PLA-3992, Informs of Organizational Changes.Current Organization Chart of Nuclear Dept Encl

From kanterella
Jump to navigation Jump to search
Informs of Organizational Changes.Current Organization Chart of Nuclear Dept Encl
ML18026A252
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 06/21/1993
From: Byram R
PENNSYLVANIA POWER & LIGHT CO.
To: Chris Miller
Office of Nuclear Reactor Regulation
References
PLA-3992, NUDOCS 9306280309
Download: ML18026A252 (3)


Text

ACCELE D DOCM4ENT DIS UTION SYSTEM REGUL ORY INFORMATION DISTRIBUT SYSTEM (RIDS)

ACCESSION UBR:9306280309 DOC.DATE: 93/06/21 NOTARIZED:

NO FACIL,:50-387 Susquehanna Steam Electric Station, Unit 1, Pennsylva 50-388 Susquehanna Steam Electric Station, Unit 2, Pennsylva AUTH.NAME AUTHOR AFFILIATION BYRAM,R.G.

Pennsylvania Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION MILLER.C.L.

Project Directorate I-2 DOCKET 05000387 05000388

SUBJECT:

Informs of organizational changes. Current organization chart of Nuclear Dept encl.

DISTRIBUTION CODE:

M006D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Changes of Personnel/Address NOTES:

RECIPIENT ID CODE/NAME PDl-2 LA CLARKiR COPIES LTTR ENCL 1

1 1

1 RECIPIENT ID CODE/NAME PD1-2 PD COPIES LTTR ENCL 1

0 INTERNAL: ACRS ASI BP

-OC LFDCB FIL EXTERNAL: NRC PDR Ol 1

1 1

1 1

0 1

1 ADM STEVENSON I L CAA-16B-13 OGC/HDS2 SECY/DSB 1

1 1

1 1

1 1

1 NOTE TO.ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTBI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO EUMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'7 NBEDI TOTAL NUMBER OF COPIES REQUIRED:

LTTR 12 ENCL 10

C Pennsylvania Power & Light Company Two North Ninth Street~Allentown, PA 18101-1179 ~ 215/774-5151 Robert G. Byram Senior Vice President-Nuclear 215/774-7502 JUN 2 1 1993 Director of Nuclear Reactor Regulation Attention: Mr. C.L. Miller, Project Director Project Directorate I-2 Division of Reactor Projects U.S. Nuclear Regulatory Commission Washington, D.C.

20555 SUSQUEHANNA STEAM ELE<CTRIC STATION ORGANIZATIONALCHANGE<S PLA-3992 FILE R41-2 Docket Nos. 50-387 and 50-388

Dear Mr. Miller:

The purpose of this letter is to inform you of several organizational changes which have taken place at Pennsylvania Power Ec Light Company. Mr. Harold G. Stanley and Mr. George T. Jones have been promoted to Vice President

- Nuclear Operations and Vice President

- Nuclear Engineering, respectively.

Mr. Stanley and Mr. Jones willretain their functional responsibilities with the following changes.

The Nuclear Training and Nuclear Procurement functions are now the responsibility of Mr. Stanley.

The Nuclear Department Support function is now the responsibility of Mr. Jones.

Attached for your information and use is a copy ofthe current organization chart for the Nuclear Department.

Very truly yours, R. G.

m Attachment CC:

HKC33ocumen Co~nrog3esS (original)

NRC Region I Mr. G.

S.

Barber, NRC Sr. Resident Inspector - SSES Mr. R.

J. Clark, NRC Sr. Project Manager - Rockville cyg0628o 5000g87 PDR ADOCK 0 pDR gook l

Revhhci 9 1 June 1993 James R. Berger Comptroller Robert G. Byram Suuar Vice President Nuclear Andrew R. Sabol Manager Nuc. Quality Assurance John V. Fdwarih Acting Manager Bucker Information Services James Miltenberger ldanager Nuclear Safety Assessment George T. Jones Vice President NucIear Engineemng Haroid G. Stanley Vice President NuaIear Operations Charles A Myers blanager Nudear Regulatary Affairs Aflan R. Male Supervhor Nudear Assessment Rsymcud hi. Hams, Jr.

Senior Project Specialist Hl5 John V. Edwards Manager Nuclear Department Support Michael W. Simpson Manager Nuclear hlodifications Gearge J. Kuczynski Manager Nuclear Systems Engineering Jerome S. Stefisnko Manager Nuclear Fuels Gknn D. IBHer Manager Nudear Technology Edgar W. Figard Manager Nudear bkintenance Theodore C. Dalpiaz Rallager Nudear Plant Smvices Richard L. Stotler Manager Nudear Security Howard J. Palmer Manager Nuclear Operations Anthony F. Iorfida Manager Nuckar Procurement Wifliam H. Lowthert HI Mansgst'udear Training James M. Kenny Supervisor Nudear Licensing James J. Graham Supervisor Nuclear Quality Control Charles R. Whirl, Jr.

Superrisor Quaflty Verification Robert J. Prego Supervisor Site Quality VeriTication Walter W. Skswski Senior Project Enginaw 185 (vite(

Jclm P. Tudur Senior Project Engineer I85 (Kl)

Charles H. Bsllsrd Senior Project Engineer NIS - LAH Richard A. Fedor Supervisor Nudear Records Bissbeth Clark Supervisor Planning & Cost Smvices David P. Parsons (Actingj Supervisor Design/Drafting blichael D. Stout Supeniisor Nudun Draitiag Serrices James O'ullivan Supervisor

'odification Design-Site Harry L Riley Tsduscd Consultant ALARA Robert E. Hoopss Super visor Praj. Msmt 8 Alod. Services Jeffrey F. Fritzvn Supervisor Modification Instaflaiion Thomas J. Nork Supervhor Eng'g & lnstaB. Planning Barry L. Garner Project hhusgw Simulator Vpgrade Twist Edchsel B. Dalarna.e project~

passer Vprate Ivc(vct Cumiuic J, Cardmsle Prde< h(srngw Esg'8 CoutractingHRC Dale F. Roth Supervisor Nudear Steam Supply Systems Robert A. Saccone Supervhor Balance of Plant Systmas Samuel B. Kuhn Supervisor Bectricalli&CSystems Henry P. Seegar Supervisor Computer Systems hkrk M. Golden Supervisor Programs & TestJng John R. Kuhck Supervisor Nuclear Fuels Engineering Robert J. McKean Sapervisor Economics and Contracts Frederick G. Butler Supervisor Systems Analysis John E. Rothe Project h1ansgw Dectrical I ues Thomas A. Gorman Project hisusgw Seismicj Civil hsues Vacant Supervisor Engineering Technology Herbert R, ilsrke m Project I.hussar gaas~t lan Prajict Welter Rhosdes Project hhnsgsr Eng'8 Tramiug & Development Herbert L. Vebb Superrisw Maintenance Teihua logy Richard L. Roty Supervissr Operations Tednaiogy Kenneth E. Slunk Supervisor Enriion.&. bemistiy Services Charlin J. Kdter Superrisoi Radiological Smvices Kevin Chsisbliss Supervisor R'aintenance Outage/Production Timothy K. Steingass Superv nor Testing Maintenance Keith bhtteiu Supervisor NSSS Maintenance Douglas F, Sitler Supervisor Balance of Plant bhinteuasce Richard R. Bogar Senior Project Engineer Bectrical Maintenance Gerald T. Glaser Supervisor I&CProduction John P. Gutshafl Supervisor Valve Maintenauce Lance L Kittelson Superrisor Predictive hiaintenance Donald Gandenberger Supervisor Maint. Production Services 5harsd K. Shah Supervisor hiaintenance Planning Staniey J. Lashes Supirvisor Plant Scheduling Curtis D. Msrkley Supcuvisar Effluents blansgemest Deborah L. Began Sup uvisor Health Physics Francii G. Relet Sun irvinr Site 5srv'obert A. Breslin Supmvhar Chmustry Roland M. Parents Superrisor Security Operstkns Richard E. Gaudreau Supervisor Security Training Robert T. Gribble Supervisor Seasrity Support Chris D. Lopes Supervisor Site Access Services Thomas R. Markowski Shiit Supervisor Operations 6 lndividuah Shift Supervisors Shifts A-F James Dozsey Supervisor Reactor Engineering Francis S. Gruscavage Jr.

Supsrrisor Operations Engineeriag Phillip M. Bartel Supervhar Operations Tcchnical Support Robert G. Shersnhs Lead Eusiuew Shift Tedusad Advisors Donald G. Sutton Su pervisor Materials David W. Klinger Supervisor klateriah Engineering (Vacant)

Supervisor Contracts 8 Technical Serrices Kenneth R. Roush Super visor Nudear Instruction Arthur S. Fitch Supervisor Operations Instruction Marcia McGsnn Supervhor Trsg Resource & Doc. Center Joseph R. 5narpanis Supervisor Curricalum Devei'opment Lisa M. Walton Supervlsoi'dministrative Daniel F. McGann Acting Supervisor Nuclear Compliance Robert R. Peal Superrisar Nudear Emergency Planning NIIciear Department hIanagement Structure Ofganization Chart gpss