RBG-47413, Notification of Deviation from BWRVIP-42
| ML13358A293 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 12/11/2013 |
| From: | Clark J Entergy Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| RBG-47413 | |
| Download: ML13358A293 (4) | |
Text
Entergy Operations, Inc.
River Bend Station e5485 U.S. Highway 61 N Yr St. Francisville, LA 70775 Tel 225-381-4177 Joseph A. Clark Manager, Regulatory Assurance December 11, 2013 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 RBG-47413
Subject:
Notification of Deviation from BWRVIP-42 River Bend Station - Unit 1 Docket No. 50-458 License No. NPF-47 This letter provides notification of a deviation from the Boiling Water Reactor Vessel and Internals Project (BWRVIP) guidelines for River Bend Station. This is a deviation from the performance of inspection in accordance with the examination schedules of BWRVIP-42 Revision 1, "BWR Vessel and Internals Project, LPCI Coupling Inspection and Flaw Evaluation Guidelines," (EPRI Report 1020999, June 2010).
This is a deviation from a "needed" element of the BWRVIP program to perform inspections in accordance with the guidance of BWRVIP-42. The 6-1a weld on the 135 degree coupling, which is prioritized as High, was not reinspected during Refuel Outage (RF) 15 with the rest of the 135 degree welds nor was it reinspected within the 12 year inspection cycle. In addition to the inadvertent missed reinspection of 6-1a, the 100% re-inspection of the High and Low priority locations within the 12 year time frame as specified in BWRVIP-42 was not met. The inspection of the 6-1 a weld on the 135 degree coupling has been scheduled for the next refueling outage which is RF-18 (2015).
This deviation from the BWRVIP guidelines has been reviewed and approved in accordance with Entergy procedures and NEI 03-08 guidance. This is a notification of deviation only, and no action is being requested from the NRC.
The attachment to this letter provides a summary of the regulatory commitment made in this submittal.
RBG-47413 Page 2 of 2 Should you have any questions regarding this deviation, please contact me.
Sincerely, Attachment List of Regulatory Commitments cc: Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 E. Lamar Blvd.
Arlington, TX 76011-4511 NRC Senior Resident Inspector P. 0. Box 1050 St. Francisville, LA 70775 U. S. Nuclear Regulatory Commission Attn: Mr. Alan Wang MS 0-8B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Louisiana Department of Environmental Quality Office of Environmental Compliance Radiological Emergency Planning and Response Section JiYoung Wiley P. O. Box 4312 Baton Rouge, LA 70821-4312 Public Utility Commission of Texas Attn: PUC Filing Clerk 1701 N. Congress Avenue P. O. Box 13326 Austin, TX 78711-3326 RBF1-13-0154
Attachment I RBG-47413 List of Regulatory Commitments
RBG-47413 Page 1 of 1 List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.
TYPE (Check one)
SCHEDULED ONE-CONTINUING COMPLETION COMMITMENT TIME COMPLIANCE DATE ACTION The inspection of the 6-1a weld on the 135 degree X
RF-18 coupling has been scheduled for the next refueling outage which is Refuel Outage 18 (2015).