RBG-45987, June 2002 Monthly Operating Report for River Bend

From kanterella
Jump to navigation Jump to search
June 2002 Monthly Operating Report for River Bend
ML021970267
Person / Time
Site: River Bend Entergy icon.png
Issue date: 07/11/2002
From: King R
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
G4.25, G9.5, RBF1-02-0114, RBG-45987
Download: ML021970267 (4)


Text

Entergy Operations, Inc.

River Bend SEaton 5485 U.S. Highway 61 P. P. Box 220 St. Francisville, LA 70775 G&Entfffl(Tel 225 336 6225 Fax 225 635 5068 Rick J. King Director Nuclear Safety Assurance July 11,2002 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Monthly Operating Report River Bend Station Docket No. 50-458 License No. NPF-47 File No.:

G9.5, G4.25 RBG-45987 RBF1-02-0114 Ladies and Gentlemen:

In accordance with River Bend Station Technical Specification 5.6.4, enclosed is the Monthly Operating Report for June 2002.

Sincerely, enclosure X

y.

Monthly Operating Report July 11, 2002 RBG-45987 RBF1-02-0114 Page 2 of 2 cc:

U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 NRC Senior Resident Inspector P. O. Box 1050 St. Francisville, LA 70775 INPO Records Center 700 Galleria Parkway Atlanta, GA 30339-3064 Mr. Jim Calloway Public Utility Commission of Texas 1701 N. Congress Ave.

Austin, TX 78711-3326 Dottie Sherman American Nuclear Insurers 29 South Main Street West Hartford, CT 06107

DOCKET NO. 50/458 RIVER BEND STATION DATE July 11, 2002 COMPLETED BY Danny H. Williamson TITLE Sr. Licensing Specialist TELEPHONE 225-381-4279 PAGE 1

OF 2

OPERATING STATUS

1. REPORTING PERIOD:

June 2002

2. MAXIMUM DEPENDABLE CAPACITY (MWe-Net):

966

3. DESIGN ELECTRICAL RATING (MWe-Net):

966 MONTH YEAR TO CUMULATIVE DATE

4. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 4275.1 115,650.6
5. HOURS GENERATOR ON LINE 720.0 4251.4 112,015.9
6. UNIT RESERVE SHUTDOWN HOURS 0

0 0

7. NET ELECTRICAL ENERGY GENERATED (MWH) 710,137 4,223,843 99,816,790

PAGE 2

OF 2

UNIT SHUTDOWNS LEGEND:

SHUTDOWN METHOD:

I - Manual 2 - Manual trip / scram 3 -Automatic trip / scram 4 - Continuation 5 - Other (explain)

REASON:

A - Equipment failure (explain)

B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator training I License Exam F - Administrative G - Operational error (explain)

H - Other (explain)

1. There were no challenges to the reactor safety relief valves in June.

Danny H. Williamson TYPE:

F - Forced S - Scheduled NOTES: