'1_~ DUKE
~ ENERGY Serial: RA-21-0311 November 17, 2021 Ms. Laura Dudes Regional Administrator, Region II U.S. Nuclear Regulatory Commission (USNRC)
Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 H.B. Robinson Steam Electric Plant, Unit No. 2 Docket No. 50-261 I Renewed License No. DPR-23
SUBJECT:
Response to Confirmatory Order EA-19-025 Ernest J. Kapopoulos, Jr.
H. B. Robinson Steam Electric Plant Unit 2 Site Vice President Duke Energy 3581 West Entrance Road Hartsville, SC 29550 O.* 843 9511701 F: 843 9511319 Ernie. Kapopoulos@duke-energy.com
REFERENCE:
Confirmatory Order dated March 11, 2020 from Joel T. Munday, USNRC Deputy Regional Administrator, to Ernest J. Kapopoulos, Jr., Site Vice President, H.B. Robinson Steam Electric Plant (Agencywide Documents Access and Management System [ADAMS] Accession Nos.
Dear Ms. Dudes,
The referenced letter transmitted Confirmatory Order EA-19-025, which confirmed commitments made by Duke Energy Carolinas, LLC and Duke Energy Progress, LLC (referred to collectively as Duke Energy) to the NRC involving an NRC investigation. These commitments resulted from an Alternate Dispute Resolution (ADR) session conducted on December 16, 2019.
Section V.3 of the Confirmatory Order states that Duke Energy will notify the NRC Region II Regional Administrator upon completion of all actions required of Duke Energy in the Order.
This letter provides the notification that the commitments required by Duke Energy in Confirmatory Order EA-19-025 have been completed.
This letter contains no new commitments and no revisions to existing commitments.
Sincerely, Ernest J. Kapopoulos, Jr.
Site Vice President H.B. Robinson Steam Electric Plant
U.S. Nuclear Regulatory Commission RA-21-0311 Page2 CC:
T. Hood-NRR Project Manager, RNP M. Fannon - USNRC Resident Inspector, RNP USNRC Document Control Desk