NRC 2024-0007, Ile Post-Exam Submittal Letter

From kanterella
(Redirected from NRC 2024-0007)
Jump to navigation Jump to search
Ile Post-Exam Submittal Letter
ML24120A201
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/18/2024
From: Durbin M
Point Beach
To: April Nguyen
NRC/RGN-III
B. Bergeon
Shared Package
ML22251A175 List:
References
NRC 2024-0007
Download: ML24120A201 (1)


Text

NEXTera ENERGY~

POINT BEACH March 18, 2024 April Nguyen, Chief Operations Branch NRC 2024-0007 U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Initial Operator and Senior Operator License Examinations Written Examination Results Operator and Senior Operator License written examinations were conducted at Point Beach Nuclear Plant on March 13, 2024.

Enclosed please find the following examination-related materials:

Candidate seating chart Five (5) Forms 4.2-3 Reactor Operator (RO) written examination cover sheets Five (5) RO exam original answer forms, with one clean photocopy and one LXR machine score report for each candidate Seven (7) Forms 4.2-4 Senior Reactor Operator (SRO) written examination cover sheets Seven (7) SRO exam original answer forms, with one clean photocopy and one LXR machine score report for each candidate One (1) RO/SRO Written Exam Key equivalent to Form 4.2-1 One (1) each RO/SRO As Administered Examination Candidate questions during written exam administration and proctor responses One (1) Exam Item Analysis Report for RO/SRO exams No exam feedback was given and therefor will not be submitted EXAM MATERIAL - ENCLOSURES TO BE WITHHELD FROM PUBLIC DISCLOSURE FOR TWO YEARS NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241

NRC LICENSE EXAM QUESTION SHEET Page 1 of 1 Commenter Docket Number Test Item Student Question Reference

Response

RO Applicant [Redacted]

7 Are pressurizer spray valves shut due to implementing AOP-24 and operator action taken or is it stating that spray valves are open due to failure of 1HC-431K?

N/A Question stands as written (SAW).

SRO Applicant SRO Applicant RO Applicant

[Redacted]

[Redacted]

[Redacted]

35 Question states The NEXT action to be taken to address the situation is to Were any ACTIONS taken up to this point?

N/A Question SAW.

SRO Applicant [Redacted]

38 Please validate the noun name of PT-482. Is it really Loop A (Blue).

N/A Question SAW.

RO Applicant [Redacted]

50 4th bullet states that EOP-0 ATT A, step A15 is verify service water system alignment. A15 is to have STA implement status trees and to inform SM of abnormalities.

EOP-0 Attachment A Question 50 requires a change to the 4th bullet.

Step A15 should be changed to step A16.