RS-20-030, Submittal of Radiological Emergency Plan Addendum Revision
| ML20083H415 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 03/17/2020 |
| From: | Simpson P Exelon Generation Co |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20083H413 | List: |
| References | |
| RS-20-030 | |
| Download: ML20083H415 (2) | |
Text
rv Exelon Generation RS-20-030 March 17, 2020 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Dresden Nuclear Power Station, Units 1, 2, and 3 Facility Operating License No. DPR-2 4300 Winfield Road Warrenville, IL 60555 630 657 2000 Office 10 CFR 50.54(q)(5) 10 CFR 50.4 10 CFR 72.44(f)
Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos.50-010, 50-237, 50-249, and 72-37
Subject:
Exelon Nuclear Radiological Emergency Plan Addendum Revision In accordance with 10 CFR 50.4(b)(5), "Emergency Plan and related submissions," Exelon Generation Company, LLC (Exelon) is submitting the Emergency Plan Addendum revision listed in the table below for Dresden Nuclear Power Station (Dresden).
Document Revision Title EP-AA-1004, Addendum 3 9
Emergency Action Levels for Dresden Station The changes to the Emergency Plan Addendum were evaluated under the requirements of 1 O CFR 50.54(q) and were determined not to result in a reduction in the effectiveness of the Emergency Plan for Dresden. This notification is being submitted within 30 days of implementation of the changes as required by 10 CFR 50.54(q)(5). The changes continue to meet the applicable planning standards established in 10 CFR 50.47(b) and 10 CFR 50, Appendix E.
In addition, as required by 10 CFR 50.54(q)(5), *this submittal includes a summary analysis of the changes to the Emergency Plan Addendum (Attachment 1 ).
This submittal also satisfies the reporting requirements associated with 10 CFR 72.44(f),
which stipulates that within six months after any change is made to the Emergency Plan, the licensee shall submit a report containing a description of the changes to the Director, Division of Fuel Management, Office of Nuclear Material Safety and Safeguards.
U. S. Nuclear Regulatory Commission Emergency Plan Addendum Revision Docket Nos.50-010, 50-237, 50-249, and 72-37 March 17, 2020 Page2 A copy of the Emergency Plan Addendum revision and supporting change summary analysis are included in the attachments to this letter.
There are no regulatory commitments in this submittal.
If you have any questions or require additional information, please contact Amy Hambly at (630) 657-2808.
p;;zR~
Patrick R. Simpson Sr. Manager, Licensing Exelon Generation Company, LLC Attachments: 1) 10 CFR 50.54{q)(5) Procedure Change Summary Analysis
- 2) EP-AA-1004, Addendum 3, Revision 9, "Emergency Action Levels for Dresden Station" cc:
w/ Attachment 1 only Regional Administrator - NRC Region Ill Director, NRC Division of Spent Fuel Management, ONMSS NRC Senior Resident Inspector - Dresden Nuclear Power Station NRC Project Manager, NRR - Dresden Nuclear Power Station Illinois Emergency Management Agency - Division of Nuclear Safety