SBK-L-09210, Submittal of Procedure OS1290.03 and OS1290.04

From kanterella
Jump to navigation Jump to search
Submittal of Procedure OS1290.03 and OS1290.04
ML092740155
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 09/23/2009
From: O'Keefe M
NextEra Energy Seabrook
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
SBK-L-09210
Download: ML092740155 (3)


Text

NExTera" ENERCY S

SEARBROOK September 23, 2009 Docket No. 50-443 Docket No. 72-63 SBK-L-09210 United States Nuclear Regulatory Commission Attn.: Document Control Desk Washington, D.C. 20555-0001 Seabrook Station Procedure OS1290.03 and OS1290.04 In accordance with the requirements of 10 CFR 50, Appendix E, 10 CFR 50.4 and 10 CFR 72.44(f), enclosed is procedure OS1290.03, Response to a Security Event, Revisions 6 and 7 and procedure OS1290.04, Response to an Airborne Security Event, Revisions 2 and 3. The procedure is used in the implementation of the Seabrook Station Radiological Emergency Plan (SSREP). The procedure, as changed, does not decrease the effectiveness of the SSREP and the SSREP continues to meet the standards of 10 CFR 50.47(b) and 10 CFR 50, Appendix E. The Resident Inspector copy is provided directly through the NextEra Energy Seabrook, LLC (NextEra) records management system. provides a summary of changes to procedures OS1290.03 and OS1290.04. is a copy of the revised procedure.

Because the enclosed procedure contains security-related information, NextEra requests that this submittal be withheld from public disclosure in accordance with 10 CFR 2.390(d)(1).

Should you have any questions regarding the enclosed revisions, please contact me at (603) 773-7745.

Very truly yours, NextEra Energy Seabrook, LLC Michael O'Keefe Licensing Manager 5Oo(

NextEra Energy Seabrook, LLC, P.O. Box 300, Lafayette Road, Seabrook, NH 03874 7-I'A MSS

United States Nuclear Regulatory Commission SBK-L-09210 / Page 2 cc (with enclosures):

S. T. Barr, Region I, Division of Reactor Safety (two copies)

D. Egan, NRC Project Manager, Project Directorate 1-2 cc (without Enclosure 2):

ATTN: Document Control Desk Director, Spent Fuel Storage and Transportation, Office of Nuclear Material Safety and Safeguards Nuclear Regulatory Commission Washington, DC 20555-0001 cc (without enclosures):

S. J. Collins, NRC Region I Administrator W. J. Raymond, NRC Senior Resident Inspector

Enclosure I to SBK-L-09210 Procedure OS 1290.03 Summary of Changes Rev. 7 Reinstated information in Rev. 6. Pager system described in Rev. 30 is not ready for implementation Rev. 6 Changed the pager activation process to recognize use of the American Messaging paging service. This affected Form C notification processes by changing the pager group call numbers, eliminating the alternate group call number, and replacing the alternate call method for an initial failure with a website activation process before using the manual method.

Procedure OS 1290.04 Summary of Changes Rev. 3 Reinstated information in Rev. 1. Pager system described in Rev. 30 is not ready for implementation Rev. 2 Changed the pager activation process to recognize use of the American Messaging paging service. This affected Form C notification processes by changing the pager group call numbers, eliminating the alternate group call number, and replacing the alternate call method for an initial failure with a website activation process before using the manual method.