| | Site | Start date | Title |
|---|
| 05000333/LER-2024-002-01, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation | FitzPatrick | 8 July 2024 | Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation |
| 05000333/LER-2023-002-01, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation | FitzPatrick | 14 August 2023 | Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation |
| 05000374/LER-2022-003-02, Manual Scram Due to Lsophase Bus Duct Fire Followed by 2A RPS Normal Power Supply Trip | LaSalle | 16 June 2023 | Manual Scram Due to Lsophase Bus Duct Fire Followed by 2A RPS Normal Power Supply Trip |
| 05000374/LER-2021-002-02, Supplement to Reactor Protection System Half Scram Due to Motor Generator Set Output Breaker Trip | LaSalle | 25 May 2023 | Supplement to Reactor Protection System Half Scram Due to Motor Generator Set Output Breaker Trip |
| 05000374/LER-2022-003-01, Manual Scram Due to Lsophase Bus Duct Fire Followed by 2A RPS Normal Power Supply Trip | LaSalle | 9 February 2023 | Manual Scram Due to Lsophase Bus Duct Fire Followed by 2A RPS Normal Power Supply Trip |
| 05000374/LER-2022-003, Manual Scram Due to Lsophase Bus Duct Fire and 2A RPS Normal Power Supply Trip | LaSalle | 15 November 2022 | Manual Scram Due to Lsophase Bus Duct Fire and 2A RPS Normal Power Supply Trip |
| 05000374/LER-2021-002-01, Reactor Protection System Half Scram Due to Motor Generator Set Output Breaker Trip | LaSalle | 23 September 2021 | Reactor Protection System Half Scram Due to Motor Generator Set Output Breaker Trip |
| 05000374/LER-2021-002, Reactor Protection System Half Scram Due to Motor Generator Set Output Breaker Trip | LaSalle | 29 July 2021 | Reactor Protection System Half Scram Due to Motor Generator Set Output Breaker Trip |
| 05000254/LER-1991-028-01, :on 911220,loss of Power to 1A RPS Bus Occurred.Caused by Low Generator Output Voltage.Rheostat Adjusted for Higher Generator Output Voltage & Returned to Svc | Quad Cities | 17 January 1992 |
- on 911220,loss of Power to 1A RPS Bus Occurred.Caused by Low Generator Output Voltage.Rheostat Adjusted for Higher Generator Output Voltage & Returned to Svc
|
| 05000296/LER-1988-008-04, :on 881221,reactor Protection Sys Circuit Protector Tripped,Deenergizing Bus 3B & Causing Half Scram. Caused by Voltage Fluctuations in MG 3B Set Resulting in Pitting on Contact Surfaces.Protectors Reset | Browns Ferry | 20 January 1989 |
- on 881221,reactor Protection Sys Circuit Protector Tripped,Deenergizing Bus 3B & Causing Half Scram. Caused by Voltage Fluctuations in MG 3B Set Resulting in Pitting on Contact Surfaces.Protectors Reset
|
| 05000277/LER-1988-026-01, :on 881029,primary Containment Isolation Resulted from Undervoltage Trip of Reactor Protection Sys Channel a Due to Sensitive Rheostat.Caused by Craftsman Inadvertently Bumping Voltage Control Rheostat | Peach Bottom | 28 November 1988 |
- on 881029,primary Containment Isolation Resulted from Undervoltage Trip of Reactor Protection Sys Channel a Due to Sensitive Rheostat.Caused by Craftsman Inadvertently Bumping Voltage Control Rheostat
|
| 05000295/LER-1988-011-02, :on 880507,reactor Trip Occurred Due to lo-lo Level in Steam Generator 1B Due to Generator Excitation. Caused by Corrosion on Phase B in Primary Potential Transformer Resistors.Resistors Replaced | Zion | 6 June 1988 |
- on 880507,reactor Trip Occurred Due to lo-lo Level in Steam Generator 1B Due to Generator Excitation. Caused by Corrosion on Phase B in Primary Potential Transformer Resistors.Resistors Replaced
|
| 05000277/LER-1988-003-01, :on 880302,ESF Actuation Occurred Due to Undervoltage Trip of Breakers While Adjusting Defective Voltage Rheostat.Caused by Defective Voltage Rheostat. Breakers Closed & Rheostat Replaced | Peach Bottom | 28 March 1988 |
- on 880302,ESF Actuation Occurred Due to Undervoltage Trip of Breakers While Adjusting Defective Voltage Rheostat.Caused by Defective Voltage Rheostat. Breakers Closed & Rheostat Replaced
|
| 05000325/LER-1986-024, :on 860913,automatic Reactor Scram Occurred Due to 90% Full Open MSIV Position.Caused by Main Generator Output Voltage Oscillations.Manual Potentiometer Contact Wiper & Slide Assembly Replaced | Brunswick | 13 October 1986 |
- on 860913,automatic Reactor Scram Occurred Due to 90% Full Open MSIV Position.Caused by Main Generator Output Voltage Oscillations.Manual Potentiometer Contact Wiper & Slide Assembly Replaced
|
| 05000245/LER-1981-031, Forwards LER 81-031/03L-0.Detailed Event Analysis Encl | Millstone | 9 October 1981 | Forwards LER 81-031/03L-0.Detailed Event Analysis Encl |
| 05000298/LER-1980-043-03, /03L-0:on 801021,motor Operated Valve SW-MO-89B Failed to Open.Caused by Broken Wire Connected to Ohmite 1000-ohm Variable Resistor Inside Valve Operator.Broken Lead Resoldered & Circuit Checked | Cooper | 20 November 1980 | /03L-0:on 801021,motor Operated Valve SW-MO-89B Failed to Open.Caused by Broken Wire Connected to Ohmite 1000-ohm Variable Resistor Inside Valve Operator.Broken Lead Resoldered & Circuit Checked |