)


Text

Constellation~

SVP-24-024 April 5, 2024 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265

Subject:

Corrected Radioactive Effluent Release Report for 2022 10 CFR 50.36a

Reference:

Letter from Brian Wake (Constellation Energy Generation, LLC) to the U.S.

NRC (Regional Administrator, Region Ill), "Radioactive Effluent Release Report for 2022," dated April 28, 2023.

Pursuant to Technical Specifications Section 5.6.3 and 10 CFR 50.36a, enclosed is the Quad Cities Nuclear Power Station Radioactive Effluent Release Report for January through December 2022. This follow-up information is the second submittal of errata for the 2022 Annual Radioactive Effluent Release Report. Data will replace the Radioactive Effluent Release Report submitted under the April 28, 2023 letter.

Should you have any questions concerning this letter, please contact Blake Young at (309) 227-3200.

ReiJ~tP Doug Hild Site Vice President Quad Cities Nuclear Power Station Attachments:

1. Corrected 2022 Annual Radioactive Effluent Release Report cc:

Regional Administrator - NRC Region 111 NRC Senior Resident Inspector - Quad Cities Nuclear Power Station Corrected 2022 Annual Radioactive Effluent Release Report

Errata/Correction to the 2022 Annual Radioactive Effluent Release Report

Errata/Correction to the 2022 ARERR The following paragraph explains the errata data that has been identified for the 2022 ARERR:

Multiple data errors were identified in the 2022 Annual Radiological Effluent Release Report for the summation of all gaseous releases, as well as batch liquid releases. The data errors were observed in the following sections of the report:

All four quarters of fission and activation gases and the associated annual total, ist Quarter gaseous particulates and associated annual totals, 4th Quarter Tritium and Carbon-14 results and associated annual totals, and 3rd and 4th Quarters percent of organ dose limit.

The 2nd Quarter batch liquid release was updated to include Fe-55 results and the updated annual totals.

Information for the total liquid batch releases were updated including, total time, maximum time, average time, and minimum time.

To reflect the updates for the continuous gaseous releases, Total Body dose, Organ dose, and Carbon-14 dose to total body and organ and percentages were all updated for Gaseous Dose to a Member of the Public.

The updates to both the gaseous and liquid data also updated the 40 CFR 190 Direct Radiation Dose to a Member of the Public for Total Body, Organ, and Thyroid dose and the associated 40CFR190 percent of limits.

All updates listed above reflect the changes in the 10CFR20.1301(a)(l) Compliance Assessment. Unit 1, Quarter 3 and associated Percent of Limit and Unit 2, Quarter 4, Year Total, and associated Percent of Limit were updated.

Quad Cities Nuclear Power Station 2022 Annual Radioactive Effluent Release Report Effluent & Waste Disposable Summary Gaseous Effluents - Summation of all Releases Period: January-December 2022 A. Fission & Activation Gases

1. Total Release
2. Average release rate for the period
3. Percent of ODCM limit (11 B. Iodine
1. Total Iodine - 131
2. Average release rate for the period
3. Percent of ODCM limit C. Particulates 131
1. Particulates with half-lives >8 days
2. Average release rate for the period
3. Percent of ODCM limit
4. Gross alpha radioactivity D. Tritium
1. Total Release 2.Average release rate for the period
3. Percent of ODCM limit E. Carbon -14
1. Total Release
2. Average release rate for the period
3. Percent of ODCM Limit F. Iodine 131 & 133, Tritium, Particulate, and C-14 Unit Ci

µCi/sec

%y

%~

Ci

µCi/sec Ci

µCi/sec Ci Ci

µCi/sec Ci

µCi/sec Unit: 1 & 2 Quarter 1 Quarter2 Quarter 3 1.22E+0l l.43E+0l l.88E+01 1.57E+00 1.82E+00 2.36E+00 2.24E-03 2.19E-03 2.65E-03 1.37E-04 2.35E-04 S.20E-04 1.22E-05

<LLD(4}

<LLD(4) 1.57E-06

<LLD(4)

<LLD(4)

N/A N/A N/A 4.87E-04 4.21E-04 1.00E-04 6.26E-05 S.36E-05 1.26E-05 N/A N/A N/A

<LLD(4)

<LLD(4)

<LLD(4) 1.67E+01 1.84E+0l 2.24E+0l 2.lSE+00 2.34E+00 2.81E+00 N/A N/A N/A 6.76E+OO 6.44E+OO 7.48E+OO 8.69E-01 8.19E-01 9.41E-01 N/A N/A N/A Quarter4 1.58E+01 1.99E+00 2.52E-03 3.45E-04 2.36E-05 2.97E-06 N/A 2.l0E-04 2.64E-05 N/A

<LLD(4) 1.S0E+0l 1.88E+00 N/A 5.24E+OO 6.59E-01 N/A

1. Percent of ODCM Organ Dose Limit I 6.34E-01 I 6.0SE-01 I 6.96E-01 I 5.59E-01 I (1) % Noble gas gamma/noble gas beta dose limits (2) Percent of ODCM Limit is captured in aggregate in section F Total 6.11E+0l 3.58E-05 1.22E-03 7.2SE+0l 2.59E+0l (3) Nuclides with less than 8-day half-lives are not included per the ODCM, with the exception of La-140 and Mo-99 (4) Gaseous Effluent LLDs reported on page 9 of 78 1 of78 Est. Total Error%

12.7 I

41.7 I

I 32.2 I

I 6.3 I

I

Quad Cities Nuclear Power Station 2022 Annual Radioactive Effluent Release Report Effluent & Waste Disposable Summary Gaseous Effluents - Summation of all Releases Period: January-December 2022 A. Fission & Activation Gases

1. Total Release
2. Average release rate for the period
3. Percent of ODCM limit (ll B. Iodine
1. Total Iodine - 131
2. Average release rate for the period
3. Percent of ODCM limit C. Particulates 131
1. Particulates with half-lives >8 days
2. Average release rate for the period
3. Percent of ODCM limit
4. Gross alpha radioactivity D. Tritium
1. Total Release 2.Average release rate for the period
3. Percent of ODCM limit E. Carbon - 14
1. Total Release
2. Average release rate for the period
3. Percent of ODCM Limit F. Iodine 131 & 133, Tritium, Particulate, and C-14 Unit Ci

µCi/sec

%y

%J3 Ci

µCi/sec Ci

µCi/sec Ci Ci

µCi/sec Ci

µCi/sec Unit: 1 & 2 Quarter 1 Quarter 2 Quarter 3 l.26E+0l 1.44E+0l l.91E+0l l.62E+00 1.83E+00 2.34E+00 4.46E-03 4.40E-03 S.32E-03 2.77E-04 4.71E-04 l.04E-03 l.22E-0S

<LLD(4)

<LLD(4) l.57E-06

<LLD(4)

<LLD(4)

N/A N/A N/A 3.98E-04 4.21E-04 l.00E-04 6.26E-0S S.36E-05 l.26E-0S N/A N/A N/A

<LLD(4)

<LLD(4)

<LLD(4) l.67E+0l l.84E+0l 2.24E+0l 2.lSE+00 2.34E+00 2.81E+00 N/A N/A N/A 6.76E+00 6.44E+00 7.48E+00 8.69E-01 8.19E-01 9.41E-01 N/A N/A N/A Quarter 4 2.0lE+0l 2.53E+00 S.28E-03 l.16E-03 2.36E-0S 2.97E-06 N/A 2.lOE-04 2.64E-0S N/A

<LLD(4) 2.00E+0l l.88E+00 N/A 7.44E+00 9.36E-01 N/A

1. Percent of ODCM Organ Dose Limit I 6.34E-01 I 6.0SE-01 I 6.91E-01 I 6.92E-01 I (1) % Noble gas gamma/noble gas beta dose limits (2) Percent of ODCM Limit is captured in aggregate in section F Total 6.61E+0l 3.SBE-05 l.22E-03 7.75E+0l 2.81E+0l (3) Nuclides with less than 8-day half-lives are not included per the ODCM, with the exception of La-140 and Mo-99 (4) Gaseous Effluent LLDs reported on page 9 of 78 1 of 78 Est.

Total Error%

12.7 I

41.7 I

I 32.2 I I I

I 6.3 I I I

I

Quad Cities Nuclear Power Station 2022 Annual Radioactive Effluent Release Report Effluent & Waste Disposable Summary Gaseous Effluents Release Point Main Chimney (Elevated) Continuous Mode Period: January-December 2022 Unit: 1 & 2 Continuous Mode Nuclides Released Jan - Mar 2022 Apr - Jun 2022 Jul - Sep 2022 Oct - Dec 2022

1. FISSION AND ACTIVATION GASES: Curies Ar-41 7.85E-01 3.63E-01 1.12E+00 3.74E-01 Kr-85m 6.03E-02 1.82E-01 1.75E-01 1.34E-01 Kr-85

<LLD <11 2.69E+o0

<LLD Ill

<LLD Ill Kr-87 2.SGE-01 5.0lE-01 4.27E-01 3.89E-01 Kr-88 1.58E-01 4.97E-01 4.0SE-01 3.lSE-01 Xe-133m

<LLD <1>

1.36E-03 1.39E-03 5.84E-04 Xe-133 2.02E-01 1.84E-01 1.07E+00 1.32E+00 Xe-135m 1.66E+o0 1.67E+00 1.87E+00 1.99E+00 Xe-135 2.98E+o0 7.0SE-01 6.47E-01 S.09E-01 Xe-138 6.l0E+00 S.89E+00 6.46E+00 7.19E+OO Total for Period 1.22E+01 1.27E+0l 1.22E+0l 1.22E+01

2. IODINES: Curies 1-131 1.22E-05

<LLD Ill

<LLD Ill 2.36E-05 1-133 1.SlE-04

<LLD <11

<LLD(l) 1.71E-04 1-135

<LLD 111

<LLD <11

<LLD <1>

<LLD <11 Total for Period 1.63E-04

<LLD 111

<LLD 111 1.95E-04

3. PARTICULATES WITH HALF-LIVES> 8 DAYS (Zl: Curies Cr-51

<LLD 111

<LLD 111

<LLD 111 Mn-54

<LLD Ill

<LLD 111

<LLD 111 Fe-55

<LLD 111

<LLD 111

<LLD 111 Fe-59

<LLD Ill

<LLD Ill

<LLD(l)

Co-58

<LLD Ill

<LLD Ill

<LLD(l)

Co-60 3.00E-05 8.87E-05 7.90E-06 Ni-63

<LLD <11

<LLD 111

<LLD l1l Zn-65

<LLD 111

<LLD 111

<LLD 111 Sr-89

<LLD 111

<LLD 111

<LLD 111 Sr-90

<LLD Ill

<LLD Ill

<LLD Ill Zr/Nb-95(3)

<LLD Ill

<LLD Ill

<LLD Ill Mo-99

<LLD <11

<LLD <11

<LLD <11 Ag-110m

<LLD <1>

<LLD Ill

<LLD (ll Cs-134

<LLD <1>

<LLD Ill

<LLD Ill Cs-137

<LLD <11

<LLD <1>

<LLD Ill Ba/La -140(3)

<LLD <1>

<LLD Ill

<LLD fll Ce-141

<LLD 111

<LLD Ill

<LLD Ill "Ce-144

<LLD Ill

<LLD Ill

<LLD Ill Total for Period 3.00E-05 8.87E-0S 7.90E-06

4. CARBON - 14: Curies C-14 6.SSE+00 6.25E+00 7.2SE+00
5. TRITIUM: Curies H-3 1.4SE+01 1.56E+01 1.97E+01
6. GROSS ALPHA: Curies Gross Alpha

<LLD <11

<LLD 11>

<LLD 111 (1) Gaseous LLDs reported on page 9 of 78 (2) Includes La-140 and Mo-99 per the ODCM (3) Equilibrium assumed, i.e., value for each nuclide is1/2 of total 2 of78

<LLD 11>

<LLD <11

<LLD 111

<LLD Ill

<LLD Ill 2.34E-05

<LLD Ill

<LLD Ill

<LLD Ill

<LLDll)

<LLD <1>

<LLD Ill

<LLD 11>

<LLD 111

<LLD (l}

<LLD fll

<LLD 111

<LLD 111 2.34E-05 5.02E+00 1.16E+0l

<LLD Ill Total 2.64E+00 5.SlE-01 2.69E+00 1.57E+00 1.38E+00 3.33E-03 2.78E+00 7.19E+00 4.84E+00 2.56E+0l 4.93E+01 3.SBE-05 3.22E-04

<LLD <1>

3.SSE-04

<LLD Ill

<LLD 111

<LLD 111

<LLD Ill

<LLD 11>

1.S0E-04

<LLD 11>

<LLD Ill

<LLD 111

<LLD 11>

<LLD 111

<LLD {l)

<LLD 11>

<LLD <1>

<LLD Ill

<LLD 11>

<LLD Ill

<LLD Ill 1.S0E-04 2.SlE+0l 6.14E+0l

<LLD <1l

Quad Cities Nuclear Power Station 2022 Annual Radioactive Effluent Release Report Effluent & Waste Disposable Summary Gaseous Effluents Release Point Main Chimney (Elevated) Continuous Mode Period: January-December 2022 Unit: 1 & 2 Continuous Mode Nuclides Released Jan - Mar 2022 Apr - Jun 2022 Jul - Sep 2022 Oct - Dec 2022

1. FISSION AND ACTIVATION GASES: Curies Ar-41 7.SSE-01 3.63E-01 l.12E+00 3.74E-01 Kr-85m 6.03E-02 l.82E-01 l.76E-01 l.34E-01 Kr-85 3.92E-01 2.69E+00 3.0SE-01 2.07E-01 Kr-87 2.SGE-01 5.35E-01 4.29E-01 3.89E-01 Kr-88 l.SSE-01 4.97E-01 4.0GE-01 3.lSE-01 Xe-133m

<LLD 111 2.17E-03 2.46E-03 l.45E-03 Xe-133 2.02E-01 l.84E-01 l.07E+00 l.32E+00 Xe-13Sm l.66E+00 l.67E+00 l.87E+00 l.99E+00 Xe-135 2.98E+00 7.0SE-01 6.49E-01 5.09E-01 Xe-138 6.07E+00 5.89E+00 6.49E+00 7.19E+00 Total for Period l.26E+0l l.27E+0l l.25E+0l l.24E+0l

2. IODINES: Curies 1-131 l.22E-05

<LLD 111

<LLD 111 2.36E-05 1-133 l.SlE-04

<LLD 111

<LLD 111 2.13E-04 1-135

<LLD 111

<LLD 111

<LLD 111

<LLD 111 Total for Period l.63E-04

<LLD 111

<LLD 111 2.37E-04

3. PARTICULATES WITH HALF-LIVES> 8 DAYS 121: Curies Cr-51

<LLD 111

<LLD 111

<LLD 111 Mn-54

<LLD 111

<LLD 111

<LLD 111 Fe-55

<LLD 111

<LLD 111

<LLD 111 Fe-59

<LLD 111

<LLD 111

<LLD 111 Co-58

<LLD 111

<LLD 111

<LLD 111 Co-60 3.00E-05 8.69E-05 7.90E-06 Ni-63

<LLD 111

<LLD 111

<LLD 111 Zn-65

<LLD Ill

<LLD 111

<LLD 111 Sr-89

<LLD Ill

<LLD 111

<LLD 111 Sr-90

<LLD 111

<LLD 111

<LLD 111 Zr/Nb-95(3)

<LLD 111

<LLD 111

<LLD 111 Mo-99

<LLD 111

<LLD 111

<LLD 111 Ag-llOm

<LLD 111

<LLD 111

<LLD 111 Cs-134

<LLD 111

<LLD 111

<LLD 111 Cs-137

<LLD 111

<LLD 111

<LLD 111 Ba/La -140(3)

<LLD 111

<LLD 111

<LLD 111 Ce-141

<LLD 111

<LLD 111

<LLD 111 Ce-144

<LLD Ill

<LLD Ill

<LLD 111 Total for Period 3.00E-05 8.69E-05 7.90E-06

4. CARBON - 14: Curies C-14 6.SSE+00 6.25E+00 7.25E+00
5. TRITIUM: Curies H-3 l.45E+0l 1.56E+0l l.97E+0l
6. GROSS ALPHA: Curies Gross Alpha

<LLD 111

<LLD 111

<LLD 111 (1) Gaseous LLDs reported on page 9 of 78 (2) Includes La-140 and Mo-99 per the ODCM (3) Equilibrium assumed, i.e., value for each nuclide is1/2 of total 2 of78

<LLD 111

<LLD Ill

<LLD 111

<LLD 111

<LLD 111 2.34E-05

<LLD 111

<LLD 111

<LLD 111

<LLD 111

<LLD 111

<LLD 111

<LLD 111

<LLD 111

<LLD 111

<LLD 111

<LLD 111

<LLD Ill 2.34E-05 7.22E+00 l.66E+0l

<LLD 111 Total 2.64E+00 5.52E-01 3.60E+00 l.61E+00 l.38E+00 6.0SE-03 2.78E+00 7.19E+00 4.8SE+00 2.56E+0l 5.02E+0l 3.SSE-05 3.64E-04

<LLD 111 4.00E-04

<LLD 111

<LLD Ill

<LLD Ill

<LLD Ill

<LLD Ill l.48E-04

<LLD 111

<LLD 111

<LLD 111

<LLD Ill

<LLD Ill

<LLD Ill

<LLD Ill

<LLD 111

<LLD Ill

<LLD Ill

<LLD Ill

<LLD 111 l.48E-04 I

2.73E+0l I

6.64E+0l I

<LLD Ill

Quad Cities Nuclear Power Station 2022 Annual Radioactive Effluent Release Report Effluent & Waste Disposable Summary Gaseous Effluents Release Point Reactor Vent (Mixed Mode) Continuous Mode Period: January w December 2022 Unit: 1 & 2 Continuous Mode Nuclides Released Jan - Mar 2022 Apr -Jun 2022 Jul-Sep 2022 Oct - Dec 2022

1. FISSION AND ACTIVATION GASES: Curies Ar-41

<LLD <11

<LLD Ill

<LLD Ill

<LLD 111 Kr-8Sm

<LLD Ill

<LLD 111

<LLD Ill

<LLD Ill Kr-85

<LLD Ill

<LLD Ill

<LLD 11>

<LLD 111 Kr-87

<LLD <1l

<LLD Ill

<LLD 111

<LLD Ill Kr-88

<LLD (l}

<LLD <11

<LLD 111

<LLD Ill Xe-133

<LLD 111 1.65E+00 6.61E+00 3.56E+00 Xe-135m

<LLD Ill

<LLD Ill

<LLD 11>

<LLD Ill Xe-135

<LLD Ill

<LLD <11

<LLD Ill

<LLD 111 Xe-138

<LLD Ill

<LLD Ill

<LLD Ill

<LLD 11>

Total for Period

<LLD Ill 1.65E+00 6.61E+00 3.56E+00

2. IODINES: Curies 1-131

<LLD <1>

<LLD fll

<LLD 111

<LLD Ill 1-133

<LLD Ill

<LLD Ill

<LLD Ill

<LLD 111 1-135

<LLD Ill

<LLD 111

<LLD Ill

<LLD 111 Total for Period

<LLD 111

<LLD Ill

<LLD Ill

<LLD (l}

3. PARTICULATES WITH HALF-LIVES> 8 DAYS (2): Curies Cr-51

<LLD 11>

<LLD Ill

<LLD (1)

Mn-54 1.00E-04 8.33E-05 1.28E-05 Fe-55

<LLD 11>

<LLD 111

<LLD (1)

Fe-59

<LLD fll

<LLD 111

<LLD (1)

Co-58

<LLD 111

<LLD 111

<LLD (1)

Co-60 2.68E-04 2.49E-04 7.97E-05 Ni-63

<LLD (l)

<LLD <1>

<LLD (1)

Zn-65

<LLD (ll

<LLD Ill

<LLD (1)

Sr-89

<LLD 111

<LLD fll

<LLD (1)

Sr-90

<LLD 111

<LLD 111

<LLD (1)

Zr/Nb-95(3)

<LLD 111

<LLD Ill

<LLD (1)

Mo-99

<LLD Ill

<LLD Ill

<LLD (1)

Ag-110m

<LLD Ill

<LLD (ll

<LLD (1)

Cs-134

<LLD 111

<LLD 111

<LLD (1)

Cs-137

<LLD (l)

<LLD 11>

<LLD (1)

Ba/La-140(3)

<LLD Ill

<LLD 111

<LLD (1)

Ce-141

<LLD 111

<LLD <1>

<LLD (1)

Ce-144

<LLD Ill

<LLD Ill

<LLD (1)

Total for Period 3.GSE-04 3.32E-04 9.2SE-0S

4. CARBON -14: Curies C-14 1.98E-01 2.26E-01 2.28E-01
5. TRITIUM: Curies H-3 2.22E+00 2.85E+00 2.70E+00
6. GROSS ALPHA: Curies Gross Alpha

<LLD (1)

<LLD (1)

<LLD (1)

(1) Gaseous LLDs reported on page 9 of 78 (2) Includes La-140 and Mo-99 per the ODCM (3) Equilibrium assumed, i.e., value for each nuclide is 1/2 of total 4of78

<LLD (1) 2.12E-05

<LLD (1)

<LLD (1)

<LLD (1) 1.65E-04

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1)

<LLD {1}

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1) 1.86E-04 2.22E-01 3.39E+00

<LLD (1)

Total

<LLD (l)

<LLD Ill

<LLD Ill

<LLD Ill

<LLD Ill 1.18E+01

<LLD Ill

<LLD Ill

<LLD Ill 1.18E+01

<LLD Ill

<LLD 11>

<LLD 111

<LLD Ill

<LLD (1) 2.17E-04

<LLD (1)

<LLD (1)

<LLD (1) 7.62E-04

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1) 9.79E-04 8.74E-01 1.12E+0l

<LLD (1)

Quad Cities Nuclear Power Station 2022 Annual Radioactive Effluent Release Report Effluent & Waste Disposable Summary Gaseous Effluents Release Point Reactor Vent (Mixed Mode) Continuous Mode Period: January-December 2022 Unit: 1 & 2 Continuous Mode Nuclides Released Jan - Mar 2022 Apr - Jun 2022 Jul - Sep 2022 Oct - Dec 2022

1. FISSION AND ACTIVATION GASES: Curies Ar-41

<LLD Ill

<LLD Ill

<LLD Ill

<LLD !ll Kr-8Sm

<LLD Ill

<LLD Ill

<LLD 11l

<LLD Ill Kr-85

<LLD Ill

<LLD Ill

<LLD Ill

<LLD Ill Kr-87

<LLD {ll

<LLD (ll

<LLD {ll

<LLD t1l Kr-88

<LLD {ll

<LLD Ill

<LLD Ill

<LLD Ill Xe-133

<LLD Ill l.65E+00 6.61E+00 7.64E+00 Xe-13Sm

<LLD Ill

<LLD Ill

<LLD Ill

<LLD Ill Xe-135

<LLD Ill

<LLD Ill

<LLD Ill

<LLD Ill Xe-138

<LLD Ill

<LLD Ill

<LLD Ill

<LLD Ill Total for Period

<LLD Ill l.65E+00 6.61E+00 7.64E+00

2. IODINES: Curies 1-131

<LLD Ill

<LLD Ill

<LLD Ill

<LLD Ill 1-133

<LLD Ill

<LLD Ill

<LLD Ill

<LLD Ill 1-135

<LLD Ill

<LLD Ill

<LLD Ill

<LLD 11l Total for Period

<LLD Ill

<LLD 11l

<LLD Ill

<LLD Ill

3. PARTICULATES WITH HALF-LIVES> 8 DAYS (2): Curies Cr-51

<LLD Ill

<LLD Ill

<LLD (1)

Mn-54 l.00E-04 8.33E-0S l.28E-0S Fe-55

<LLD Ill

<LLD Ill

<LLD (1)

Fe-59

<LLD Ill

<LLD Ill

<LLD (1)

Co-58

<LLD Ill

<LLD Ill

<LLD (1)

Co-60 2.68E-04 2.49E-04 7.97E-0S Ni-63

<LLD Ill

<LLD Ill

<LLD (1)

Zn-65

<LLD Ill

<LLD Ill

<LLD (1)

Sr-89

<LLD Ill

<LLD Ill

<LLD (1)

Sr-90

<LLD Ill

<LLD Ill

<LLD (1)

Zr/Nb-95(3)

<LLD Ill

<LLD Ill

<LLD (1)

Mo-99

<LLD Ill

<LLD Ill

<LLD (1)

Ag-ll0m

<LLD Ill

<LLD Ill

<LLD (1)

Cs-134

<LLD Ill

<LLD Ill

<LLD (1)

Cs-137

<LLD Ill

<LLD Ill

<LLD (1)

Ba/La-140(3)

<LLD Ill

<LLD Ill

<LLD (1)

Ce-141

<LLD Ill

<LLD Ill

<LLD (1)

Ce-144

<LLD Ill

<LLD Ill

<LLD (1)

Total for Period 3.68E-04 3.32E-04 9.25E-0S

4. CARBON - 14: Curies C-14 2.03E-01 1.93E-01 2.24E-01
5. TRITIUM: Curies H-3 2.22E+00 2.85E+00 2.70E+00
6. GROSS ALPHA: Curies Gross Alpha

<LLD (1)

<LLD (1)

<LLD (1)

(1) Gaseous LLDs reported on page 9 of 78 (2) Includes La-140 and Mo-99 per the ODCM (3) Equilibrium assumed, i.e., value for each nuclide is1/2 of total 4 of 78

<LLD (1) 2.12E-0S

<LLD (1)

<LLD (1)

<LLD (1) l.GSE-04

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1) l.86E-04 2.24E-01 3.39E+00

<LLD (1)

Total

<LLD Ill

<LLD 11l

<LLD Ill

<LLD {ll

<LLD Ill 1.59E+0l

<LLD Ill I

<LLD Ill

<LLD Ill l.59E+0l I

I

<LLD Ill

<LLD Ill

<LLD Ill

<LLD !ll

<LLD (1) 2.17E-04

<LLD (1)

<LLD (1)

<LLD (1) 7.62E-04

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1)

<LLD (1) 9.79E-04 8.44E-01 I

I l.12E+0l

<LLD (1)

Quad Cities Nuclear Power Station 2022 Annual Radioactive Effluent Release Report Effluent & Waste Disposable Summary Liquid Effluents Release Point Mississippi River Batch Mode River Discharge Tank Period: January-December 2022 Unit: 1 & 2 Batch Mode <2J Nuclides Released Jan-Mar 2022 Apr - Jun 2022 Jul - Sep 2022 Oct - Dec 2022 Total

1. FISSION AND ACTIVATION PRODUCTS: Curies Cr-51 N/A (2)

< LLD (1)

N/A (2)

N/A (2)

< LLD (1)

Mn-54 N/A (2) 8.llE-04 N/A (2)

N/A (2) 8.llE-04 Fe-55 N/A (2)

< LLD (1)

N/A (2)

N/A (2)

N/A (2)

Co-58 N/A (2) 6.S0E-05 N/A (2)

N/A (2) 6.S0E-05 Co-60 N/A (2) 1.59E-03 N/A (2)

N/A (2) 1.59E-03 Ni-63 N/A (2)

< LLD (1)

N/A (2)

N/A (2)

N/A (2)

Sb-124 N/A (2)

< LLD (1)

N/A (2)

N/A (2)

N/A (2)

Sb-125 N/A (2)

< LLD (1)

N/A (2)

N/A {2}

N/A (2)

Zn-65 N/A (2)

S.73E-04 N/A (2)

N/A (2)

S.73E-04 Sr-89 N/A (2)

< LLD (1)

N/A (2)

N/A (2)

N/A (2)

Sr-90 N/A (2)

< LLD (1)

N/A (2)

N/A (2)

N/A (2)

Zr/Nb-95 N/A (2)

< LLD (1)

N/A (2)

N/A (2)

N/A (2)

Mo-99 N/A (2)

< LLD (1)

N/A (2)

N/A (2)

N/A (2)

Ag-110m N/A (2) 4.71E-04 N/A {2)

N/A (2) 4.71E-04 Cs-134 N/A (2)

< LLD (1)

N/A (2)

N/A (2)

N/A (2)

Cs-137 N/A (2) 3.SlE-04 N/A (2)

N/A (2) 3.SlE-04 Ba/La-140 N/A (2)

< LLD (1)

N/A (2)

N/A (2)

< LLD (1)

Ce-141 N/A (2)

< LLD (1)

N/A (2)

N/A (2)

< LLD (1)

Ce-144 N/A (2)

< LLD (1}

N/A (2)

N/A (2)

< LLD (1)

Total for Period N/A (2) 3.86E-03 N/A {2)

N/A (2) 3.86E-03

2. DISSOLVED AND ENTRAINED NOBLE GASES: Curies Xe-133 N/A (2}

< LLD (1)

N/A (2)

N/A (2}

< LLD (1)

Xe-135 N/A (2}

< LLD (1)

N/A (2)

N/A (2)

< LLD (1)

Total for Period N/A (2)

< LLD (1)

N/A (2)

N/A (2)

< LLD (1)

3. TRITIUM: Curies H-3 N/A (2)

S.35E-01 N/A (2)

N/A (2)

S.35E-01 Total for Period N/A (2)

S.3SE-01 N/A (2)

N/A (2).

S.3SE-01 (1) liquid LLDs reported on page 10 of 78 (2) No River Discharges performed in Ql, Q3, or Q4 8 of78

Quad Cities Nuclear Power Station 2022 Annual Radioactive Effluent Release Report Effluent & Waste Disposable Summary Liquid Effluents Release Point Mississippi River Batch Mode River Discharge Tank Period: January-December 2022 Unit: 1 & 2 Batch Mode (2)

Nuclides Released Jan-Mar 2022 Apr-Jun 2022 Jul - Sep 2022 Oct - Dec 2022 Total

1. FISSION AND ACTIVATION PRODUCTS: Curies Cr-51 N/A (2)

< LLD {l)

N/A (2)

N/A (2)

< LLD {l)

Mn-54 N/A (2) 8.llE-04 N/A (2)

N/A (2) 8.llE-04 Fe-55 N/A (2) 3.12E-03 N/A (2)

N/A (2) 3.12E-03 I

Co-58 N/A (2) 6.S0E-05 N/A (2)

N/A (2) 6.S0E-05 I

Co-60 N/A (2) l.59E-03 N/A (2)

N/A (2) l.59E-03 Ni-63 N/A (2)

< LLD {l)

N/A (2)

N/A (2)

N/A (2)

Sb-124 N/A (2)

< LLD {l)

N/A (2)

N/A (2)

N/A (2)

Sb-125 N/A (2)

< LLD (1)

N/A (2)

N/A (2)

N/A (2)

Zn-65 N/A (2) 5.73E-04 N/A (2)

N/A (2) 5.73E-04 Sr-89 N/A (2)

< LLD {l)

N/A (2)

N/A (2)

N/A (2)

Sr-90 N/A (2)

< LLD {l)

N/A (2)

N/A (2)

N/A (2)

Zr/Nb-95 N/A (2)

< LLD {l)

N/A (2)

N/A (2)

N/A (2)

Mo-99 N/A (2)

< LLD (1)

N/A (2)

N/A (2)

N/A (2)

Ag-110m N/A (2) 4.71E-04 N/A (2)

N/A (2) 4.71E-04 Cs-134 N/A (2)

< LLD {l)

N/A (2)

N/A (2)

N/A (2)

Cs-137 N/A (2) 3.SlE-04 N/A (2)

N/A (2) 3.SlE-04 Ba/La-140 N/A (2)

< LLD (1)

N/A (2)

N/A (2)

< LLD {l)

Ce-141 N/A (2)

< LLD {l)

N/A (2)

N/A (2)

< LLD (1)

Ce-144 N/A (2)

< LLD {l)

N/A (2)

N/A (2)

< LLD {l)

Total for Period N/A (2) 6.98E-03 N/A (2)

N/A(2) 6.98E-03 I

2. DISSOLVED AND ENTRAINED NOBLE GASES: Curies I

Xe-133 N/A (2)

< LLD {l)

N/A (2)

N/A (2)

< LLD {l)

Xe-135 N/A (2)

< LLD (1)

N/A (2)

N/A (2)

< LLD {l)

Total for Period N/A (2)

< LLD (1)

N/A (2)

N/A (2)

< LLD {l)

3. TRITIUM: Curies H-3 N/A (2) 5.35E-01 N/A (2)

N/A (2) 5.35E-01 Total for Period N/A (2) 5.3SE-01 N/A (2)

N/A (2) 5.35E-01 (1) Liquid LLDs reported on page 10 of 78 (2) No River Discharges performed in Ql, Q3, or Q4 8 of78

Quad Cities Nuclear Power Station 2022 Annual Radioactive Effluent Release Report

f.

Estimated Total Error Percent The estimated total error percents ~ere calculated by taking the square root of the sum of the squares of errors for sampling and measurement parameters.

g.

Less than the Lower Limit of detection (<LLD)

Samples are analyzed such that the Technical Specification LLD requirements are met. When a nuclide is not detected during the quarter, then <LLD is reported. The most conservative LLD's used for counting effluent samples are included in this report.

5.

Batch Releases

a.

Liquid

1.

Number of releases:

2.

Total Time:

3.

Maximum Time:

4.

Average Time:

5.

Minimum Time:

6.

Average Stream. Flow:

b.

Gaseous

1.

NONE 2 releases 1.63E+02 minutes 8.75E+0l minutes 8.17E+0l minutes 7.58E+0l minutes 63.7 gallons per minute 16 of 78

Quad Cities Nuclear Power Station 2022 Annual Radioactive Effluent Release Report

f.

Estimated Total Error Percent The estimated total error percents were calculated by taking the square root of the sum of the squares of errors for sampling and measurement parameters.

g.

Less than the Lower Limit of detection (<LLD)

Samples are analyzed such that the Technical Specification LLD requirements are met. When a nuclide is not detected during the quarter, then <LLD is reported. The most conservative LLD's used for counting effluent samples are included in this report.

5.

Batch Releases

a.

Liquid

1.

Number of releases:

2.

Total Time:

3.

Maximum Time:

4.

Average Time:

5.

Minimum Time:

6.

Average Stream Flow:

b.

Gaseous

1.

NONE 2 releases 1.63E+03 minutes 8.75E+02 minutes 8.l 7E+02 minutes 7.58E+02 minutes

63. 7 gallons per minute 16 of 78

Quad Cities Nuclear Power Station 2022 Annual Radioactive Effluent Release Report During the period that the wells were routed to the discharge bay, only tritium was detected in the well discharge at levels above the required limit of detection. A total of 3.62E+O0 Ci of tritium was released to the Mississippi River via this abnormal release. The associated dose impact to members of the public from this abnormal release was calculated to be 2.GSE-07 mRem to the Child/Liver dose pathway. The total body dose associated with this abnormal release was calculated to be 2.65E-07 mRem to the Child Total Body. The associated curies and doses due to this release were included in the 2021 Annual Radiological Effluent Release Report Summation of All Releases Table (page 6 of the 2021 ARE RR), Mississippi River Continuous Mode (page 7 of the 2021 ARE RR) and Radiological Impact on Man (page 18 of the 2021 AR ERR).

Remediation of MW-R-2D2 continued th rough the 2022 calendar year, from January 1 st through December 31st, 2022. A total of 1.65E+07 gallons were released to the Discharge Bay Outfall. Starting January 3rd, 2022, sampling frequency was reduced to once every two weeks. Samples have been consistently less than detectible values for Tritium (H-3) and all other analytes. Monthly composite samples continue to be analyzed for gross alpha, Fe-55, Ni-63, Sr-89, and Sr-90. LLDs and sampling requirements for this monitored abnormal release are identical to the requirements listed in the ODCM for routine liquid effluent analysis.

b.

Gaseous

1.

NONE

7.

Radiological Impact on Man

a.

Liquid Dose to a Member of the Public for 2022

b.

Total Body:

Organ:

4.04E-0S mRem (Adult) 6.78E-0S mRem (Teen/liver)

b.

Gaseous Dose to a Member of the Public for 2022 Total Body:

4.0SE-02 mRem (Child)

Noble Gas Skin Dose:

1.12E-03 mRem/year Organ (Particulate/lodine/C_-14/Tritium):

1.86E-0l mrem (Child/Bone)

The Quad Cities calculated annual doses from Carbon-14 releases have been calculated using the methodologies outlines in the ODCM. The resultant estimated releases of Carbon-14 resulted in a dose contribution of 1.84E-0lmRem to organ dose {98.7%) and 3.67E-02 mrem to total body dose (90.7%).

18 of 78

Quad Cities Nuclear Power Station 2022 Annual Radioactive Effluent Release Report During the period that the wells were routed to the discharge bay, only tritium was detected in the well discharge at levels above the required limit of detection. A total of 3.62E +00 Ci of tritium was released to the Mississippi River via this abnormal release. The associated dose impact to members of the public from this abnormal release was calculated to be 2.GSE-07 mRem to the Child/Liver dose pathway. The total body dose associated with this abnormal release was calculated to be 2.GSE-07 mRem to the Child Total Body. The associated curies and doses due to this release were included in the 2021 Annual Radiological Effluent Release Report Summation of All Releases Table (page 6 of the 2021 ARERR), Mississippi River Continuous Mode (page 7 of the 2021 ARE RR) and Radiological Impact on Man (page 18 of the 2021 ARERR).

Remediation of MW-R-2D2 continued through the 2022 calendar year, from January ist through December 31st, 2022. A total of l.6SE+07 gallons were released to the Discharge Bay Outfall. Starting January 3rd, 2022, sampling frequency was reduced to once every two weeks. Samples have been consistently less than detectible values for Tritium (H-3) and all other analytes. Monthly composite samples continue to be analyzed for gross alpha, Fe-55, Ni-63, Sr-89, and Sr-90. LLDs and sampling requirements for this monitored abnormal release are identical to the requirements listed in the ODCM for routine liquid effluent analysis.

b.

Gaseous

1.

NONE

7.

Radiological Impact on Man

a.

Liquid Dose to a Member of the Public for 2022

b.

Total Body:

4.04E-05 mRem (Adult)

Organ:

6. 78E-05 mRem (Teen/Liver)
b.

Gaseous Dose to a Member of the Public for 2022 Total Body:

4.25E-02 mRem (Child)

Noble Gas Skin Dose:

l.12E-03 mRem/year Organ (Particulate/lodine/C-14/Tritium):

l.97E-0l mrem (Child/Bone)

The Quad Cities calculated annual doses from Carbon-14 releases have been calculated using the methodologies outlines in the ODCM. The resultant estimated releases of Carbon-14 resulted in a dose contribution of l.94E-0lmRem to organ dose (98.7%) and 3.88E-02 mrem to total body dose (91.2%).

18 of 78

Quad Cities Nuclear Power Station 2022 Annual Radioactive Effluent Release Report

c.

40 CFR 190 Direct Radiation Dose to a Member of the Public for 2022 Total Body:

7.53E+00 mrem 3.01E+01% of 40CFR190 Limit of 25 mrem/year (Total Body)

Organ Dose:

1.86E-01 mrem Child/Bone 7.44E-01% of 40CFR190 Limit of 25 mrem/year (Organ Dose)

Thyroid Dose:

4.38E-02 mrem Infant/Thyroid 5.84E-02% of 40CFR190 Limit of 75 mrem/year (Thyroid Dose)

d.

Total Body Doses to the Population and Average Doses to Individuals in the Population from All Receiving-Water-Related-Pathways:

Not applicable for QCNPS. Not required per Quad Cities ODCM.

e.

Total Body Doses to the Population and Average Doses to Individuals in the Population from Gaseous effluents to a distance of 50 miles:

Not applicable for QCNPS. Not required per Quad Cities ODCM.

f.

Doses From Liquid and Gaseous Effluent to Members of the Public Due to Their Activities Inside the Site Boundary for the Record Period:

Not applicable for QCNPS. Any member of the public that is onsite for a significant period will be issued a dosimeter.

g.

Liquid and Gaseous Effluent Radiation Monitors and Instrumentation Unavailability for the Period Beyond the Requirements of the ODCM, Including Sampling Deviation:

On May 11, 2022, the Main Chimney High Range Noble Gas Monitor was declared inoperable. On May 31, 2022, the Main Chimney High Range Noble Gas Monitor was declared operable following repairs and successful calibration and functional tests. The inoperability of the Main Chimney High Range Noble Gas Monitor required entry into ODCM Section 12.2.2, "Radioactive Gaseous Effluent Monitoring Instrumentation Report," Condition F, due to less than the minimum number of OPERABLE channels of the Main Chimney High Range Noble Gas Monitor. Action F.1 requires establishment of the preplanned alternate method of monitoring within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. This action was completed on May 11, 2022, via the Main Chimney GE monitors. Action F.2 requires the instrument channel to be restored to OPERABLE status within 7 days. The 7-day time requirement was reached on May 18, 2022 without the monitor being restored to operable. Resolution of this issue within the 7-day requirement was not feasible due to multiple failures associated with the high range detector and electronics.

19 of 78

Quad Cities Nuclear Power Station 2022 Annual Radioactive Effluent Release Report

c.

40 CFR 190 Direct Radiation Dose to a Member of the Public for 2022 Total Body:

7.SSE+00 mrem 3.00E+01% of 40CFR190 Limit of 25 mrem/year (Total Body)

Organ Dose:

l.97E-0l mrem Child/Bone 7.88E-01% of 40CFR190 Limit of 25 mrem/year (Organ Dose)

Thyroid Dose:

4.57E-02 mrem Infant/Thyroid 6.09E-02% of 40CFR190 Limit of 75 mrem/year (Thyroid Dose)

d.

Total Body Doses to the Population and Average Doses to Individuals in the Population from All Receiving-Water-Related-Pathways:

Not applicable for QCNPS. Not required per Quad Cities ODCM.

e.

Total Body Doses to the Population and Average Doses to Individuals in the Population from Gaseous effluents to a distance of 50 miles:

Not applicable for QCNPS. Not required per Quad Cities ODCM.

f.

Doses From Liquid and Gaseous Effluent to Members of the Public Due to Their Activities Inside the Site Boundary for the Record Period:

Not applicable for QCNPS. Any member of the public that is onsite for a significant period will be issued a dosimeter.

g.

Liquid and Gaseous Effluent Radiation Monitors and Instrumentation Unavailability for the Period Beyond the Requirements of the ODCM, Including Sampling Deviation:

On May 11, 2022, the Main Chimney High Range Noble Gas Monitor was declared inoperable. On May 31, 2022, the Main Chimney High Range Noble Gas Monitor was declared operable following repairs and successful calibration and functional tests. The inoperability of the Main Chimney High Range Noble Gas Monitor required entry into ODCM Section 12.2.2, "Radioactive Gaseous Effluent Monitoring Instrumentation Report," Condition F, due to less than the minimum number of OPERABLE channels of the Main Chimney High Range Noble Gas Monitor. Action F.l requires establishment of the preplanned alternate method of monitoring within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. This action was completed on May 11, 2022, via the Main Chimney GE monitors. Action F.2 requires the instrument channel to be restored to OPERABLE status within 7 days. The 7-day time requirement was reached on May 18, 2022 without the monitor being restored to operable. Resolution of this issue within the 7-day requirement was not feasible due to multiple failures associated with the high range detector and electronics.

19 of 78

TEDE (mrem)

TEDE (mrem)

Quad Cities Nuclear Power Station 2022 Annual Radioactive Effluent Release Report 10CFR20.1301(a)(1) Compliance Assessment 1st Quarter 1.0lE+00 1st Quarter 8.30E-01 Quad Cities Station Unit One and Unit Two Assessment Period 01/01/2022-01/01/2023 10CFR20.1301(a)(1) Limit 100.00 mrem/year Quad Cities Unit 1 2nd Quarter 3rd Quarter 4th Quarter 9.9SE-01 9.99E-01 1.03E+00 Quad Cities Unit 2 2nd Quarter 3rd Quarter 4th Quarter 7.33E-01 9.62E-01 9.79E-01 Year Total

% of Limit 4.03E+00 4.03" Year Total

%of Limit 3.S0E+00 3.50%

Submitted by: _----t-P-~-------------\\-~--~----

Miranda A. Talty Date: L\\... 2 ~ - Z 3 David C. Basham Date: ffe11i~

t Justin Ashland 20 of78

Quad Cities Nuclear Power Station 2022 Annual Radioactive Effluent Release Report 10CFR20.1301(a}(1) Compliance Assessment Quad Cities Station Unit One and Unit Two Assessment Period 01/01/2022-01/01/2023 10CFR20.1301(a)(l) Limit 100.00 mrem/year Quad Cities Unit 1 pt Quarter 2nd Quarter 3rd Quarter 4th Quarter Vear Total

% of Limit TEDE (mrem) l.0lE+00 9.95E-01 l.00E+00 l.03E+00 4.04E+00 4.04% I Quad Cities Unit 2 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter Vear Total

% of Limit TEDE (mrem) 8.30E-01 7.33E-01 9.62E-01 9.80E-01 3.SlE+00 3.51% I Submitted by: _______________________ _

Date: _____ _

Miranda A. Talty Technical Review by: ______________________ Date: _____ _

David C. Basham Reviewed by: _______________________ _

Date: ------

Justin Ashland 20 of 78